Print Statement | | | 7/11/2013 | | DONE |
|
|
|
|
Print Statement | | | 6/24/2013 | | DONE |
|
|
|
|
Third Notice | | 5/21/2013 | 5/16/2013 | | DONE |
|
|
|
|
Second Notice | | 5/3/2013 | 5/16/2013 | | DONE |
|
|
|
|
First Notice | | 4/22/2013 | 4/23/2013 | | DONE |
|
|
|
|
Permanent Occupancy | | | 4/12/2013 | | DONE |
|
|
|
|
Change Expiration Date Only | | | 4/10/2013 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 4/2/2013 | 4/2/2013 | 4/2/2013 | P | PASS |
Jim Sly
|
|
|
chris Phone #: ###-#### OK for Perm Occ.
|
Temporary Occupancy | 3/8/2013 | 6/6/2013 | 3/8/2013 | | DONE |
Darla L Downs
|
|
|
|
BLD-Final | 3/7/2013 | 3/7/2013 | 3/7/2013 | P | PART |
Jim Sly
|
|
|
chris Phone #: ###-#### OK For Temp occ. OK for Perm Occ when all Fire Finals are complete. Need to complete stalls in center restroom
|
Zoning Approval | 3/7/2013 | 3/7/2013 | 3/7/2013 | | DONE |
Susan Riggs
|
|
|
|
FIRE-Final Inspection | 3/4/2013 | 3/4/2013 | 3/4/2013 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 3/1/2013 | 3/1/2013 | 3/1/2013 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with scott arellanos permision until the additional smoke alarm is installed in the vestibule between the staff sleeping rooms as per the city approved fire alarm plans. Once installed this device will need to be tested. I also need the final paper work. All other life safety items are ok.
|
BLD-Final | 3/1/2013 | 3/1/2013 | 3/1/2013 | P | NR |
Jim Sly
|
|
|
chris Phone #: ###-#### Need all three Fire finals, CDHD, One Mechanical permit, and Zoning Finals.
|
FIRE-Conference | 2/19/2013 | 2/19/2013 | 2/19/2013 | P | DONE |
Troy Cobbley
|
|
|
I went over life safety items with Savannah, who was on site and with Chris on the phone. The items covered included getting the fire sprinkler permit finished. Getting the fire alarm system completely installed and inspected, Life safety items included the need for a knox box, exit signs and emergency lights tested, fire extinguishers installed, all door hardware installed.
|
BLD-Conference | 11/26/2012 | 11/26/2012 | 11/26/2012 | P | DONE |
Jim Sly
|
|
|
Chris Phone #: ###-#### Met with new superintendant. OK to cover select walls ....Sleeping room areas....N. E. corner of bldg.
|
BLD-Framing/Rough-in | 10/3/2012 | 10/4/2012 | 10/5/2012 | A | PART |
Jim Sly
|
|
|
Charles Phone #: ###-#### Select walls OK to cover..... Need letter from Architect .... will install NFPA 13 fire sprinklers throughout.....therefor interior walls do not have to go up to roof deck.
|
BLD-Framing/Rough-in | 7/2/2012 | 7/3/2012 | 7/3/2012 | A | NR |
Jim Sly
|
|
|
Charles ###-#### Need all trade R/Is installed. Need Conf. with Architect ... rated walls, type of sprinkler system etc..
|
BLD-Framing/Rough-in | 7/2/2012 | 7/2/2012 | 7/2/2012 | P | NR |
Jim Sly
|
|
|
Charles Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/27/2012 | | DONE |
Tisha Gallop
|
|
|
|
OVERRIDE | | | 4/24/2012 | | |
|
|
|
|
Telephone call | | | 4/24/2012 | | DONE |
Tisha Gallop
|
|
|
called Catherine Sewell Arch. and told Jessica permit is ready, fees and need GC/RCE and RP
|
Permit Ready to Issue | | | 4/24/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (DRS) | 2/24/2012 | 2/24/2012 | 4/23/2012 | | PASS |
Dan Stuart
|
|
|
|
Routing - PLAN CHECK | 4/19/2012 | | 4/23/2012 | | PASS |
Dan Stuart
|
|
|
Approved with all plan review attachments and notes from all reviewing agencies as part of the approved plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/23/2012 | | PASS |
Dan Stuart
|
|
|
|
Print Occupancy Form | | | 4/23/2012 | | DONE |
|
|
|
|
Routing - PLANNING | 4/18/2012 | | 4/19/2012 | | PASS |
Susan Riggs
|
|
|
Prior to occupancy, all landscaping must be planted.
|
Routing - PLAN CHECK | 3/20/2012 | | 4/18/2012 | | PASS |
Dan Stuart
|
|
|
Routing back to Susan Riggs for re-review.
|
Plan resubmittals received | | | 4/18/2012 | | DONE |
Tisha Gallop
|
|
|
received transmittal, response and two copies of plan sheets G1.01, A2.00, A2.01, A2.02, A6.01; taken to Dan Stuart.
|
1st review completed | | | 3/20/2012 | | FAIL |
|
|
|
Failed Plan Check
|
Routing - FIRE | 3/17/2012 | | 3/20/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - PLAN CHECK | 3/6/2012 | | 3/17/2012 | | FAIL |
Dan Stuart
|
|
|
Resubmittals required. Copy of plan review e-mailed to architect. Plans routed to fire code analyst.
|
Plan resubmittals requested | | | 3/17/2012 | | DONE |
|
|
|
Coy of plan review e-mailed to Cathy Sewell, architect.
|
Routing - PLUMBING | 3/5/2012 | | 3/6/2012 | | PASS |
Bill VanDegrift
|
|
|
Per plans and 2003 UPC.
|
Routing - PLANNING | 3/6/2012 | | 3/6/2012 | | FAIL |
Cody Riddle
|
|
|
SUSAN RIGGS - CUP11-00032
Bonding required for the 16 upright evergreen trees.
|
Routing - Erosion and Sediment | 2/28/2012 | | 3/5/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00144 plan waiver approved with conditions attached to the permit.
|
Routing PW Environmental | 3/1/2012 | | 3/1/2012 | | PASS |
Walt Baumgartner
|
|
|
Plans indicate triple sink, DW, pre rinse sink to 1500 gallon GI.
|
Routing - PUBLIC WORKS | 2/24/2012 | | 2/28/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Plan resubmittals received | | | 2/27/2012 | | DONE |
Tisha Gallop
|
|
|
received two copies of plan sheets A2.02 & H1.0; taken to Dan Stuart.
|
Pending Assignment by JCB | 2/23/2012 | | 2/24/2012 | | DONE |
Jason Blais
|
|
|
|
Routing - Addressing | 2/24/2012 | | 2/24/2012 | | PASS |
Terry Records
|
|
|
|
Application received | | 2/23/2012 | 2/23/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/23/2012 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 2/23/2012 | | PASS |
Carl D Madsen
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/23/2012 | | DONE |
Christina Prado
|
|
|
|