Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-00165
StatusFinaled
Name HC COMPANY INC
Site Address 11311 W CHINDEN BLVD
Project NameRACKING-HP BLD 7 TEST LAB EXPA
Customer Number 
ePlanReviewNo
Description
RACKING-HP BLD 7 TEST LAB EXPANSION- To relocate 240 sq.ft. of existing steel storage racks within the HP Complex. Install steel rack shelving in accordance with engineering, within the Package Test Lab created as indicated under BLD11-02973. Engineered maximum load per beam shelf is called out at 2,000# per shelf, maximum 2 shelves between vertical rack columns. One anchor per base plate. Anchor to be 1/2" Hilti Kwik Bolt TZ with minimum 3-1/2" embed, ESR-1917 copy attached. Special inspection is required. See attached Statement of Special Inspections. Rack storage to be maximum 12 ' or less in height. A seperate fire protection permit will be required for any modifications necessary to the existing fire sprinkler system. The existing fire sprinkler system shall be evaluated by a licensed fire sprinkler contractor for compliance. *drs*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/19/20157/14/2015 DONE
This permit finaled on the web by Jeff Tonkin
First Notice6/17/20156/17/20157/9/2015 DONE
DetailsJim Sly
Mailed 7-10-15
BLD-Final6/16/20156/17/20156/17/2015APASS
DetailsJim Sly
Jason Phone #: ###-####
DOC - Permit Finaled6/17/20156/17/20156/17/2015PPASS
DetailsJim Sly
Letter of compliance/Occupancy  6/17/2015 DONE
FIRE-Final Inspection6/16/20156/16/20156/16/2015PPASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection3/25/20153/31/20154/1/2015ACANC
DetailsTroy Cobbley
Jason and spoke about the need for a sprinkler verification prior to an inspection as per the on-line fire plans examiner entry.
BLD-Conference2/23/20152/24/20152/24/2015APEND
DetailsJim Sly
Let H C know permit not finaled.
CHANGE STATUS TO (ISS)  8/26/2014 DONE
Plan assigned to (DRS)7/5/20127/5/20127/20/2012 CANC
DetailsDan Stuart
Plan mod submitted under wrong permit number. Should have been for Bld12-00294, routed to Sam Zahorka on 7/20/12
Plan Modification Accepted  7/5/2012 DONE
DetailsTisha Gallop
Plan Modification accepted for Bld12-00165 (HP Bldg7-Test Lab Expansion-Racking) for minor dimension changes; submitted on plan sheet A-70100; routed to Dan Stuart.
Plan assigned to (DRS)1/31/20121/31/20122/8/2012 PASS
DetailsDan Stuart
Routing - FIRE2/7/2012 2/8/2012 PASS
DetailsScott Arellano
No comments attached to plans. Modifications to the existing automatic sprinkler system in this facility may be required for the improvements planned. The tenant improvement plans shall be reviewed by a licensed fire sprinkler contractor, to determine what, if any, modifications are necessary to maintain code compliance within the TI project area. A seperate permit will be required for any necessary modifications.
1st review completed  2/8/2012 PASS
Routing - PLAN CHECK2/8/2012 2/8/2012 PASS
DetailsDan Stuart
To permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  2/8/2012 PASS
Inspection Record Card- Bld  2/8/2012 DONE
Telephone call  2/8/2012 DONE
DetailsChristina Prado
Called Dan and gave fees due
Permit Ready to Issue  2/8/2012 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  2/8/2012 DONE
DetailsTisha Gallop
Routing - PLAN CHECK1/31/2012 2/7/2012 PASS
DetailsDan Stuart
Routing to fire code analyst.
Receive PAYMENT IN FULL  1/31/2012 DONE
DetailsBarbara Stitt
Application received 1/30/20121/30/2012 DONE
DetailsBarbara Stitt
Intake Approval  1/30/2012 PASS
DetailsDan Stuart