BLD-Final | 5/29/2012 | 5/30/2012 | 5/30/2012 | A | PASS |
Tony Young
|
|
|
Josh; Phone #: ###-####,, signed paperwork
|
DOC - Permit Finaled | 5/30/2012 | 5/30/2012 | 5/30/2012 | P | PASS |
Tony Young
|
|
|
|
BLD-Footing | 4/24/2012 | 4/24/2012 | 4/24/2012 | P | PASS |
Tony Young
|
|
|
keith please call before going out Phone #: ###-####,, retaining wall prtion that is 4ft ond over,, ok
|
PubWorks Subgrade Approval | 4/24/2012 | 4/24/2012 | 4/24/2012 | | DONE |
Terry Records
|
|
|
Footing subgrade for LESS THAN FOUR FOOT ABOVE GRADE retainign wall approved by the geotechnical engineer.
|
Routing Walk-In (BLD) | 4/23/2012 | 4/23/2012 | 4/23/2012 | A | PASS |
Perry Paine
|
|
|
brought in geotech report
|
Issue PAID IN FULL permit | | | 3/30/2012 | | DONE |
Christina Prado
|
|
|
|
Routing Walk-In (Zoning) | 2/9/2012 | 2/9/2012 | 2/9/2012 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 2/9/2012 | 2/9/2012 | 2/9/2012 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 2/9/2012 | 2/9/2012 | 2/9/2012 | | PASS |
Perry Paine
|
|
|
|
Routing - Erosion and Sediment | 2/9/2012 | | 2/9/2012 | | PASS |
|
|
|
To ESC for plan waiver request
|
1st review completed | | | 2/9/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/9/2012 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/9/2012 | | |
|
|
|
|
Case Summary (BLD) | | | 2/9/2012 | | |
|
|
|
|
Telephone call | | | 2/9/2012 | | DONE |
Christina Prado
|
|
|
Called Mr Davis to give fees due including ESC books for homeowner RP
|
Permit Ready to Issue | | | 2/9/2012 | | DONE |
Christina Prado
|
|
|
|
Routing Walk-In (PW Hillside) | 2/3/2012 | 2/3/2012 | 2/6/2012 | P | PASS |
Terry Records
|
|
|
Footing subgrade must be approved by the applicants geotechnical engineer prior to scheduling footing inspection
|
Application received | | 2/3/2012 | | | |
|
|
|
|