Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD12-00321
StatusFinaled
Name STEED CONSTRUCTION
Site Address 12352 W FAIRVIEW AVE
Project NamePeterson Chevy of Boise
Customer Number 
ePlanReviewYes
Description
Peterson Chevrolet-Buick-Cadillac of Boise - To construct a new 61,595 sq. ft., two story automobile dealership building and related site improvements. The building is constructed of masonry exterior walls and steel framed construction. The new building contains a repair garage, service write-up areas, parts sales and storage, automobile showroom, related administrative office areas, as well as, exterior roof covered automobile display areas. This building is fully fire sprinkled. The sprinklers are used for area increase. The building was reviewed as nonseparated areas with the S-1 Occupancy being limited occupancy. 01/25/2013 Plan was modified to add a 2,995 sq. ft. second floor, light storage, storage area at Parts Room #127. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  10/28/2013 DONE
DetailsTisha Gallop
mailed to Steed
Third Follow up  10/5/2013 DONE
DetailsTisha Gallop
Third Notice 9/4/201310/1/2013 DONE
9/9/13 recieved final cov via fax, but final value column and signature was blank.---- mailed with letter 9-30-13
Third Notice 8/4/20138/30/2013 DONE
mailed to Steed
Third Notice 7/7/20137/30/2013 DONE
faxed
Second Notice 6/14/20137/2/2013 DONE
DetailsBarbara Stitt
Faxed 7-2-13
First Notice 4/28/20136/4/2013 DONE
BLD-Final4/18/20134/18/20134/18/2013PPASS
DetailsJim Sly
Odie Phone #: ###-####
OK for Perm Occ.
Zoning Approval4/18/20134/18/20134/18/2013 DONE
DetailsAndrea Tuning
Permanent Occupancy  4/18/2013 DONE
DetailsBarbara Stitt
BLD-Final4/17/20134/18/20134/17/2013APART
DetailsJim Sly
odie Phone #: ###-####
OK for Temp Occ. OK to Perm ....When Zoning Perms.
BLD-Final4/15/20134/15/20134/15/2013PNR
DetailsJim Sly
odie Phone #: ###-####
Need Mech.......letter of approval fro MTI with Architect stamp and date.
FIRE-Final Inspection4/12/20134/15/20134/15/2013APASS
DetailsTroy Cobbley
life safety passed
Zoning Approval Temp4/15/20134/15/20134/15/2013 DONE
DetailsAndrea Tuning
30 Day Temporary Approval.
The applicant has large dirt piles within the parking area that need removed and the undeveloped portion of the site must be completed by inserting gravel, landscaping etc.
PubWorks Occupancy Approval4/15/20134/15/20134/15/2013 DONE
DetailsTiffany Lowery
FIRE-Final Inspection4/8/20134/9/20134/9/2013AFAIL
DetailsTroy Cobbley
Provide fire dept. plan review comments, provide additional fire extinguisher at the car wash and on the mezzanine, provide exit discharge light at the main showroom exit (the one installed is too far away), remove exit sign at the east showroom exit per the approved plans, provide emergency lighting in the showroom entry vestible, repair non-functioning emergency lights and exit signs, provide final inspections for the fire sprinkler permits.
BLD-Ceiling Grid Inspection3/25/20133/26/20133/26/2013APASS
DetailsJim Sly
Odie phone
BLD-Ceiling Grid Inspection3/25/20133/25/20133/25/2013PCANC
DetailsJim Sly
odie Phone #: ###-####
Re-sched........
BLD-Ceiling Grid Inspection3/15/20133/15/20133/15/2013PPART
DetailsMike Jordan
odie Phone #: ###-#### Ceiling grid from grids 4 to 7 and grids c.5 to D. Needs to provide wires to diffussers. ok for tile. Will verify on next inspection.
