BLD-Final | 10/10/2012 | 10/10/2012 | 10/12/2012 | P | DONE |
Tony Young
|
|
|
johnny Phone #: ###-####
|
BLD-Final | 10/10/2012 | 10/10/2012 | 10/10/2012 | A | PASS |
Tony Young
|
|
|
johnny Phone #: ###-####,, c of o issued
|
DOC - Permit Finaled | 10/10/2012 | 10/10/2012 | 10/10/2012 | P | PASS |
Tony Young
|
|
|
done
|
Routing PW Grading-Hillside | 10/10/2012 | | 10/10/2012 | | PASS |
Jim Wyllie
|
|
|
Received bonding for completion of landscape work. Temporary occupancy can be signed off on Occupancy card. Jim Wyllie (###-####)
|
BLD-Conference | 5/18/2012 | 5/21/2012 | 5/21/2012 | A | PASS |
Tony Young
|
|
|
Johnny Phone #: ###-####,, interior shear ok
|
BLD-Energy code compliance | 5/14/2012 | 5/15/2012 | 5/15/2012 | A | PASS |
Tony Young
|
|
|
JOHHNY Phone #: ###-####
|
BLD-Framing/Rough-in | 5/10/2012 | 5/10/2012 | 5/10/2012 | P | PASS |
Tony Young
|
|
|
johnny please call 30 min before going out Phone #: ###-####,, on site with contractor and framer,, a couple minor corrections to be made
|
BLD-Wall Bracing | 4/19/2012 | 4/20/2012 | 4/20/2012 | A | PART |
Tony Young
|
|
|
johnny please call 30 min before going out Phone #: ###-####,, exterior shear ok
|
BLD-Framing/Rough-in | 4/19/2012 | 4/19/2012 | 4/20/2012 | P | NR |
Tony Young
|
|
|
johnny please call 30 min before going out Phone #: ###-####,, on site conf,, need to re nail
|
BLD-Footing | 3/22/2012 | 3/22/2012 | 3/29/2012 | P | DONE |
Tony Young
|
|
|
mana Phone #: ###-####
|
BLD-Foundation | 3/27/2012 | 3/27/2012 | 3/27/2012 | P | PASS |
Jim Storey
|
|
|
Mana Phone #: ###-####
|
BLD-Foundation | 3/23/2012 | 3/26/2012 | 3/26/2012 | A | NR |
Tony Young
|
|
|
mana Phone #: ###-####,, TOO MUCH RAIN
|
BLD-Foundation | 3/22/2012 | 3/23/2012 | 3/23/2012 | P | NR |
Tony Young
|
|
|
mana Phone #: ###-####
|
BLD-Footing | 3/23/2012 | 3/23/2012 | 3/23/2012 | A | PASS |
Tony Young
|
|
|
mana Phone #: ###-####
|
PubWorks Subgrade Approval | 3/23/2012 | 3/23/2012 | 3/23/2012 | | DONE |
Terry Records
|
|
|
Footing subgrade approved by the geotechnical engineer
|
Permit Ready to Issue | | | 3/14/2012 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 3/14/2012 | | DONE |
Barbara Stitt
|
|
|
Called and told them that permit is ready, fees due and that we need RP info on 3/14/12 @ 8:30am//BAS
|
Issue PAID IN FULL permit | | | 3/14/2012 | | |
|
|
|
|
Plan assigned to (CDM) | 2/17/2012 | 2/17/2012 | 3/13/2012 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 3/12/2012 | | 3/13/2012 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/13/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/13/2012 | | DONE |
|
|
|
|
Routing - PLANNING | 3/9/2012 | | 3/12/2012 | | PASS |
David Moser
|
|
|
approved as redlined, driveway shall be 33 feet wide max in front setback
|
Routing - PUBLIC WORKS GRADING | 3/6/2012 | | 3/9/2012 | | PASS |
Terry Records
|
|
|
|
Plan resubmittals received | | | 3/6/2012 | | DONE |
Tisha Gallop
|
|
|
received three copies of G/D plan sheet 1 and two copies of revised structural calcs and plan sheets A1, A2, A3, A4, A5; inserted into plans by permit tech. and taken back to Carl Madsen.
|
Routing - PLAN CHECK | | | 3/5/2012 | | FAIL |
Carl D Madsen
|
|
|
Sheet A-3 is required to be stamped by the engineer. Called and E-Mailed James Clyde 3-5-12 CDM
|
1st review completed | | | 3/5/2012 | | FAIL |
|
|
|
Failed pending Grading. 3-5-12 CDM
|
Case Summary (BLD) | | | 3/5/2012 | | DONE |
|
|
|
|
Route to Impact Fee Review | 2/24/2012 | 2/29/2012 | 2/28/2012 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - MECHANICAL | 2/27/2012 | | 2/27/2012 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 2/24/2012 | | 2/27/2012 | | PASS |
Scott Arellano
|
|
|
No comments.
|
Routing - Erosion and Sediment | 2/23/2012 | | 2/24/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00126 plan approved with conditions attached to the permit.
|
Routing - MECHANICAL | 2/21/2012 | | 2/23/2012 | | FAIL |
Troy James
|
|
|
emailed corrections to Alley heating
|
Route to Impact Fee Review | 2/17/2012 | 2/23/2012 | 2/21/2012 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING | 2/17/2012 | | 2/21/2012 | | PASS |
David Moser
|
|
|
Approved as redlined; driveway shall be 33' max within front yard setback
|
Application received | | 2/16/2012 | 2/17/2012 | | DONE |
Tisha Gallop
|
|
|
|
Routing - Addressing | 2/17/2012 | | 2/17/2012 | | PASS |
Terry Records
|
|
|
|
Routing - PUBLIC WORKS | 2/17/2012 | | 2/17/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Grading-Hillside | 2/17/2012 | | 2/17/2012 | | FAIL |
Terry Records
|
|
|
Grading plan needs revisions at request of contractor and Geotech Engineer must recommend a revised setback from the slope at rear.
|
Plans ACCEPTED BY PLAN TECH | | | 2/16/2012 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/16/2012 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 2/16/2012 | | PASS |
Tisha Gallop
|
|
|
|