Permit Information
Permit NumberBLD12-00328
StatusFinaled
Name ADAME CONSTRUCTION INC
Site Address 3201 W AIRPORT WAY
Project NameBOISE AIRPORT - FOREVER HEATHE
Customer Number 
ePlanReviewNo
Description
(FOREVER HEATHER – Boise Airport – Food Court) Permit is to remodel an existing 711 square foot retail tenant space created under BLD11-02858. Approval contingent upon adhering to the approved plans on file. Work to include: construction of interior non-bearing non-combustible wall to separate off a dressing room and a storage room, new lighting, installation of a compliant security grille, and interior finishes in compliance with ch. 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  5/17/2012 DONE
DetailsTisha Gallop
BLD-Final5/16/20125/16/20125/16/2012PPASS
DetailsJim Storey
Jesse - call for access Phone #: ###-####
DOC - Permit Finaled5/16/20125/16/20125/16/2012PPASS
DetailsJim Storey
FIRE-Final Inspection5/16/20125/16/20125/16/2012APASS
DetailsForrest France
Fire life safety final inspection passed.
FIRE-Final Inspection5/9/20125/9/20125/9/2012PPASS
DetailsForrest France
Fire life safety final approved. Contractor to post signage at the main entry per detail A8.1 prior to structural final as discussed.
Issue PAID IN FULL permit  3/22/2012 DONE
DetailsTisha Gallop
Plan resubmittals received  3/1/2012  
Received 1 cover transmittal, 2 copies of letter to Tim Woodard dated 2-29-12 from Aaron Harrigfeld regarding plan review response, 2 copies of sheets A2.1, A6.1, A8.1, E2.1 and taken to Tim Woodard
Plan assigned to (TLW)2/21/2012 3/1/2012 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK3/1/2012 3/1/2012 PASS
DetailsTim L. Woodard
Approved with latest resubmittals. TLW
PLANS/APPL TAKEN TO FRONT DESK  3/1/2012 DONE
DetailsTim L. Woodard
Case Summary (BLD)  3/1/2012 DONE
DetailsTim L. Woodard
Print Occupancy Form  3/1/2012 DONE
Telephone call  3/1/2012 DONE
DetailsChristina Prado
Left message for Martin giving fees due and advising GC/RCE required
Permit Ready to Issue  3/1/2012 DONE
DetailsChristina Prado
Routing - PLAN CHECK2/21/2012 2/28/2012 FAIL
DetailsTim L. Woodard
Refer to Plan review report. TLW
1st review completed  2/28/2012 FAIL
DetailsTim L. Woodard
Refer to report
Additional plans submitted  2/23/2012 DONE
DetailsTisha Gallop
received new sheets prior to plan review, received two copies of A2.1, A6.1; taken to Tim Woodard.
Application received 2/21/20122/21/2012 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  2/21/2012 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  2/21/2012 DONE
DetailsTisha Gallop