Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD12-00430
StatusFinaled
Name PJB CONSTRUCTION
Site Address 1124 E INSIGNIA DR
Project Name 
Customer Number 
ePlanReviewNo
Description
To complete the construction of a 3145 sq. ft. single family dwelling (original permit 07-00524)(1782 first floor, 1363 second floor) w/ a 733 sq.ft. attached garage and covered front porch of 56 sq.ft. and covered back patio of 314 sq.ft. per the approved plans, plan review report, attached engineering and any notations. A structural inspection and report is required to be completed by the structural engineer to verify that all structural elements are in compliance with the design requirements of the 2009 IBC. The inspection report is to be provided to the City structural inspector at the time of his inspection. R-2D zoning and setbacks per planning. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/21/20129/24/20129/24/2012APASS
DetailsTom Arcoraci
paul - call for access Phone #: ###-####
DOC - Permit Finaled9/24/20129/24/20129/24/2012PPASS
DetailsTom Arcoraci
BLD-Final8/28/20128/29/20128/29/2012AFAIL
DetailsJim Storey
paul please call for access Phone #: ###-#### gyp protection on steel col. in garage// firestop gyp at comon wall.c/n on site
BLD-Energy code compliance4/25/20124/26/20124/26/2012APASS
DetailsJim Storey
Larry Phone #: ###-####
BLD-Framing/Rough-in4/23/20124/24/20124/24/2012APASS
DetailsJim Storey
Larry Phone #: ###-####
BLD-Framing/Rough-in4/19/20124/20/20124/20/2012PNR
DetailsTony Young
Please call prior to arrival -- Larry Phone #: ###-####,, need trades 1st
Issue PAID IN FULL permit  4/10/2012 DONE
DetailsBarbara Stitt
OVERRIDE  4/9/2012  
Inspection Record Card- Bld  4/9/2012 DONE
Telephone call  4/9/2012 DONE
DetailsChristina Prado
Called and gave Paul fees due. He seemed surprised by the amount so I sent him to PW for sewer fee questions
Permit Ready to Issue  4/9/2012 DONE
DetailsChristina Prado
Plan assigned to (CDM)3/29/20123/29/20124/7/2012 PASS
DetailsCarl D Madsen
Case Summary (BLD)  4/7/2012 DONE
Routing - PLAN CHECK4/7/2012 4/7/2012 PASS
DetailsCarl D Madsen
Third party structural inspection is required. 4-7-12 CDM
PLANS/APPL TAKEN TO FRONT DESK  4/7/2012  
Plan resubmittals received  4/3/2012 DONE
DetailsChristina Prado
Received two copies of structural calcs: gave to Carl Madsen for additional review
Plan resubmittals received  3/29/2012 DONE
DetailsTisha Gallop
received one copy of structural calcs, truss engineering and two copies of plan sheets S1.0, S1.1, S2.0, S3.0, A2.0, A2.1, A3.0, A3.1; taken to Carl Madsen.
Plan assigned to (CDM)3/6/20123/6/20123/22/2012 PASS
DetailsCarl D Madsen
Routing - PLAN CHECK  3/22/2012 FAIL
DetailsCarl D Madsen
Complete rescheck is required 3-22-12 CDM. Called Paul Bushman.
Case Summary (BLD)  3/22/2012 DONE
1st review completed  3/22/2012 FAIL
Complete rescheck is required 3-22-12 CDM. Called Paul Bushman.
Routing - PLAN CHECK3/22/2012 3/22/2012 FAIL
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  3/22/2012  
Routing - Erosion and Sediment3/13/2012 3/14/2012 PASS
DetailsClint A Smith
Issue general permit per foundation and grading mostly completed under old permit.
Routing - FIRE3/14/2012 3/14/2012 PASS
DetailsScott Arellano
No comments.
Routing - MECHANICAL3/14/2012 3/14/2012 PASS
DetailsTroy James
Routing - MECHANICAL3/8/2012 3/12/2012 FAIL
DetailsTroy James
emailed corrections to Arctic Air
Route to Impact Fee Review3/6/20123/9/20123/9/2012 PASS
DetailsCindy M. Gould
reference PRK07-00224
Routing - PLANNING3/8/2012 3/8/2012 PASS
DetailsSue Cummings
Routing - Addressing3/6/2012 3/8/2012 PASS
DetailsTerry Records
Routing - PUBLIC WORKS3/8/2012 3/8/2012 PASS
DetailsBeverly Mountain
Routing PW Grading-Hillside  3/8/2012 PASS
DetailsTerry Records
Final grading must be approved by the applicants geotechnical engineer.
Application received 3/6/20123/7/2012 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  3/6/2012 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  3/6/2012 DONE
DetailsTisha Gallop
Intake Approval  3/6/2012 PASS
DetailsTisha Gallop