BLD-Final | 6/24/2019 | 6/25/2019 | 6/25/2019 | A | PASS |
Dave Hannah
|
|
|
Call for access- Ron Phone #: ###-####
|
DOC - Permit Finaled | 6/25/2019 | 6/25/2019 | 6/25/2019 | P | PASS |
Dave Hannah
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/24/2019 | | DONE |
|
|
|
Per Bob Archibald ok to reopen permit for final inspection. Fee due to reopen the permit.
|
Meeting | | | 6/24/2019 | | DONE |
|
|
|
Spoke with Bob A about reopening permit for final inspeciton only. Bob A confirmed to reopen permit with a fee due.
|
BLD-Conference | 2/20/2014 | 2/21/2014 | 2/21/2014 | A | CANC |
Tom Arcoraci
|
|
|
|
DOC - Permit Expired | 2/21/2014 | 2/21/2014 | 2/21/2014 | P | PASS |
Tom Arcoraci
|
|
|
|
DOC - Permit Finaled | 2/21/2014 | 2/21/2014 | 2/21/2014 | P | CANC |
Tom Arcoraci
|
|
|
(This activity was added in error so we have changed the case status back to Issued.)
|
BLD-Framing/Rough-in | 2/17/2012 | 2/17/2012 | 2/17/2012 | P | PASS |
Tom Arcoraci
|
|
|
mike Phone #: ###-####
|
BLD-Framing/Rough-in | 2/10/2012 | 2/13/2012 | 2/13/2012 | A | NR |
Tom Arcoraci
|
|
|
george Phone #: ###-####
|
BLD-Footing | 2/7/2012 | 2/8/2012 | 2/8/2012 | A | PASS |
Tom Arcoraci
|
|
|
jeff Phone #: ###-####
|
Application received | | 2/1/2012 | 2/1/2012 | | DONE |
Barbara Stitt
|
|
|
|
Routing Walk-In (Zoning) | 2/1/2012 | 2/1/2012 | 2/1/2012 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 2/1/2012 | 2/1/2012 | 2/1/2012 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 2/1/2012 | 2/1/2012 | 2/1/2012 | | PASS |
Perry Paine
|
|
|
|
1st review completed | | | 2/1/2012 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/1/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/1/2012 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 2/1/2012 | | DONE |
Barbara Stitt
|
|
|
|
Case Summary (BLD) | | | 2/1/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/1/2012 | | |
|
|
|
|