Second Notice | | 9/29/2012 | 9/20/2012 | | DONE |
|
|
|
|
Third Notice | | 9/25/2012 | 9/20/2012 | | DONE |
|
|
|
|
First Notice | 9/5/2012 | 9/5/2012 | 9/19/2012 | | DONE |
Jim Storey
|
|
|
|
BLD-Final | 9/4/2012 | 9/5/2012 | 9/5/2012 | P | PASS |
Jim Storey
|
|
|
Darren Phone #: ###-#### si archived final ok
|
DOC - Permit Finaled | 9/5/2012 | 9/5/2012 | 9/5/2012 | P | PASS |
Jim Storey
|
|
|
|
PubWorks Occupancy Approval | 9/5/2012 | 9/5/2012 | 9/5/2012 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 9/5/2012 | 9/5/2012 | 9/5/2012 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Final Inspection | 8/30/2012 | 9/4/2012 | 9/4/2012 | A | PASS |
Forrest France
|
|
|
Building shell passed life safety final.
|
BLD-Energy code compliance | 7/23/2012 | 7/25/2012 | 7/25/2012 | A | PASS |
Jim Storey
|
|
|
Darren Phone #: ###-#### roof deck r-24 ok to cover/ drive thru canapy ok to cover.
|
BLD-Framing/Rough-in | 7/23/2012 | 7/24/2012 | 7/24/2012 | A | PASS |
Jim Storey
|
|
|
Darren Phone #: ###-#### soffit framing ok to cover// bottom of exterior walls screw to base track done framing ok/ window instalation in progress ok.
|
BLD-Conference | 7/19/2012 | 7/19/2012 | 7/19/2012 | P | PART |
Jim Storey
|
|
|
reviewed as to how and what roof insulation is to be used to meet r-22
|
BLD-Wall Bracing | 7/18/2012 | 7/19/2012 | 7/19/2012 | A | PART |
Jim Storey
|
|
|
Darin Phone #: ###-#### wall base atchment needed per screw sch. will check latter// roof and all other diaphram atchment ok to cover.
|
BLD-Wall Bracing | 7/17/2012 | 7/17/2012 | 7/17/2012 | P | PASS |
Tom Arcoraci
|
|
|
DARREN Phone #: ###-####
|
BLD-Framing/Rough-in | 7/11/2012 | 7/11/2012 | 7/11/2012 | P | PASS |
Jim Storey
|
|
|
Please Call Jeff Giddings @ ###-#### and give a 30 Min advanced notice. Phone #: ###-#### >> Inspection requested via web by Jeff Giddings ok to sheet exterior walls.
|
BLD-Foundation | 6/25/2012 | 6/25/2012 | 6/25/2012 | P | PASS |
Jim Storey
|
|
|
Concrete at noon - - Darren Phone #: ###-####
|
BLD-Other | 6/21/2012 | 6/22/2012 | 6/22/2012 | A | PART |
Dave Hannah
|
|
|
Stem wall -- Darren Phone #: ###-#### ok to pour north ,west and south walls
|
BLD-Footing | 6/18/2012 | 6/18/2012 | 6/18/2012 | P | PART |
Jim Sly
|
|
|
mud on site at 2pm//darren Phone #: ###-#### Garbage enclosure footing OK pending MTI special insp, tests and approvals.
|
BLD-Footing | 6/14/2012 | 6/15/2012 | 6/15/2012 | A | PASS |
Jim Storey
|
|
|
Please call at least 30 mins prior to inspection--Mud coming at 11:00am--Darren--Please call at least 30 mins prior to inspection Phone #: ###-####
|
Telephone call | | | 6/1/2012 | | DONE |
Christina Prado
|
|
|
Emailed Architect to advise plan mod ready
|
Permit Ready to Issue | | | 6/1/2012 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 6/1/2012 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 6/1/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (JCM) | 5/31/2012 | 5/31/2012 | 5/31/2012 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 5/31/2012 | | 5/31/2012 | | PASS |
John Menard
|
|
|
John Menard
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/31/2012 | | |
|
|
|
|
Plan Modification Accepted | | | 5/31/2012 | | |
John Menard
|
|
|
|
Meeting | | | 5/25/2012 | | DONE |
|
|
|
Contractor came in to submit plan mod, Sam told him it will need to be submitted online by the architect
|
Permit Ready to Issue | | | 5/3/2012 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 5/3/2012 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 5/3/2012 | | DONE |
Tisha Gallop
|
|
|
|
CHANGE ISSUED DATE | | | 5/3/2012 | | DONE |
Rita DeYoung
|
|
|
|
Routing PW Solid Waste | 4/20/2012 | | 4/30/2012 | | PASS |
Peter J. McCullough
|
|
|
Enclosure fronts ACHD "alley"
|
Routing PW Drainage | 4/20/2012 | | 4/30/2012 | | PASS |
Brian Murphy
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/30/2012 | | DONE |
John Menard
|
|
|
|
Telephone call | | | 4/30/2012 | | DONE |
Rita DeYoung
|
|
|
sent Jeff LIkes email regarding permit ready for pickup.
