Third Notice | | 12/29/2013 | 12/30/2013 | | DONE |
|
|
|
|
Print Statement | | | 12/30/2013 | | DONE |
|
|
|
|
Second Notice | | 12/9/2013 | 12/24/2013 | | DONE |
|
|
|
|
First Notice | | 11/22/2013 | 11/29/2013 | | DONE |
Christina Prado
|
|
|
mailed 12-2-13
|
BLD-Final | 11/12/2013 | 11/12/2013 | 11/12/2013 | A | PASS |
Mike Jordan
|
|
|
need final passing inspection after electrical perm sign off. Ok for perm occ.
|
Permanent Occupancy | | | 11/12/2013 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 10/31/2013 | 11/1/2013 | 11/1/2013 | P | PART |
Mike Jordan
|
|
|
mike Phone #: ###-####. Ok for temp occ. Will be ok for perm occ. electrical signs perm.
|
FIRE-Final Inspection | 10/31/2013 | 11/1/2013 | 10/31/2013 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Ceiling Grid Inspection | 10/25/2013 | 10/28/2013 | 10/28/2013 | A | PASS |
Mike Jordan
|
|
|
mike Phone #: ###-####.
|
Zoning Approval | 10/14/2013 | 10/14/2013 | 10/14/2013 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Framing/Rough-in | 10/10/2013 | 10/10/2013 | 10/10/2013 | P | PART |
Mike Jordan
|
|
|
Mike ###-####. INterior steel stud walls for new restrooms. Pending electrical and plumbing rough in inspections.
|
BLD-Final | 9/19/2013 | 9/20/2013 | 9/20/2013 | P | PART |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Ok to occupy customer lounge.
|
FIRE-Final Inspection | 9/19/2013 | 9/20/2013 | 9/20/2013 | A | PART |
Troy Cobbley
|
|
|
Life safety in the Customer Lounge passed
|
BLD-Final | 9/17/2013 | 9/17/2013 | 9/17/2013 | P | PART |
Mike Jordan
|
|
|
Mike Phone #: ###-####. sales tower issues resolved. ok to occupy sales tower and scion portion only.
|
CHANGE STATUS TO (ISS) | | | 9/17/2013 | | |
Barbara Stitt
|
|
|
Accidentally doc finaled per Mike Jordan changed to ISS
|
BLD-Final | 9/13/2013 | 9/16/2013 | 9/16/2013 | P | NR |
Mike Jordan
|
|
|
mike Phone #: ###-####. Provide handrails at sales tower elvated floor.
|
DOC - Permit Finaled | 9/16/2013 | 9/16/2013 | 9/16/2013 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 9/13/2013 | 9/16/2013 | 9/16/2013 | P | PART |
Troy Cobbley
|
|
|
The "Sales Tower" and "Scion" area life safety passed
|
BLD-Framing/Rough-in | 9/12/2013 | 9/13/2013 | 9/13/2013 | A | PART |
Mike Jordan
|
|
|
Ceiling grid inspection please-Mike Phone #: ###-####. PAtrs and customer waiting area. Pending electrical rough in inspection.
|
FIRE-Final Inspection | 9/4/2013 | 9/4/2013 | 9/6/2013 | P | DONE |
Troy Cobbley
|
|
|
Mike and I discussed the requirement for the exit discharge lighting for the north exits of the showroom area.
|
BLD-Ceiling Grid Inspection | 9/5/2013 | 9/5/2013 | 9/5/2013 | P | PART |
Mike Jordan
|
|
|
mike Phone #: ###-####. Ceiling grid at sales tower and toyota showroom ok. Pending electrical rough in inspection.
|
PubWorks Occupancy Approval | 8/26/2013 | 8/26/2013 | 8/26/2013 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Framing/Rough-in | 7/19/2013 | 7/19/2013 | 7/19/2013 | P | CANC |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 7/18/2013 | 7/19/2013 | 7/19/2013 | A | PART |
Tom Arcoraci
|
|
|
mike Phone #: ###-#### wip ok
|
FIRE-Conference | 7/12/2013 | 7/12/2013 | 7/12/2013 | P | DONE |
Troy Cobbley
|
|
|
This inspection was for approval to cover the overbuild area above the Scion area. The non-rated wood has been covered by sheet rock as discussed.
