Third Notice | | 9/24/2012 | 9/24/2012 | | DONE |
Christina Prado
|
|
|
Done 9-24-12
|
Second Notice | | 9/2/2012 | 9/19/2012 | | DONE |
Christina Prado
|
|
|
faxed 9-19
|
First Notice | | 8/16/2012 | 8/23/2012 | | DONE |
Christina Prado
|
|
|
faxed
|
BLD-Final | 8/3/2012 | 8/6/2012 | 8/6/2012 | A | PASS |
Mike Jordan
|
|
|
Garrett Phone #: ###-####. ok for perm occ. map has been posted, emergency lighting at main enterance repaired.
|
Permanent Occupancy | | | 8/6/2012 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 8/3/2012 | 8/3/2012 | 8/3/2012 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. The exit sign/emergency light at the main entrance was non-functional but is to be repaired and shown to function to the building inspector.
|
FIRE-Final Inspection | 8/1/2012 | 8/3/2012 | 8/3/2012 | A | FAIL |
Troy Cobbley
|
|
|
Provide completion of the project related fire alarm permit and provide the three missing exit discharge lights.
|
BLD-Final | 8/1/2012 | 8/3/2012 | 8/3/2012 | P | CANC |
Mike Jordan
|
|
|
Garrett Phone #: ###-####
|
Zoning Approval | 7/10/2012 | 7/10/2012 | 7/10/2012 | | PASS |
Josh Wilson
|
|
|
|
BLD-Other | 7/2/2012 | 7/3/2012 | 7/3/2012 | A | PASS |
Dave Hannah
|
|
|
above grid for cover//Garrett Phone #: ###-####
|
BLD-Framing/Rough-in | 6/5/2012 | 6/6/2012 | 6/6/2012 | A | PASS |
Mike Jordan
|
|
|
garrett Phone #: ###-####. Canopy framing ok. Also recieved RFI for new header deatil at new opening. All work done per approved plans and RFI.
|
BLD-Framing/Rough-in | 5/17/2012 | 5/18/2012 | 5/18/2012 | A | PART |
Mike Jordan
|
|
|
Garrett Phone #: ###-####. Ok to sheet rock interior steel stud walls and hardlid areas only. RFI required for new header from design professional, not installed per approved plans. Also spoke to contractor regarding stage ramp and new door from audio room.
|
BLD-Framing/Rough-in | 4/30/2012 | 4/30/2012 | 4/30/2012 | P | NR |
Mike Jordan
|
|
|
Garrett Phone #: ###-####
|
BLD-Footing | 4/30/2012 | 4/30/2012 | 4/30/2012 | P | PASS |
Mike Jordan
|
|
|
canopy footing -- Garrett Phone #: ###-####
|
OVERRIDE | | | 4/9/2012 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/9/2012 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 4/9/2012 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 4/9/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CJW) | 2/16/2012 | 2/16/2012 | 4/6/2012 | | PASS |
Carl Westfall
|
|
|
PEACE IN JESUS LUTHERAN CHURCH (20 days - Mar 13) ePlanReview case
|
Routing - PLAN CHECK | 4/4/2012 | | 4/6/2012 | | PASS |
Carl Westfall
|
|
|
Completed the resubmittal review. Drawings approved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/6/2012 | | DONE |
|
|
|
|
Plan resubmittals received | | | 4/4/2012 | | |
|
|
|
|
Routing - FIRE | 3/27/2012 | | 3/29/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - Erosion and Sediment | 3/27/2012 | | 3/28/2012 | | DONE |
Clint A Smith
|
|
|
transfer red lines
|
Routing - PLAN CHECK | 3/22/2012 | | 3/27/2012 | | FAIL |
Carl Westfall
|
|
|
|
Plan resubmittals received | | | 3/22/2012 | | DONE |
|
|
|
|
Route to Impact Fee Review | 3/8/2012 | 3/13/2012 | 3/9/2012 | | PASS |
Cindy M. Gould
|
|
|
New area is for entry way canopy it is not enclosed, no impact fees.
|
Routing - PLAN CHECK | 2/16/2012 | | 3/8/2012 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on Feb 24 and finished on Mar 8. Revised drawings were required. See the plan review report. Because of multiple plan intakes the 1st review of this project was delayed.
|
1st review completed | | | 3/8/2012 | | DONE |
|
|
|
|
Routing - FIRE | 2/16/2012 | | 2/21/2012 | | PASS |
Scott Arellano
|
|
|
|
Routing PW Sewer Rating | 2/16/2012 | | 2/21/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 2/16/2012 | | 2/20/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00114 plan waiver approved with conditions attached tohe permit.
|
Routing - Addressing | 2/16/2012 | | 2/17/2012 | | PASS |
April Wing
|
|
|
|
Routing - PUBLIC WORKS | 2/16/2012 | | 2/16/2012 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Design Review | 2/16/2012 | | 2/16/2012 | | PASS |
Josh Wilson
|
|
|
Josh Wilson - CZC11-00258
|
Routing - PLANNING | 2/16/2012 | | 2/16/2012 | | PASS |
Sue Cummings
|
|
|
Sue Cummings - CUP11-00073
|
Routing - PLUMBING | 2/16/2012 | | 2/16/2012 | | PASS |
Bill VanDegrift
|
|
|
1. Ice makers may require backflow device.
Per plans and 2003 UPC.
|
Plan Reviewer's activity | | | 2/16/2012 | | DONE |
Jason Blais
|
|
|
Emailed architect rep to contact ACHD for evaluation of any impact fees due and if an inspection is required. Written verification from ACHD will need to be provided to our Permit Counter prior to the building permit being issued.
|
Intake Approval | | | 2/16/2012 | | PASS |
Jason Blais
|
|
|
John Menard approved intake on 2/15/12. Plan Review Fees paid on 2/16/12.
|
Intake Approval | | | 2/15/2012 | | FAIL |
John Menard
|
|
|
Please submit the following documents:
1. Please upload a completed ESC Application #701.
2. Please upload the referenced structural plan sheets.
|
Application received | | | 2/13/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 13 2012 3:52PM
|