|
Plan assigned to (JCM) | 3/21/2012 | | 4/30/2012 | | PASS |
John Menard
|
|
|
|
Routing PW Street Lights | 4/20/2012 | | 4/26/2012 | | PASS |
Mike D Hedge
|
|
|
|
Routing - PUBLIC WORKS | 4/20/2012 | | 4/25/2012 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PLAN CHECK | 4/20/2012 | | 4/20/2012 | | PASS |
John Menard
|
|
|
|
Plan Reviewer's activity | | | 4/17/2012 | | FAIL |
John Menard
|
|
|
Approved structural, requested building code revisions - e-plan review. JCM
|
Plan resubmittals requested | | | 4/17/2012 | | DONE |
John Menard
|
|
|
Corrections requested through ProjectDox. JCM
|
1st review completed | | | 4/17/2012 | | FAIL |
John Menard
|
|
|
|
Routing - PLAN CHECK | 3/21/2012 | | 4/17/2012 | | FAIL |
John Menard
|
|
|
|
Route to Impact Fee Review | 4/10/2012 | 4/13/2012 | 4/12/2012 | | PASS |
Cindy M. Gould
|
|
|
Credit given for the removal of a building of 1755 sq ft on this lot. building size is from the Ada County web site. Fees for the difference is less than $50.00.
|
Routing - FIRE | 4/10/2012 | 4/10/2012 | 4/11/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing PW Solid Waste | 3/21/2012 | | 4/3/2012 | | FAIL |
Peter J. McCullough
|
|
|
See notes on e-plan review.
Contact # ###-####
|
Routing PW Drainage | 3/21/2012 | | 3/26/2012 | | FAIL |
Brian Murphy
|
|
|
|
Routing - Addressing | 3/26/2012 | | 3/26/2012 | | PASS |
April Wing
|
|
|
|
Routing - PLANNING Land Div | 3/21/2012 | | 3/23/2012 | | PASS |
Todd Tucker
|
|
|
|
Routing - Erosion and Sediment | 3/21/2012 | | 3/23/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00200 plan approved with conditions attached to the permit.
|
Routing - PLUMBING | 3/21/2012 | | 3/22/2012 | | PASS |
Daryl Spivey
|
|
|
Per plans and 2003 UPC.
|
Payment Received | | | 3/21/2012 | | DONE |
|
|
|
Payment received via Govolutions
|
Pending Assignment by JCM | 3/21/2012 | | 3/21/2012 | | DONE |
John Menard
|
|
|
|
Routing - Design Review | 3/21/2012 | | 3/21/2012 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLANNING | 3/21/2012 | | 3/21/2012 | | PASS |
Cody Riddle
|
|
|
|
Routing - PUBLIC WORKS | 3/21/2012 | | 3/21/2012 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Sewer Rating | 3/21/2012 | | 3/21/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Street Lights | 3/21/2012 | | 3/21/2012 | | PASS |
Mike D Hedge
|
|
|
|
Intake Approval | | | 3/20/2012 | | PASS |
|
|
|
Intake review passed.
|
Intake Approval | | | 3/19/2012 | | FAIL |
|
|
|
(3-19-12) Please label the structural drawings like they are named on the Sheet Index. For Example, Sheet S2.1 should not be named "S2.1.pdf". It should be named "S2.1 Framing Plan.pdf". Each sheet should have an accurate description of what it is.
|
Intake Approval | | | 3/13/2012 | | FAIL |
|
|
|
(3-13-12) Sheet LS-1 does not have the required clear space of 4" wide by 2" high located 3" off the right sheet edge (stamp space). Structural sheets do not have the required stamp space. Electrical sheets are oriented wrong and do not have the requried stamp space. Some Architectural drawings (e.g. A-11, A-12, A-3) do not have the required stamp space. Mechanical sheets do not have the required stamp space. Please revise the drawings to be oriented properly and to have the required stamp space.
|
Application received | | | 3/9/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 9 2012 7:52AM
|