|
BLD-Framing/Rough-in | 6/28/2013 | 7/1/2013 | 7/1/2013 | A | PART |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Area 2 and 3 new store front framing. Previous issues resolved, engineers issues were repaired. Pending trades prior to cover.
|
FIRE-Conference | 6/27/2013 | 6/28/2013 | 6/28/2013 | A | DONE |
Troy Cobbley
|
|
|
Mike and I discussed the non-fire rated wood that has been installed in the parapet and options to allow it to remain.
|
BLD-Framing/Rough-in | 6/26/2013 | 6/27/2013 | 6/27/2013 | A | PART |
Mike Jordan
|
|
|
mike Phone #: ###-####. Structural steel beams and columns as well as steel stud framing for new exterior storefront in areas 2 and 3. All work per resubmittals and RFI. Work in progress still needs trades inspection. Needs to remove the OSB sheeting and provide fire treatred ply at parapet suuport.
|
BLD-Ceiling Grid Inspection | 5/28/2013 | 5/28/2013 | 5/28/2013 | P | PASS |
Mike Jordan
|
|
|
rick Phone #: ###-####. Grid at canopy at lexus dealership ok.
|
BLD-Final | 5/9/2013 | 5/10/2013 | 5/10/2013 | P | PART |
Mike Jordan
|
|
|
Area 4 please-Mike Phone #: ###-####. Temp occ for area 4, accounting office ok to occupy. temp. exit ok.
|
FIRE-Final Inspection | 5/9/2013 | 5/10/2013 | 5/10/2013 | P | PART |
Troy Cobbley
|
|
|
The "accounting" area and the temporary exit corridor has passed life safety.
|
BLD-Framing/Rough-in | 5/9/2013 | 5/10/2013 | 5/10/2013 | A | PASS |
Mike Jordan
|
|
|
Ceiling grid inspection please-Mike Phone #: ###-####. grid at hallway an temp exit at area 4.
|
BLD-Final | 5/6/2013 | 5/7/2013 | 5/7/2013 | P | PART |
Tom Arcoraci
|
|
|
Area 4 please-Mike Phone #: ###-#### ok for four
|
FIRE-Final Inspection | 5/6/2013 | 5/7/2013 | 5/7/2013 | A | PART |
Troy Cobbley
|
|
|
The "Bull Pen" in Area 4 is ok to occupy.
|
BLD-Final | 5/2/2013 | 5/3/2013 | 5/3/2013 | A | PART |
Mike Jordan
|
|
|
MIke-Areas 1 & 2 please Phone #: ###-####. Areas 1 and 2 ok to occupy only. Needs to put flushing mechanism on turning side in mens bathroom and firecaulk elec. conduit in 1 hr. exit cooridor at lid.
|
FIRE-Final Inspection | 5/1/2013 | 5/2/2013 | 5/2/2013 | P | PART |
Troy Cobbley
|
|
|
Area #1 lexus showroom/lounge/cafe, area #2 upper/lower mezzanine and area #4 bullpen life safety passed
|
FIRE-Conference | 4/30/2013 | 5/1/2013 | 5/1/2013 | P | DONE |
Troy Cobbley
|
|
|
Mike and I wnet over life safety requirements in the Lexus showroom, upper and lower mezzanine and the Sales Bull Pen.
|
FIRE-Conference | 4/26/2013 | 4/26/2013 | 4/26/2013 | P | DONE |
Troy Cobbley
|
|
|
I forwarded an email to mike with steed construction stating the code sections, IFC 907.4, where the smoke detectors being utilized for door release are required to be connected to the fire alarm system. This is in reference to the door at the bottom of the stairs from the mezzanine.
