Third Notice | | 8/14/2012 | 8/3/2012 | | DONE |
|
|
|
|
Third Notice | | 7/7/2012 | 7/30/2012 | | DONE |
|
|
|
faxed to Gc
|
Second Notice | | 6/16/2012 | 7/2/2012 | | DONE |
|
|
|
|
First Notice | | 6/2/2012 | 6/6/2012 | | DONE |
|
|
|
|
Zoning Approval | 5/23/2012 | 5/23/2012 | 5/23/2012 | | PASS |
Sarah Schafer
|
|
|
|
Permanent Occupancy | | | 5/23/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|
BLD-Final | 5/22/2012 | 5/22/2012 | 5/22/2012 | P | PASS |
Tony Young
|
|
|
Brett Phone #: ###-####
|
FIRE-Final Inspection | 5/18/2012 | 5/18/2012 | 5/18/2012 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
PubWorks Occupancy Approval | 5/18/2012 | 5/18/2012 | 5/18/2012 | | DONE |
Brian Murphy
|
|
|
|
FIRE-Final Inspection | 5/16/2012 | 5/17/2012 | 5/17/2012 | A | FAIL |
Troy Cobbley
|
|
|
Provide annual inspection for the fire extinguishers. Provide sticker at the main exit as discussed. Remove the dead bolts from the doors and provide single action hardware as discussed.
|
Telephone call | | | 5/17/2012 | | DONE |
Sam Zahorka
|
|
|
Spoke with the Fire inspector Troy Cobbley. He requested clarification for door hardware complying with new code as per the approved plans. I answered as such: Due to this being a change of occupancy all hardware shall comply with IBC chapter 10 and 11. All hardware shall also comply with ICC ANSI/A117.1 2003.
|
BLD-Conference | 4/23/2012 | 4/23/2012 | 4/23/2012 | P | CANC |
Tony Young
|
|
|
BRETT Phone #: ###-####,, general ?s
|
Issue PAID IN FULL permit | | | 3/28/2012 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 3/23/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 3/23/2012 | | DONE |
Christina Prado
|
|
|
Called Doris and gave fees due, also advised RP & ACHD Letter are required prior to issuance
|
Permit Ready to Issue | | | 3/23/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (SRZ) | 3/7/2012 | 3/7/2012 | 3/22/2012 | | PASS |
Sam Zahorka
|
|
|
Plan reassigned to Sam Zahorka.
1st Review completed. Failed 1st Building Plan Review.
|
Routing - PUBLIC WORKS | 3/21/2012 | | 3/22/2012 | | PASS |
Connie Baumgartner
|
|
|
Plan Corrections submitted for review
|
Routing PW Drainage | 3/22/2012 | | 3/22/2012 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 3/22/2012 | | 3/22/2012 | | PASS |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 3/22/2012 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/22/2012 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 3/19/2012 | | 3/21/2012 | | PEND |
Sam Zahorka
|
|
|
Pending Public Works to Pass.
|
Plan resubmittals received | | | 3/20/2012 | | |
|
|
|
3-19-12 received 1 8 1/2 x11 cover sheet,2 shallow injection well inventory form,2 structural design,2 envelope compliance certs,2 alternate/occupancy request & 2 copies of sheets A2.0,A3.0,A4.0, & 3 copies of sheets C1.0,2.0,3.0 sent to Sam Z
|
1st review completed | | | 3/19/2012 | | FAIL |
|
|
|
Failed Public Works, Plan Check
|
Routing - FIRE | 3/14/2012 | | 3/19/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Plan Reviewer's activity | | | 3/16/2012 | | DONE |
Sam Zahorka
|
|
|
Emailed an Alternate Code Request Template to the applicant for their actual occupant load approval.
|
Meeting | | | 3/14/2012 | | DONE |
Sam Zahorka
|
|
|
Meeting with the applicants to review Building Plan Review corrections item by item. I offered assistance and suggested solutions to correct code deficiencies and requested them to verify the occupant load for their intended use of the building. Waiting for plan corrections.
|
Routing - PLAN CHECK | 3/6/2012 | | 3/14/2012 | | FAIL |
Sam Zahorka
|
|
|
|
Plan assigned to (DRS) | 2/23/2012 | 2/23/2012 | 3/7/2012 | | DEFR |
Jason Blais
|
|
|
Plans reassigned to Sam Zahorka.
|
Routing - PLANNING | 3/6/2012 | | 3/6/2012 | | PASS |
Susan Riggs
|
|
|
Susan Riggs - CAR11-00009 and CVA11-00047
Prior to C of O, applicant must provide ACHD with a sidewalk easement for any portion of the sidewalk located outside of the right-of-way.
|
Routing - Erosion and Sediment | 3/5/2012 | | 3/6/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00132 plan approved with conditions attached to the permit.
|
Routing - Design Review | 3/6/2012 | | 3/6/2012 | | PASS |
Andrea Tuning
|
|
|
Per Hal Simmons, the applicant will not be required to construct a trash enclosure and the applicant may utilize wheel carts for rubbish.
Also, please see redlines made by Susan Riggs in regard to the variance.
Andrea Tuning - DRH11-00227
|
Routing - PUBLIC WORKS | | | 3/5/2012 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Brian Murphy for drainage issues.
|
Routing PW Drainage | 2/24/2012 | | 3/5/2012 | | FAIL |
Brian Murphy
|
|
|
NEEDS SHALLOW INJECTION WELL FORM
|
Routing PW Sewer Rating | 2/24/2012 | | 2/24/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 2/23/2012 | | 2/24/2012 | | PASS |
Terry Records
|
|
|
|
Pending Assignment by JCB | 2/22/2012 | | 2/23/2012 | | DONE |
Jason Blais
|
|
|
|
Plan Reviewer's activity | | | 2/23/2012 | | DONE |
Jason Blais
|
|
|
Emailed applicant to have them contact ACHD for evaluation of any impact fees due and inspection required. Written verification from ACHD will need to be provided to our Permit Counter prior to the building permit being issued.
|
Application received | | 2/21/2012 | 2/22/2012 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 2/21/2012 | | PASS |
Tim L. Woodard
|
|
|
Intake approved. Missing square footage
|
Plans ACCEPTED BY PLAN TECH | | | 2/21/2012 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/21/2012 | | DONE |
Tisha Gallop
|
|
|
|