Permit NumberBLD12-00377
StatusFinaled
Name Carol Vorhis
Site Address 100 S 6TH ST
Project NameCHINA BLUE
Customer Number 
ePlanReviewYes
Description
(CHINA BLUE - 2ND STORY SMOKING DECK) The fire sprinkler system is used for fire area and for story increase. To construct a 410 square foot smoking deck above the roof of an existing building. The deck will not be covered. This building has a 2 story portion and a 1 story portion. The deck will be constructed above the 1 story portion and will be elevated about 35 inches above the floor surface of the existing 2nd story. Access to the deck will be from the existing 2nd story. Work is to include LVL wood beams, wood joists, “Trexdeck” decking, guards, handrails, etc. Special Inspection is required for epoxy anchors. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  12/24/2015 DONE
DOC - Permit Finaled  12/23/2015 DONE
BLD-Final10/31/201211/1/201211/2/2012PPASS
DetailsDave Hannah
Darren Phone #: ###-####
FIRE-Final Inspection10/31/201211/1/201211/1/2012APASS
DetailsForrest France
C/N items verified for completion. Contractor to provide EM lighting at the exterior deck prior to structural final.
Zoning Approval10/2/201210/2/201210/2/2012 DONE
DetailsMatthew A Halitsky
FIRE-Conference10/1/201210/1/201210/1/2012ADONE
DetailsForrest France
Regarding fire alarm permit work.
FIRE-Final Inspection9/26/20129/27/20129/27/2012AFAIL
DetailsForrest France
Non-functional exit signs and EM lights within path of egress, PFE needs tagged and mounted, provide approved door hardware at the deck exit, missing emergency lighting at the deck, fire alarm notification to be extended per plans delta 2 and fire code review comments dated 6/13/12.
BLD-Final9/20/20129/21/20129/21/2012PFAIL
DetailsDave Hannah
request first insp//Darren Phone #: ###-#### needs hand rail and ext gaurd rail hight
BLD-Other8/31/20129/4/20129/4/2012APASS
DetailsDave Hannah
CMU inspection please-Darren Phone #: ###-####
Print Occupancy Form  8/31/2012 DONE
Permit Ready to Issue  8/31/2012 DONE
Issue PAID IN FULL permit  8/31/2012 DONE
Plan assigned to (CJW)3/19/20123/19/20126/25/2012 PASS
DetailsCarl Westfall
CHINA BLUE - 2ND STORY DECK (20 days - April 13) ePlanReview case
PLANS/APPL TAKEN TO FRONT DESK  6/25/2012 DONE
Routing - PLAN CHECK6/20/2012 6/25/2012 PASS
DetailsCarl Westfall
IBC review approved earlier. All agencies approved.
Routing - Design Review6/21/2012 6/22/2012 PASS
DetailsMatthew A Halitsky
Matt Halitsky
Plan resubmittals received  6/20/2012 DONE
Routing - PLAN CHECK6/7/2012 6/19/2012 PASS
DetailsCarl Westfall
Routed to other agencies. Delayed in Design Review.
Routing - Design Review6/8/2012 6/19/2012 FAIL
DetailsMatthew A Halitsky
Matt Halitsky
Routing - FIRE6/8/2012 6/13/2012 PASS
DetailsScott Arellano
No plan review report attached. A separate fire sprinkler and fire alarm permit will be required for the necessary fire protection system modifications.
Plan resubmittals received  6/7/2012  
Routing - Design Review4/13/2012 4/20/2012 FAIL
DetailsMatthew A Halitsky
Extended parapet
Routing - FIRE4/13/2012 4/20/2012 FAIL
DetailsScott Arellano
Correction items have not been adressed. Please review the mark up items on plan sheets A3.0 & A2.2 within e-plan review.
Routing - PLAN CHECK4/13/2012 4/17/2012 PASS
DetailsCarl Westfall
Drawings approved after resubmittal review.
Plan resubmittals received  4/13/2012 DONE
Plan Reviewer's activity  4/11/2012  
The revised sheets in ePlanReview were oriented wrong and had different file names than the original drawings. Failed the resubmittal review and asked the applicant to upload the drawings properly. The applicant had submitted revised paper drawings too. Those drawings were discarded.
Plan resubmittals received  4/11/2012 DONE
Drawings now oriented properly.
Plan resubmittals received  4/10/2012  
Received 1 response letter dated 4-6-12 to Carl Westfall, 2 copies of sheets A2.1, A2.2, A3.0 and taken to Carl Westfall's desk
Routing - PLAN CHECK3/19/2012 3/26/2012 FAIL
DetailsCarl Westfall
The IBC plan review was started on Mar 22 and finished on Mar 26. Revised drawings were required. See the plan review report.
1st review completed  3/26/2012 FAIL
Failed Building, Fire, and Planning
Routing - FIRE3/19/2012 3/20/2012 FAIL
DetailsScott Arellano
Indicated correction items within electronic plan review.
Payment Received  3/19/2012 DONE
Payment received via Govolutions
Intake Approval  3/19/2012 PASS
DetailsJason Blais
Intake passed on 3/16/12 by Tim Woodard. Plan Review Fees paid on 3/19/12.
Pending Assignment by JCB3/19/2012 3/19/2012 DONE
DetailsJason Blais
Routing - Design Review3/19/2012 3/19/2012 FAIL
DetailsMatthew A Halitsky
Matt Halitsky - DRH12-00041

Incomplete application, no elevations. Notified applicant 3-19-2012.
Routing - Addressing3/19/2012 3/19/2012 PASS
Routing - PUBLIC WORKS3/19/2012 3/19/2012 PASS
DetailsBeverly Mountain
Telephone call  3/19/2012 DONE
DetailsChristina Prado
email sent to John giving fees due
Intake Approval  3/16/2012 PASS
Intake Approval  3/15/2012 FAIL
DetailsTim L. Woodard
John,

Please upload the structural calcs. and the DR approvals into the Documents Folder of E-plan review. Also upload form # 304 and the 520 Checklist so a full prescreen can be conducted. Thank you!

Please call me at 208 384 3817 with any questions
Application received  2/28/2012 DONE
Application submitted via PDS Online on Feb 28 2012 2:19PM