|
FIRE-Final Inspection | 4/23/2013 | 4/24/2013 | 4/25/2013 | A | FAIL |
Troy Cobbley
|
|
|
Mike actually wanted a conference. Items discussed was the need for emergency lighting in the stairwell from ther mezzanine and an exit sign at the bottom exterior exit door, provide verification from plan review that door 112B can be deleted, provide code compliant exit path from the new "Accounting" area (can not exit through open construction), provide a FIR permit for the connection of fire sprinkler control valves to the existing fire alarm system (new anti-freeze system and new riser).
|
BLD-Ceiling Grid Inspection | 4/17/2013 | 4/18/2013 | 4/18/2013 | A | PASS |
Mike Jordan
|
|
|
tony Phone #: ###-####. Ceiling grid, acct offices ok.
|
BLD-Ceiling Grid Inspection | 4/11/2013 | 4/12/2013 | 4/12/2013 | A | PART |
Mike Jordan
|
|
|
Mike Phone #: ###-####. Provide additional support wire to all diffusers. Also submitted a wriiten correction notice to provide code compliant door hardware on egress side of all doors per sheet A8.1, plan reviewers note and per architect.
|
BLD-Framing/Rough-in | 3/22/2013 | 3/25/2013 | 3/25/2013 | A | PASS |
Mike Jordan
|
|
|
mike Phone #: ###-####. New store front at grids 3 to 5 per RFI #133. Will have deferred submittAL scanned into job.
|
BLD-Framing/Rough-in | 2/22/2013 | 2/22/2013 | 2/22/2013 | P | PASS |
Mike Jordan
|
|
|
MIke Phone #: ###-####. INterior steel stud framing for lexus service and waiting room ok.
|
BLD-Framing/Rough-in | 2/19/2013 | 2/20/2013 | 2/20/2013 | A | PASS |
Mike Jordan
|
|
|
mike Phone #: ###-####. Area 1 framing fro drive- thru soffit. Area 4 framing for new storefront, north west end per deffered submittlas and RFI for in place work at this area from structural engineer. Will have submittals scanned into job.
|
BLD-Framing/Rough-in | 2/19/2013 | 2/19/2013 | 2/19/2013 | P | CANC |
Mike Jordan
|
|
|
mike Phone #: ###-####. Moved to am.
|
BLD-Framing/Rough-in | 2/1/2013 | 2/1/2013 | 2/1/2013 | P | PART |
Mike Jordan
|
|
|
mike Phone #: ###-####. Area 4 salesmans lockerrooms and area 2 mezz.
|
BLD-Framing/Rough-in | 1/22/2013 | 1/22/2013 | 1/22/2013 | P | PART |
Jim Sly
|
|
|
mike Phone #: ###-#### Engineered metal trusses at Lexus soffit/facade OK per Engineering.
|
BLD-Framing/Rough-in | 1/17/2013 | 1/18/2013 | 1/18/2013 | A | PASS |
Jim Sly
|
|
|
Mike Phone #: ###-####. Interior steel stud framing in area 4 for accounting offices and for hallway behind accounting offfices. Also reviewed all special inspection reports to date.
|
CHANGE STATUS TO (ISS) | | | 1/16/2013 | | DONE |
Tisha Gallop
|
|
|
plan mod iss
|
Print Occupancy Form | | | 1/16/2013 | | DONE |
Tisha Gallop
|
|
|
|
(F) Reprint permit | | | 1/16/2013 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 11/9/2012 | | DONE |
Barbara Stitt
|
|
|
Plan mod batch stamped and ready. Permit fees due on building permit only.
|
Plan assigned to (CJW) | 10/17/2012 | | 11/8/2012 | | PASS |
Carl Westfall
|
|
|
plan mod - Peterson Toyota (10/17)
|
Routing - PLAN CHECK | 11/1/2012 | | 11/8/2012 | | PASS |
Carl Westfall
|
|
|
(11-2-12) Routed ePlan drawings to the Consultant Structural Engineer.
