Permit Information
Permit NumberBLD12-00133
StatusFinaled
Name THE PROFESSIONALS
Site Address 404 S 8TH ST Unit: 300
Project NameBALIHOO-8TH STREET MARKETPLACE
Customer Number 
ePlanReviewNo
Description
(BALIHOO - 3RD STORY - Expansion) Permit is to combine an existing 9,345 square foot tenant space (BLD08-02360) with two adjacent tenant spaces on that floor to create a new tenant space that encompasses the entire 3rd floor of approximately 13,218 square feet. This permit is approved contingent upon adhering to the approved plans on file. Work includes: construction of new interior non-bearing walls, demolition of interior walls to create large open office areas, new lighting, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 8/16/20128/3/2012 DONE
Print Statement  8/3/2012 DONE
DetailsTisha Gallop
Third Notice 7/20/20128/2/2012 DONE
faxed to GC
Third Notice 6/12/20127/6/2012 DONE
faxed to GC
Second Notice 4/26/20126/7/2012 DONE
DetailsChristina Prado
faxed 6-7-12
First Notice 4/9/20124/16/2012 DONE
Permanent Occupancy  3/30/2012 DONE
DetailsTisha Gallop
reprint with correct parcel owner listed
FIRE-Final Inspection3/27/20123/27/20123/27/2012PPASS
DetailsForrest France
Fire life safety inspection passed.
BLD-Final3/27/20123/27/20123/27/2012PPASS
DetailsDave Hannah
Permanent Occupancy  3/27/2012 DONE
DetailsChristina Prado
FIRE-Final Inspection3/21/20123/22/20123/22/2012AFAIL
DetailsForrest France
C/N items include- remove keyed deadbolt lock at the interior door between corrdior 106 and open office 107, project related fire sprinkler permit final pending adjustments in coverage.
FIRE-Conference3/13/20123/13/20123/16/2012PDONE
DetailsForrest France
Conversation with contractor regarding plan review report notes (page 2) concerning the egress system.
Plan assigned to (TLW)1/25/2012 2/9/2012 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK2/9/2012 2/9/2012 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  2/9/2012 DONE
DetailsTim L. Woodard
Case Summary (BLD)  2/9/2012 DONE
DetailsTim L. Woodard
Print Occupancy Form  2/9/2012 DONE
Telephone call  2/9/2012 DONE
DetailsChristina Prado
Called Marvin to give fees
Permit Ready to Issue  2/9/2012 DONE
Issue PAID IN FULL permit  2/9/2012 DONE
Plan resubmittals received  2/8/2012 DONE
DetailsTisha Gallop
received response and two copies of plan sheet A1.1, A6.1; taken to Tim Woodard.
Routing - PLAN CHECK1/25/2012 2/3/2012 FAIL
DetailsTim L. Woodard
1st review completed  2/3/2012 DONE
DetailsTim L. Woodard
Plans ACCEPTED BY PLAN TECH  1/25/2012  
ok per Tim W to take in
Application received 1/25/2012