Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD12-00388
StatusFinaled
Name PETRA INC
Site Address 3815 W RICKENBACKER ST
Project NameJackson Jet Center Hangar Addi
Customer Number 
ePlanReviewYes
Description
(JACKSON JET CENTER HANGAR ADDITION) To construct a 25,595 sq. ft., pre-engineered metal building aircraft hanger expansion on the east side of an existing hangar. To remodel a 2,680 sq. ft., two story office expansion at the north side of the existing eastern hangar. To remodel a 3,545 sq. ft., two story office expansion into an area of an existing western hangar. To construct a new 1,285 sq. ft. entry Porte-Cochere at the north terminal entry. This permit also includes related site improvements. The foundation for this addition and remodel was constructed under Building Permit BLD12-00363. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 2/3/20132/21/2013 DONE
Print Statement  2/21/2013 DONE
DetailsTisha Gallop
mailed to Petra
Third Notice 1/8/20131/29/2013 DONE
faxed to Petra
Second Notice 12/13/20121/3/2013 DONE
First Notice 11/18/201212/3/2012 DONE
BLD-Final11/8/201211/8/201211/8/2012PDONE
DetailsJim Storey
DOC - Permit Finaled11/8/201211/8/201211/8/2012PPASS
DetailsJim Storey
Permanent Occupancy  11/8/2012 DONE
DetailsBarbara Stitt
BLD-Framing/Rough-in10/9/201210/10/201210/10/2012APASS
DetailsJim Storey
JC Phone #: ###-#### ok to cover gyp on entry .
FIRE-Final Inspection10/5/201210/5/201210/5/2012PPASS
DetailsTroy Cobbley
Life safety passed per inspector 410
BLD-Framing/Rough-in10/4/201210/5/201210/5/2012APASS
DetailsJim Storey
1 hr sheet rock inspection please-JC Phone #: ###-#### ok to cover with gyp
Zoning Approval10/5/201210/5/201210/5/2012 PASS
DetailsJosh Wilson
CHANGE STATUS TO (ISS)  10/5/2012 DONE
DetailsBarbara Stitt
(F) Reprint permit  10/5/2012 DONE
DetailsBarbara Stitt
Print Occupancy Form  10/5/2012 DONE
DetailsBarbara Stitt
Routing - PLAN CHECK9/27/2012 10/2/2012 PASS
DetailsJohn Menard
Routing - FIRE9/27/2012 10/2/2012 PASS
DetailsScott Arellano
Attached plan review report to plans.
Plan assigned to (JCM)9/27/2012 10/2/2012 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  10/2/2012 DONE
DetailsJohn Menard
Plan Modification Accepted  10/2/2012 DONE
DetailsTisha Gallop
plan mod submitted via project dox
Permit Ready to Issue  10/2/2012 DONE
DetailsTisha Gallop
plan mod is ready fees due.
Routing - Design Review9/27/2012 10/1/2012 PASS
DetailsJosh Wilson
PubWorks Occupancy Approval9/14/20129/14/20129/14/2012 DONE
DetailsTiffany Lowery
BLD-Footing9/6/20129/6/20129/6/2012PPASS
DetailsJim Storey
j.c. Phone #: ###-#### ft and rebar ok for entry canopy.
FIRE-Conference8/7/20128/7/20128/27/2012ADONE
DetailsForrest France
BLD-Other8/14/20128/14/20128/14/2012PPASS
DetailsJim Storey
jc - ceiling Phone #: ###-####
BLD-Final8/9/20128/10/20128/10/2012PPART
DetailsTom Arcoraci
JC - westside Phone #: ###-#### ok to follow fire inspector instructions
FIRE-Final Inspection8/9/20128/10/20128/10/2012APART
DetailsForrest France
Fire life safety at the west side offices 1st and 2nd floor only approved pending conditions are met and maintained as discussed. Elevator is not to be used until recall service features are installed.
BLD-Other7/30/20127/31/20127/31/2012APASS
DetailsJim Storey
JC - ceiling grid Phone #: ###-####
BLD-Framing/Rough-in6/18/20126/18/20126/18/2012PPASS
DetailsJim Storey
jc Phone #: ###-#### east stair encloser reframed ok pending trades aprovals.