CHANGE STATUS TO (ISS)  3/4/2013 DONE
DetailsChristina Prado
Print Occupancy Form  3/4/2013 DONE
DetailsChristina Prado
OVERRIDE  1/30/2013  
Override - Condition Holds  1/30/2013  
Permit Ready to Issue  1/30/2013 DONE
DetailsChristina Prado
DO NOT RE-ISSUE PERMIT. Per John M & Scott A no additional hourly fees are to be charged, just fees for added value only.
Plan assigned to (JCM)1/17/20131/17/20131/29/2013 PASS
DetailsJohn Menard
Routing - PLAN CHECK1/17/2013 1/29/2013 PASS
DetailsJohn Menard
John Menard
Routing - FIRE1/28/2013 1/29/2013 PASS
DetailsScott Arellano
Approved with no changes to original conditions.
PLANS/APPL TAKEN TO FRONT DESK  1/29/2013 DONE
DetailsJohn Menard
BLD-Framing/Rough-in1/23/20131/23/20131/23/2013PPART
DetailsJim Sly
Odie ###-####
Canopy soffit framing......West and South sides of Bldg.........OK
BLD-Framing/Rough-in1/17/20131/18/20131/23/2013PCANC
DetailsJim Sly
odie Phone #: ###-####
Routing Off Site - STRUCTURAL1/18/2013 1/22/2013 PASS
DetailsJohn Menard
Plan Modification Accepted  1/17/2013  
Started plan modification work flow in projectdox
BLD-Framing/Rough-in1/3/20131/3/20131/3/2013PPART
DetailsJim Sly
ODIE Phone #: ###-####
Upper framing above canopy and select walls OK. Need all trade rough-in inspections approved ...then call for framing insp.
BLD-Conference8/17/20128/20/20128/21/2012ADONE
DetailsJim Sly
Odie ###-####
BLD-Conference8/17/20128/17/20128/17/2012PCANC
DetailsJim Sly
Phone #: ###-####
Odie not on site.....Re-sched to Mon.
BLD-Concrete8/15/20128/16/20128/16/2012ADONE
DetailsJim Sly
Rebar - Odie Phone #: ###-####
Pad OK pending MTI special inspection, tests and approvals.
BLD-Other7/11/20127/11/20127/11/2012PPASS
DetailsTom Arcoraci
gary Phone #: ###-#### mti on site
BLD-Concrete6/25/20126/26/20126/27/2012APEND
DetailsTony Young
Stem wall - gary Phone #: ###-####,, pending special inspection
BLD-Foundation6/21/20126/22/20126/22/2012PPEND
DetailsTony Young
GARY Phone #: ###-####,, pending special inspection report
BLD-Other6/18/20126/19/20126/20/2012PPART
DetailsJim Sly
Stem wall//rebar -- Gary Phone #: ###-####
E. and W. walls OK pend MTI insp.
BLD-Foundation6/13/20126/14/20126/14/2012APART
DetailsJim Sly
Gary Phone #: ###-####
N. and W. walls.....
BLD-Footing6/8/20126/11/20126/11/2012PPART
DetailsJim Sly
Gary Phone #: ###-####
S. and E. wall footings OK pend MTI special insp, tests and approvals.
BLD-Footing6/4/20126/5/20126/5/2012APART
DetailsJim Sly
Gary Phone #: ###-####
Footing ....North and partial West wall....OK pending MTI special inspections, tests and approvals.
BLD-Footing6/1/20126/4/20126/4/2012ANR
DetailsJim Sly
Gary Phone #: ###-####
Met Gary (superint)......MTI doing special inspections. Need verification of certification for all Special inspector on site for thier specialty. Need verification that MTI is not hired by contractor. MTI to provide final letter of approval at end of job......to be archived with plans.
