Third Notice | | 8/6/2012 | 8/14/2012 | | DONE |
|
|
|
|
Print Statement | | | 8/14/2012 | | DONE |
Tisha Gallop
|
|
|
e-mailed to Curtis Weedop
|
Second Notice | | 7/16/2012 | 8/1/2012 | | DONE |
Christina Prado
|
|
|
mailed 8/2/12
|
First Notice | | 5/31/2012 | 7/6/2012 | | DONE |
|
|
|
e-mailed to Curtis
|
Permanent Occupancy | | | 5/21/2012 | | DONE |
|
|
|
|
BLD-Final | 4/24/2012 | 4/25/2012 | 4/25/2012 | A | PASS |
Dave Hannah
|
|
|
ROCK office # ###-#### Phone #: ###-####
|
FIRE-Final Inspection | 4/23/2012 | 4/24/2012 | 4/24/2012 | A | PASS |
Forrest France
|
|
|
Previous correction items verified for completion. Life safety finaled.
|
FIRE-Conference | 4/4/2012 | 4/4/2012 | 4/4/2012 | A | DONE |
Forrest France
|
|
|
Regarding IFC 2009 sec. 1008.1.9.3
|
BLD-Final | 3/22/2012 | 3/23/2012 | 3/24/2012 | P | NR |
Dave Hannah
|
|
|
rock Phone #: ###-#### ok to move into the lower level area or phase one so they start phase two
|
FIRE-Final Inspection | 3/22/2012 | 3/23/2012 | 3/23/2012 | A | FAIL |
Forrest France
|
|
|
Noted correction items include; remove manual thumbturns at the 1st floor door 101 and 2nd floor stairway exit door hall 117, post signage at landing door 100, provide egress illumination per IFC sec. 1006 and fire code plan review note #6, missing exit signs per IFC sec. 1011. Plan set does not indicate locations for EM lights/exit signage existing or new.
|
Print Occupancy Form | | | 2/27/2012 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Framing/Rough-in | 2/22/2012 | 2/23/2012 | 2/23/2012 | A | PASS |
Dave Hannah
|
|
|
Sheet rock -- Rick Phone #: ###-####
|
Permit Ready to Issue | | | 2/21/2012 | | DONE |
Tisha Gallop
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/21/2012 | | DONE |
Tisha Gallop
|
|
|
|
Routing - FIRE | 2/16/2012 | | 2/21/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Issue & PRINT to be Invoiced | | | 2/21/2012 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/16/2012 | | 2/17/2012 | | PASS |
Tim L. Woodard
|
|
|
Approved with resubmittals. TLW
|
1st review completed | | | 2/9/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 2/3/2012 | | 2/9/2012 | | FAIL |
Tim L. Woodard
|
|
|
Refer to change marks in E-plan review. TLW
|
Routing - Erosion and Sediment | 2/3/2012 | | 2/3/2012 | | PASS |
Steven Webb
|
|
|
ESC not required.
|
Routing PW Sewer Rating | 2/2/2012 | | 2/2/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 2/2/2012 | | 2/2/2012 | | PASS |
April Wing
|
|
|
|
Routing - FIRE | 2/2/2012 | | 2/2/2012 | | FAIL |
Scott Arellano
|
|
|
Corrections needed in electronic plan review.
|
Routing - PLUMBING | 2/2/2012 | | 2/2/2012 | | PASS |
Daryl Spivey
|
|
|
Per plans and 2003 UPC.
|
Intake Approval | | | 2/2/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 2/2/2012 | | 2/2/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Telephone call | | | 2/1/2012 | | DONE |
Christina Prado
|
|
|
Sent Email to Curtis giving fees due and advising to pay to begin review
|
Plans ACCEPTED BY PLAN CHECK | | | 1/30/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 1/30/2012 | | FAIL |
Tim L. Woodard
|
|
|
Refer to notes in E-Plan Review. Contacted the applicant and refered him to the eplan review submission guide.
|
Application received | | | 1/26/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 26 2012 11:56AM
|