BLD-Framing/Rough-in6/13/20126/14/20126/14/2012APART
DetailsJim Storey
jc Phone #: ###-#### ceilling and walls west end ok to gyp
BLD-Framing/Rough-in6/6/20126/7/20126/7/2012APART
DetailsJim Storey
JC Phone #: ###-####
Print Occupancy Form  6/6/2012 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  6/6/2012 DONE
DetailsChristina Prado
Permit Ready to Issue  6/1/2012 DONE
Telephone call  6/1/2012 DONE
emailed Barb at Petra - permit ready fees due
Telephone call  5/31/2012 DONE
plans approved need GC to come in and pick up permit.
Routing - PLAN CHECK5/29/2012 5/30/2012 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  5/30/2012 DONE
DetailsJohn Menard
Plan assigned to (JCM)3/7/2012 5/30/2012 PASS
DetailsJohn Menard
Plan resubmittals received  5/29/2012 DONE
DetailsJohn Menard
Routing - PLAN CHECK5/11/2012 5/23/2012 FAIL
DetailsJohn Menard
Plan resubmittals requested  5/23/2012 DONE
DetailsJohn Menard
Plan resubmittals requested through ProjectDox
Routing Off Site - STRUCTURAL5/11/2012 5/16/2012 PASS
DetailsJohn Menard
Routing - FIRE5/11/2012 5/14/2012 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  5/14/2012 DONE
DetailsJohn Menard
Plan resubmittals requested  5/8/2012 DONE
DetailsJohn Menard
Requested revisions through ProjectDox. JCM
Routing - PLAN CHECK3/7/2012 5/8/2012 FAIL
DetailsJohn Menard
Routing - FIRE5/4/2012 5/7/2012 FAIL
DetailsScott Arellano
Faxed, emailed, and uploaded correction items to for archtiect.
Routing PW Environmental4/6/2012 4/11/2012 PASS
DetailsWalt Baumgartner
Routing Off Site - STRUCTURAL3/7/2012 4/11/2012 FAIL
DetailsJohn Menard
Routing - PLUMBING4/9/2012 4/9/2012 PASS
DetailsBill VanDegrift
ADD 3" vent to interceptor. no ABS upstream of interceptor. change name of the interceptor to flammable liquids interceptor.
Routing - PLANNING Land Div4/9/2012 4/9/2012 PASS
DetailsDave Abo
Parcel is over 5 acres in size.
Routing - PUBLIC WORKS4/6/2012 4/6/2012 PASS
DetailsBeverly Mountain
Routing - Design Review4/6/2012 4/6/2012 PASS
DetailsJosh Wilson
Routing - PUBLIC WORKS3/7/2012 4/2/2012 PASS
DetailsBeverly Mountain
Meeting  3/28/2012 DONE
Meeting held in PDS conference room #1 with Pete Rockwell, Jim Glancey, John Menard and Scott Arellano to discuss fire flow requirements and fire wall separation.
Routing - FIRE3/7/20123/7/20123/27/2012 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
Routing PW Drainage3/8/2012 3/14/2012 PASS
DetailsBrian Murphy
Routing PW Solid Waste3/8/2012 3/13/2012 PASS
DetailsPeter J. McCullough
Routing PW Sewer Rating3/8/2012 3/9/2012 PASS
DetailsConnie Baumgartner
Routing - Addressing3/7/2012 3/9/2012 PASS
DetailsApril Wing
Route to Impact Fee Review3/7/20123/12/20123/8/2012 PASS
DetailsCindy M. Gould
Routing - PLUMBING3/7/2012 3/8/2012 FAIL
DetailsDaryl Spivey
Add 3 inch vent to flammable intercepter vault and increase 2 inch vent downstream of vault to a 3 inch vent per approved flammable intercepter drawing.
Routing - Erosion and Sediment3/7/2012 3/8/2012 PASS
DetailsClint A Smith
ESC12-00167 plan approved with conditions attached to the permit.
Routing - Design Review3/7/2012 3/7/2012 PASS
DetailsJosh Wilson
Ok per DRH12-00022
Pending Assignment by JCM3/7/2012 3/7/2012 DONE
DetailsJohn Menard
Telephone call  3/5/2012 DONE
DetailsChristina Prado
Emailed Allison & Billy giving fees due for intake
Intake Approval  3/2/2012 FAIL
DetailsTim L. Woodard
Please rotate all verticle drawings and reupload them with the same name. Upon completion your project will be approved for submission. TLW
Application received  2/29/2012 DONE
Application submitted via PDS Online on Feb 29 2012 2:52PM