Print Occupancy Form  5/8/2012 DONE
DetailsAlexandra L. DeYoung
Permit Ready to Issue  5/8/2012 DONE
DetailsTisha Gallop
Issue PAID IN FULL permit  5/8/2012 DONE
DetailsAlexandra L. DeYoung
Received Certificate of Value  5/7/2012 DONE
DetailsBarbara Stitt
Received initial cert of value from GC
Plan assigned to (JCM)3/1/20123/1/20125/2/2012 PASS
DetailsJohn Menard
ePlanReview
Routing - PUBLIC WORKS4/27/2012 5/2/2012 PASS
DetailsBeverly Mountain
Routing PW Street Lights5/2/2012 5/2/2012 PASS
DetailsMike D Hedge
PLANS/APPL TAKEN TO FRONT DESK  5/2/2012 DONE
DetailsJohn Menard
Routing - PLAN CHECK4/18/2012 5/2/2012 PASS
DetailsJohn Menard
Routing PW Solid Waste3/2/2012 4/26/2012 PASS
DetailsPeter J. McCullough
Routing PW Street Lights3/2/2012 4/26/2012 FAIL
DetailsMike D Hedge
Missing drawing for street lgiht pole base.
Routing - PUBLIC WORKS4/25/2012 4/25/2012 PASS
DetailsBeverly Mountain
Plan Reviewer's activity  4/24/2012 PASS
DetailsJohn Menard
Reviewed and approved structural and nonstructural revisions. JCM
Routing - FIRE4/18/2012 4/20/2012 PASS
DetailsScott Arellano
Approved with comments
Routing PW Sewer Design3/2/2012 4/19/2012 PASS
DetailsJon R. Gunnerson
Connect onto existing sanitary sewer
Routing - PUBLIC WORKS4/18/2012 4/18/2012 PASS
DetailsBeverly Mountain
Routing - Design Review4/18/2012 4/18/2012 PASS
DetailsAndrea Tuning
1st review completed  4/2/2012 FAIL
DetailsJohn Menard
Routing PW Drainage3/2/2012 4/2/2012 PASS
DetailsBrian Murphy
Routing - PLAN CHECK3/1/2012 3/29/2012 FAIL
DetailsJohn Menard
Routing - FIRE3/1/20123/6/20123/26/2012 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
Routing Off Site - STRUCTURAL3/1/2012 3/19/2012 FAIL
DetailsJohn Menard
Route to Impact Fee Review3/7/20123/12/20123/8/2012 PASS
DetailsCindy M. Gould
Routing - Addressing3/1/2012 3/6/2012 PASS
DetailsApril Wing
Address was change to 12352 W Fairview Ave. See address change form.
Routing PW Sewer Rating3/2/2012 3/6/2012 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment3/1/2012 3/5/2012 PASS
DetailsClint A Smith
ESC12-00131 plan approved with conditions attached to the permit.
Routing - PLANNING Land Div3/1/2012 3/5/2012 PASS
DetailsTodd Tucker
Routing PW Environmental3/2/2012 3/2/2012 PASS
DetailsWalt Baumgartner
approved, 2 flamm incpts noted,
Routing - PLUMBING3/1/2012 3/2/2012 PASS
DetailsBill VanDegrift
May require additional backflow protection on equipment.
Per plans and 2003 UPC.
Routing - PUBLIC WORKS3/1/2012 3/2/2012 PASS
DetailsBeverly Mountain
Route to Impact Fee Review3/1/20123/6/20123/1/2012 PASS
DetailsCindy M. Gould
Routing - Design Review3/1/2012 3/1/2012 PASS
DetailsAndrea Tuning
Andrea Tuning - DRH11-00271

***All light poles must be locted outside of the landscape planters.
Intake Approval  3/1/2012 PASS
DetailsCarl Westfall
Drawings OK to submit for permit. Plan Review Fees paid on 3/1/12.
Intake Approval  2/22/2012 FAIL
Please follow the standards for ePlanReview. An E-mail was sent to the Architect asking for a plan intake form and other changes to the plan submission. A plan intake review has not been done.
Application received  2/21/2012 DONE
Application submitted via PDS Online on Feb 21 2012 9:02AM