Permit NumberBLD12-00221
StatusFinaled
Name STEED CONSTRUCTION
Site Address 7940 W RIFLEMAN ST Unit: 120
Project NameMATTRESS LAND
Customer Number 
ePlanReviewNo
Description
(MATTRESS LAND) Fire sprinklers used for fire area. To create a 6,311 square foot retail sales tenant space within an existing 13,550 square foot building. Work is to include a tenant demising wall, 2 restrooms accessible to the disabled, interior nonbearing walls, restroom ceilings, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. A separate permit is required for any high-rack storage. Three new roof top HVAC units will be installed on existing curbs. An interior vestibule with glass doors and glass windows will be installed at the central double leaf door. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 5/26/20125/16/2012 DONE
Third Notice 5/21/20125/16/2012 DONE
First Notice 4/19/20125/16/2012 DONE
Permanent Occupancy  4/9/2012 DONE
DetailsBarbara Stitt
BLD-Final4/3/20124/4/20124/4/2012PPASS
DetailsMike Jordan
mike Phone #: ###-####. Ok for perm occ.
FIRE-Conference4/2/20124/2/20124/2/2012PDONE
DetailsTroy Cobbley
I spoke to Mike about getting a life safety inspection completed for BLD10-00997 which is related to this project.
FIRE-Final Inspection3/30/20123/30/20123/30/2012PPASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection3/29/20123/30/20123/30/2012AFAIL
DetailsTroy Cobbley
Provide exit discharge lighting at the rear exit door.
BLD-Other3/27/20123/28/20123/28/2012APART
DetailsMike Jordan
mike Phone #: ###-####. Ceiling grid in hallway ok. Pending electrical and firesprinkler rough ins.
BLD-Framing/Rough-in3/12/20123/12/20123/12/2012PPASS
DetailsMike Jordan
Mike Phone #: ###-####. Interior steel stud walls and soffit.
Print Occupancy Form  2/29/2012 DONE
Telephone call  2/29/2012 DONE
DetailsChristina Prado
Left message for Margee giving fees due and advising permit is ready
Permit Ready to Issue  2/29/2012 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  2/29/2012 DONE
DetailsBarbara Stitt
Plan assigned to (CJW)2/6/20122/6/20122/28/2012 PASS
DetailsCarl Westfall
MATTRESS LAND (20 days - Mar 2)
Routing - PLAN CHECK2/15/2012 2/28/2012 PASS
DetailsCarl Westfall
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  2/28/2012 DONE
Plan resubmittals received  2/27/2012 DONE
DetailsChristina Prado
Received two sets of plans marked A0, A1, M0.0, H1.0, H2.1, EG1.0, E1.0 & E2.0. Also received One copy of each: ACHD Letter, Letter from Musgrove Engineering and Response letter to Carl W. Plans taken to Carl Westfall for further review
Routing - FIRE2/13/20122/13/20122/15/2012 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  2/15/2012 FAIL
Failed Plan Check
Route to Impact Fee Review2/13/20122/16/20122/14/2012 PASS
DetailsCindy M. Gould
tenant improvement no impact fees
Routing - PLAN CHECK2/8/2012 2/13/2012 FAIL
DetailsCarl Westfall
The IBC plan review was started on February 8 and finished on February 13. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS2/7/2012 2/8/2012 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating2/8/2012 2/8/2012 PASS
DetailsConnie Baumgartner
Routing - Addressing2/6/2012 2/7/2012 PASS
DetailsTerry Records
Intake Approval  2/6/2012 PASS
OK to submit for permit.
Plans ACCEPTED BY PLAN TECH  2/6/2012 DONE
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  2/6/2012 DONE
DetailsChristina Prado
Pending Assignment by JCB2/6/2012 2/6/2012 DONE
DetailsJason Blais
Application received 2/6/2012