Third Notice | | 7/20/2012 | 7/27/2012 | | DONE |
|
|
|
|
Third Notice | | 6/12/2012 | 7/6/2012 | | DONE |
|
|
|
mailed to Bruce Poe
|
Second Notice | | 5/31/2012 | 6/7/2012 | | DONE |
Christina Prado
|
|
|
faxed 6-7-12
|
First Notice | | 5/14/2012 | 5/17/2012 | | DONE |
|
|
|
e-mailed to Bruce Poe
|
FIRE-Final Inspection | 4/3/2012 | 5/3/2012 | 5/4/2012 | A | PASS |
Forrest France
|
|
|
Final fire life safety inspection passed. Noted correction items have been finished.
|
BLD-Final | 5/2/2012 | 5/4/2012 | 5/4/2012 | A | PASS |
Mike Jordan
|
|
|
Bruce poe Phone #: ###-####. Ok for perm occ. once life/safety perms.
|
Permanent Occupancy | | | 5/4/2012 | | DONE |
Christina Prado
|
|
|
|
FIRE-Conference | 5/2/2012 | 5/2/2012 | 5/2/2012 | A | DONE |
Forrest France
|
|
|
|
Temporary Occupancy | 4/4/2012 | 7/3/2012 | 4/4/2012 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 4/2/2012 | 4/3/2012 | 4/3/2012 | P | PART |
Jim Storey
|
|
|
please call 30min prior-- Cory Phone #: ###-#### temp ok pending others.
|
FIRE-Final Inspection | 4/2/2012 | 4/3/2012 | 4/3/2012 | A | PART |
Forrest France
|
|
|
Temporary occupancy for a period of 30 days approved per R. Gervais. Items for permit final include building service heat at the lower level and a plan modification for the fire alarm system. Location of the remote annunciator was determined acceptable by the Boise Fire Dept.
|
FIRE-Final Inspection | 3/30/2012 | 4/2/2012 | 4/2/2012 | A | NR |
Forrest France
|
|
|
Items which remain for final include; door hardware at the main level office, remove surface bolt at the garage area south exit door, provide ceiling at the storage closet main floor, lacking HVAC at the lower level, project related fire alarm permit final pending plan modification.
|
BLD-Final | 3/30/2012 | 4/2/2012 | 4/2/2012 | P | PART |
Jim Storey
|
|
|
Bruce Poe-PLease call at least 30 mins prior to inspection Phone #: ###-#### ada vertical grab bars/ signage latch side of doors/ pending fire sign off.
|
BLD-Final | 3/29/2012 | 3/30/2012 | 3/30/2012 | P | CANC |
Jim Storey
|
|
|
pm first thing w b poe arch
|
FIRE-Final Inspection | 3/27/2012 | 3/29/2012 | 3/30/2012 | P | FAIL |
Forrest France
|
|
|
Project is not ready for fire life safety final due to several items. Project related fire sprinkler and alarm permits need finaled, noted missing hardware at the main entry/exit, need to mount fire extinguishers, post max. occupant load sign, missing ceiling tile, no access at some areas due to floor finishes underway. Building lacks heat at the lower level- unit heaters are missing. Remote annunciator for the fire alarm control panel does not meet location criteria per title 7 section 510.2.
|
BLD-Final | 3/27/2012 | 3/30/2012 | 3/30/2012 | A | DEFR |
Jim Storey
|
|
|
Bruce Poe Phone #: ###-####
|
BLD-Energy code compliance | 3/26/2012 | 3/29/2012 | 3/30/2012 | A | DEFR |
Jim Storey
|
|
|
bruce ( per Jim Storey 9 am ) Phone #: ###-####
|
FIRE-Conference | 3/28/2012 | 3/28/2012 | 3/28/2012 | A | DONE |
Forrest France
|
|
|
Regarding project related FIR permits and schedule for fire life safety inspection items.
|
Plan assigned to (CJW) | 2/15/2012 | 2/15/2012 | 3/2/2012 | | PASS |
Carl Westfall
|
|
|
TK's Bar (20 days - March 13) ePlanReview case
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/2/2012 | | PASS |
|
|
|
|
Permit Ready to Issue | | | 3/2/2012 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 3/2/2012 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 3/2/2012 | | DONE |
Barbara Stitt
|
|
|
|
Routing Off Site - C.D.H | 2/29/2012 | | 3/1/2012 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 2/29/2012 | | 3/1/2012 | | PASS |
Carl Westfall
|
|
|
Drawings approved with "red lines" after resubmittal review.
|
Routing - PLUMBING | 2/29/2012 | | 2/29/2012 | | PASS |
Daryl Spivey
|
|
|
Bar re-designed. Plumbing changed.
B-19's to be drained separately if used to hold ice for consumption.
per plans and 2003 UPC.
|
Routing PW Sewer Rating | 2/29/2012 | | 2/29/2012 | | PASS |
Connie Baumgartner
|
|
|
Redesigned the bar. May have added plumbing fixtures.
|
Routing - FIRE | 2/29/2012 | | 2/29/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing Off Site - C.D.H | 2/15/2012 | | 2/29/2012 | | FAIL |
Carl Westfall
|
|
|
|
Route to Impact Fee Review | 2/24/2012 | 2/29/2012 | 2/28/2012 | | PASS |
Cindy M. Gould
|
|
|
Tenant improvement no impact fees
|
1st review completed | | | 2/28/2012 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/15/2012 | | 2/24/2012 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on Feb 21 and finished on Feb 24. Revised drawings were required. See the plan review report.
|
Routing - FIRE | 2/15/2012 | | 2/20/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - Erosion and Sediment | 2/15/2012 | | 2/20/2012 | | CANC |
Clint A Smith
|
|
|
NO ESC PERMIT REQUIRED DUE TO NO LAND DISTURBING ACTIVITIES.
|
Routing PW Sewer Rating | 2/15/2012 | | 2/17/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 2/15/2012 | | 2/17/2012 | | PASS |
April Wing
|
|
|
|
Routing - PLUMBING | 2/15/2012 | | 2/16/2012 | | PASS |
Bill VanDegrift
|
|
|
Per plans and 2003 UPC.
|
Routing - PLANNING | 2/15/2012 | | 2/16/2012 | | PASS |
Susan Riggs
|
|
|
Susan Riggs - CUP11-00087
The site only requires 15 parking spaces. If the applicant is to use the 4 parking spaces in the lower southwest corer of the site, they must be compact spaces in order to provide the required 22 feet of back-up space.
|
Routing - PUBLIC WORKS | 2/15/2012 | | 2/15/2012 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 2/15/2012 | | PASS |
Jason Blais
|
|
|
Carl Madsen approved intake on 2/14/12. Plan Review Fees paid on 2/15/12.
|
Telephone call | | | 2/14/2012 | | DONE |
|
|
|
2-14-12 email has been sent to applicant fees due ///dld
|
Application received | | | 2/2/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 2 2012 1:38PM
|