(11-8-12) All items resolved.
|
Routing Off Site - STRUCTURAL | 11/2/2012 | | 11/8/2012 | | PASS |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/8/2012 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/1/2012 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 10/24/2012 | | 10/30/2012 | | FAIL |
Carl Westfall
|
|
|
Consultant Structural Engineer has a concern. See sheet S2.1.
|
Plan resubmittals requested | | | 10/30/2012 | | DONE |
|
|
|
ePlan case sent back to the Architect.
|
Routing - PLAN CHECK | 10/24/2012 | | 10/30/2012 | | |
|
|
|
The Consultant Structural Engineer has an issue.
|
Routing - PLANNING | 10/24/2012 | | 10/24/2012 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 10/17/2012 | | 10/24/2012 | | FAIL |
Carl Westfall
|
|
|
Plan modification submitted but did not pass the plan intake. Wainting for requested changes.
|
Plan Reviewer's activity | | | 10/24/2012 | | FAIL |
|
|
|
Finished the plan mod plan intake. It was rejected. The following note was sent to the Architect.
Jeff,
Please make the following changes to your plan modification submission. After you make the changes, please complete your task so that it will come back to me. I will then route it to Planning and to our Consultant Structural Engineer. Thank.
1) The Plan Modification Application is blank. Please upload a completed Plan Modification Application into the Documents Folder.
2) Please restore the dimensions for the restroom elevations on Sheet A11.2.
3) Sheet A3.1 did not properly upload. Please upload the revised sheet again.
Carl J. Westfall
Boise City IBC Plans Examiner
|
Plan Modification Accepted | | | 10/17/2012 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 10/9/2012 | 10/9/2012 | 10/9/2012 | P | PASS |
Tom Arcoraci
|
|
|
Mike Phone #: ###-#### service bay locker room ok after plumbing insp
|
Override - Parcel Holds | 10/9/2012 | 1/1/1900 | 10/9/2012 | | |
|
|
|
Framing only
|
BLD-Framing/Rough-in | 9/17/2012 | 9/17/2012 | 9/17/2012 | P | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####. interio steel stud framed walls for bull pen restrooms.
|
BLD-Foundation | 8/9/2012 | 8/9/2012 | 8/9/2012 | P | PART |
Mike Jordan
|
|
|
Pouring at 1 footing/foundation - -Mike Phone #: ###-####. Special inspector on site. Also reviewed special inspection contract and verified the special inspection agency is working for the owner.
|
BLD-Foundation | 8/7/2012 | 8/7/2012 | 8/7/2012 | P | PART |
Mike Jordan
|
|
|
Mike--Poauring at !;00 Phone #: ###-####. Stemwalls at grids 14.1,14.2 and 15.5. South stemwall for lounge, area 1.
|
BLD-Footing | 7/31/2012 | 8/1/2012 | 8/1/2012 | P | PART |
Mike Jordan
|
|
|
kim Phone #: ###-####. Area1, column and pier pad footings on grids 14.2 and 16. Footings on grids 14.1, 14.2 and 15.5 and south footing for lounge. Steed super on vacation, contacted concrete sub (Kim) and noted to have sluff cleaned out prior to concrete placement. Verified that thier will be special inspection. Will have steed verify by contract that special inspector is working for owner or design pro when steed super is back.
|
Permit Ready to Issue | | | 6/28/2012 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 6/28/2012 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 6/28/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (CJW) | 3/14/2012 | 3/14/2012 | 6/26/2012 | | PASS |
Carl Westfall
|
|
|
PETERSON TOYOTA ADDITION AND REMODEL (20 days - April 9) ePlanReview case
|
Routing Off Site - STRUCTURAL | 6/22/2012 | | 6/26/2012 | | PASS |
Carl Westfall
|
|
|
Resubmittal review done by Chris for Craig at AHJ.
|
Plan Reviewer's activity | | | 6/26/2012 | | DONE |
|
|
|
Reassigned to Chris because Craig was out all week.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/26/2012 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/21/2012 | | 6/22/2012 | | PASS |
Carl Westfall
|
|
|
Drawings approved with "red lines".
|
Plan resubmittals received | | | 6/21/2012 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/8/2012 | | 6/13/2012 | | FAIL |
Carl Westfall
|
|
|
Item 64 is still not resolved. Need analysis of the roof structure. Can it support the added HVAC units loads?
