Third Notice | | 4/21/2012 | 5/15/2012 | | DONE |
|
|
|
|
Second Notice | | 4/9/2012 | 4/16/2012 | | DONE |
Christina Prado
|
|
|
faxed 4-16-2012
|
First Notice | 3/27/2012 | 3/27/2012 | 3/30/2012 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 3/27/2012 | 3/27/2012 | 3/27/2012 | P | PASS |
Jim Sly
|
|
|
Dan Phone #: ###-#### C/C issued
|
DOC - Permit Finaled | 3/27/2012 | 3/27/2012 | 3/27/2012 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 3/27/2012 | 3/27/2012 | 3/27/2012 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. I noted to the contractor that the gate could not be locked with the padlock and I went over the specific storage issues such as height and commodity as listed with the Treasure Valley Fire Protection letter that was part of the approved plans package.
|
Issue PAID IN FULL permit | | | 2/16/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (DRS) | 2/8/2012 | 2/8/2012 | 2/14/2012 | | PASS |
Dan Stuart
|
|
|
|
Routing - PLAN CHECK | 2/8/2012 | | 2/14/2012 | | PASS |
Dan Stuart
|
|
|
Reviewed permit with Tim Frost & Scott Arellano, Fire Code plan review. Letter provided from Treasure Valley Fire Protection stating they are under contract to upgrade sprinkler system for storage racks.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/14/2012 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 2/14/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/14/2012 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 2/14/2012 | | DONE |
Barbara Stitt
|
|
|
Told Brian permit is ready & fees due on 2-14-12 @ 4:45pm//BAS
|
1st review completed | | | 2/14/2012 | | PASS |
Dan Stuart
|
|
|
|
Application received | | 2/6/2012 | 2/8/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/8/2012 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/8/2012 | | DONE |
Tisha Gallop
|
|
|
|