Permit Information
Permit NumberBLD12-00460
StatusFinaled
Name JAYO CONSTRUCTION
Site Address 10532 W BUSINESSPARK LN
Project NameCzarniecki & Company PLLC
Customer Number 
ePlanReviewNo
Description
(CZARNIECKI & COMPANY PLLC) This building does not have a fire sprinkler system. To prepare an existing 1,235 square foot shell space for a new office tenant. Work is to include interior nonbearing walls, a restroom accessible to the disabled, millwork, and finishes. Two layers of 5/8” Type X gypsum board will be attached to the bottom of existing roof trusses to create a 1-hr fire-resistance-rated roof-ceiling assembly. One layer of 5/8” Type X gypsum board will be attached to the inside of exterior walls to create 1-hr fire-resistance-rated exterior walls with fire exposure from the inside. One-hr fire-resistance-rated walls at interior property lines are required to be maintained. Penetrations through fire-resistance-rated membranes are required to be fire-stopped in compliance with the 2009 IBC. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PRINT ACTION LIST  2/21/2014  
Second Notice 7/9/20128/1/2012 DONE
First Notice 6/16/20126/29/2012 DONE
Permanent Occupancy  6/6/2012 DONE
DetailsChristina Prado
BLD-Final6/4/20126/5/20126/5/2012PPASS
DetailsMike Jordan
camron Phone #: ###-####. ok for perm occ.
FIRE-Final Inspection6/4/20126/5/20126/5/2012APASS
DetailsTroy Cobbley
life safety passed
BLD-Framing/Rough-in4/27/20124/30/20124/30/2012APASS
DetailsMike Jordan
Cameron - call for access Phone #: ###-####. Framing o to cover. Lid ok.
BLD-Energy code compliance4/24/20124/25/20124/25/2012PPART
DetailsMike Jordan
cameron Phone #: ###-####. Insulation ok. Pending Mech. rough in inspection. Not ok to cover until mech. rough in has passed.
BLD-Framing/Rough-in4/23/20124/24/20124/24/2012APART
DetailsMike Jordan
cameron Phone #: ###-####. ok to insulate. Pending mechanical rough in inspection.
Issue PAID IN FULL permit  4/5/2012 DONE
DetailsTisha Gallop
Plan assigned to (CJW)3/9/20123/9/20124/3/2012 PASS
DetailsCarl Westfall
CZARNIECKI & COMPANY (20 days - April 4)
Routing - PLAN CHECK3/19/2012 4/3/2012 PASS
DetailsCarl Westfall
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  4/3/2012 DONE
Print Occupancy Form  4/3/2012 DONE
Telephone call  4/3/2012 DONE
DetailsChristina Prado
Left message for Thomas giving fees due and advising GC/RCE is required prior to issuance
Permit Ready to Issue  4/3/2012 DONE
DetailsChristina Prado
Plan resubmittals received  3/30/2012 DONE
DetailsTisha Gallop
received response and two copies of plan sheets A1-2, A2-1, A4-1, A7-1, M-1, M-2, E-2; taken to Carl Westfall
Routing - FIRE3/16/20123/16/20123/19/2012 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  3/19/2012 FAIL
Failed Plan Check
Route to Impact Fee Review3/16/20123/21/20123/18/2012 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Routing - PLAN CHECK3/13/2012 3/16/2012 FAIL
DetailsCarl Westfall
Started the IBC plan review on Mar 15 and finished it on Mar 16. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS3/12/2012 3/13/2012 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating3/12/2012 3/13/2012 PASS
DetailsConnie Baumgartner
Routing - Addressing3/9/2012 3/9/2012 PASS
DetailsTerry Records
Pending Assignment by JCB3/8/2012 3/9/2012 DONE
DetailsJason Blais
Application received 3/8/20123/8/2012 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  3/8/2012 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  3/8/2012 DONE
DetailsTisha Gallop
Intake Approval  3/8/2012 PASS