|
Routing Off Site - STRUCTURAL | 6/8/2012 | | 6/13/2012 | | FAIL |
Carl Westfall
|
|
|
Structural items not addressed.
|
Plan resubmittals received | | | 6/6/2012 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/22/2012 | | 6/5/2012 | | |
|
|
|
Completed review cycle
|
Routing Off Site - STRUCTURAL | 5/21/2012 | | 5/30/2012 | | FAIL |
Carl Westfall
|
|
|
New work flow. Old one crashed.
|
Routing - PLAN CHECK | 5/4/2012 | | 5/22/2012 | | FAIL |
Carl Westfall
|
|
|
Completed the resubmittal review. Waiting for the Structural resubmittal review. Completion delayed because of work load, slow ePlanReview response, new sheets being uploaded that were not revised, sheet files being too big and unresponsive.
|
Plan resubmittals received | | | 5/4/2012 | | |
|
|
|
|
Route to Impact Fee Review | 4/5/2012 | 4/10/2012 | 4/10/2012 | | PASS |
Cindy M. Gould
|
|
|
|
Route to Impact Fee Review | 3/14/2012 | 3/19/2012 | 4/10/2012 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | 3/14/2012 | 3/14/2012 | 4/6/2012 | | PASS |
Scott Arellano
|
|
|
Uploaded IFC plan review report to Agency comments folder. This report is part of the approved plan set and shall be onsite with the the plans.
|
1st review completed | | | 4/6/2012 | | DONE |
|
|
|
Failed Building and structural
|
Routing - PLAN CHECK | 3/14/2012 | | 4/5/2012 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on March 28 and was finished on April 5. Revised drawings were required. See the plan review report.
|
Routing Off Site - STRUCTURAL | 3/14/2012 | | 3/27/2012 | | FAIL |
|
|
|
|
Routing PW Drainage | 3/15/2012 | | 3/26/2012 | | PASS |
Brian Murphy
|
|
|
|
Routing - Erosion and Sediment | 3/14/2012 | | 3/16/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00163 plan approved with conditions attached to the permit.
|
Routing PW Sewer Rating | 3/15/2012 | | 3/15/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 3/14/2012 | | 3/15/2012 | | PASS |
April Wing
|
|
|
|
Routing - PUBLIC WORKS | 3/14/2012 | | 3/15/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLUMBING | 3/14/2012 | | 3/15/2012 | | PASS |
Bill VanDegrift
|
|
|
120 deg max to lavs note2 on page P2.4 is superceded by note 4 page C1.0
|
Routing - Design Review | 3/14/2012 | | 3/14/2012 | | PASS |
Andrea Tuning
|
|
|
The appeal period will not be up until March 15, 2012 at 5:00 pm. Please do not issue any permits until this appeal period has been exhausted. Andrea Tuning - DRH12-00046
|
Pending Assignment by JCB | 3/14/2012 | | 3/14/2012 | | DONE |
Jason Blais
|
|
|
|
Plan Reviewer's activity | | | 3/14/2012 | | DONE |
Jason Blais
|
|
|
Sent email to architect to have him contact ACHD for evaluation of impact fees and if an inspection is required. Written verification from ACHD will need to be provided to our Permit Counter prior to the permit being issued.
|
Intake Approval | | | 3/13/2012 | | PASS |
|
|
|
3-13-12) O.K. to submit drawings.
|
Intake Approval | | | 3/12/2012 | | FAIL |
|
|
|
(3-12-12) See "red lines" on revised Form 520. (1) could not find ramp details, (2) statement of special inspections not signed and stamped by the Structural Engineer, and (3) fire extinguisher locations not shown. Please modify the drawings or provide the requested information.
|
Intake Approval | | | 3/2/2012 | | FAIL |
|
|
|
(3-2-12) Please see the Plan Intake Submittal Checklist in the "Agency Comments" folder. The circled items on this report are either not provided or not shown on the drawings. Please provide the circled items.
|
Application received | | | 2/29/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 29 2012 9:26AM
|