First Notice | | 10/22/2012 | 11/7/2012 | | DONE |
|
|
|
This permit finaled on the web by Ken Litzinger
|
FIRE-Final Inspection | 10/11/2012 | 10/12/2012 | 10/12/2012 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 10/11/2012 | 10/11/2012 | 10/12/2012 | P | FAIL |
Forrest France
|
|
|
Smoke alarms on the main level outside the bedrooms do not meet spacing criteria per NFPA 72 ch 29. See also project attatched fire code review notes regarding locations required for smoke alarms.
|
Permanent Occupancy | | | 10/12/2012 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 10/11/2012 | 10/11/2012 | 10/11/2012 | P | PASS |
Tom Arcoraci
|
|
|
inspect late in the afternoon if possible. Please call 1/2 hour before inspection and i will meet you at the job site...Thanks Phone #: ###-#### >> Inspection requested via web by Ken Litzinger
|
BLD-Wall cover | 8/13/2012 | 8/13/2012 | 8/13/2012 | P | PASS |
Mike Jordan
|
|
|
Please inspect later in the afternoon if possible Thank you Phone #: ###-#### >> Inspection requested via web by Ken Litzinger
|
BLD-Energy code compliance | 7/30/2012 | 7/30/2012 | 7/30/2012 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Ken Litzinger
|
BLD-Energy code compliance | 7/26/2012 | 7/27/2012 | 7/27/2012 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Ken Litzinger
|
BLD-Framing/Rough-in | 7/24/2012 | 7/24/2012 | 7/24/2012 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Ken Litzinger
|
BLD-Framing/Rough-in | 7/22/2012 | 7/23/2012 | 7/23/2012 | P | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Ken Litzinger Inspection cancelled from web by: Ken Litzinger
|
BLD-Framing/Rough-in | 7/20/2012 | 7/20/2012 | 7/20/2012 | P | PART |
Mike Jordan
|
|
|
Please inspect later in the afternoon. call ken at ###-#### 1/2 hour before an I will meet you at the job. Thank you Phone #: ###-#### >> Inspection requested via web by Ken Litzinger. Complete lateral bracing on T5 and T7 mono trusses. Complete all fire caulking as discussed and draft stopping. Mech ri failed. Will need to recall framing inspection prior to insulating.
|
Plan resubmittals received | | | 7/2/2012 | | DONE |
|
|
|
new acca reports
|
Routing - MECHANICAL | 7/2/2012 | | 7/2/2012 | | PASS |
Troy James
|
|
|
resubmitted new acca report for units A, B, C and D
|
BLD-Wall Bracing | 6/29/2012 | 6/29/2012 | 6/29/2012 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Ken Litzinger. exterior shear nail ok.
|
BLD-Other | 6/11/2012 | 6/12/2012 | 6/12/2012 | A | DONE |
Mike Jordan
|
|
|
Have some framing questions regarding the roof framing. Please call. Thanks Phone #: ###-#### >> Inspection requested via web by Ken Litzinger
|
BLD-Foundation | 4/25/2012 | 4/25/2012 | 4/25/2012 | P | PART |
Mike Jordan
|
|
|
Later in the afternoon if possible...thanks Phone #: ###-#### >> Inspection requested via web by Ken Litzinger
|
BLD-Footing | 4/24/2012 | 4/24/2012 | 4/24/2012 | P | PART |
Mike Jordan
|
|
|
Please inspect late in the afternoon if possible. Thanks....Ken Phone #: ###-#### >> Inspection requested via web by Ken Litzinger. Perimeter footings and interior footings. Work in progress on placing vertical reinforcement.
|
Issue PAID IN FULL permit | | | 4/20/2012 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 4/18/2012 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 4/18/2012 | | DONE |
Barbara Stitt
|
|
|
Called and left message for Ken that permit is ready and fees due on 4-18-12 @ 9:00am//BAS
|
Routing - PLANNING | 4/17/2012 | | 4/17/2012 | | PASS |
Susan Riggs
|
|
|
|
Routing - PLAN CHECK | 4/17/2012 | | 4/17/2012 | | PEND |
Sam Zahorka
|
|
|
Pending ESC to pass. routed to Clint Smith.
|
Routing - Erosion and Sediment | 4/17/2012 | | 4/17/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00228 plan approved with conditions attached to the permit.
|
Routing - PLAN CHECK | 4/17/2012 | | 4/17/2012 | | PASS |
Sam Zahorka
|
|
|
SAM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/17/2012 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 4/17/2012 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 3/15/2012 | | 4/17/2012 | | PASS |
Sam Zahorka
|
|
|
1st Building plan review completed. awaiting corrections.
|
Routing - PLANNING | 4/12/2012 | | 4/13/2012 | | FAIL |
Susan Riggs
|
|
|
Routed to Susan Riggs for Final Zoning Approval
The plans are fine, I just need a cross access agreement to the parcel to the south. Spoke to Ken Litzinger and he is working on it.
|
Routing - PLAN CHECK | 4/10/2012 | | 4/12/2012 | | PEND |
Sam Zahorka
|
|
|
Pending Planning to PASS. Routed to Andrea Tuning
|
Routing - PLANNING | 4/12/2012 | | 4/12/2012 | | PASS |
Andrea Tuning
|
|
|
|
1st review completed | | | 4/10/2012 | | FAIL |
|
|
|
Failed Public Works, Erosion & Soil Control, Planning
|
Routing - FIRE | 4/4/2012 | | 4/10/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments and conditions of approval to plans.
|
Plan resubmittals received | | | 4/9/2012 | | DONE |
Christina Prado
|
|
|
Received three sets of plans marked A1, A9, A10 & S1. plans inserted by Litzinger Construction and back to given to Sam for review
|
Routing - PLAN CHECK | | | 4/4/2012 | | FAIL |
Sam Zahorka
|
|
|
SAM Z.
|
Routing - MECHANICAL | 4/3/2012 | | 4/4/2012 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 3/28/2012 | | 4/3/2012 | | FAIL |
Troy James
|
|
|
talked to geoff over the phone with corrections
orientation wrong for unit south/west corner and need report for unit south/east.
|
Plan resubmittals received | | | 3/29/2012 | | |
|
|
|
Received 2 copies of ESC plan and 2 copies of ES1 and taken and added to plans
|
Routing - PLAN CHECK | 3/22/2012 | | 3/27/2012 | | PEND |
Sam Zahorka
|
|
|
|
Routing - Erosion and Sediment | 3/26/2012 | | 3/27/2012 | | FAIL |
Clint A Smith
|
|
|
Plan waiver failed due to the size and type of project. Contacted the applicant a explained that an ESC plan is required that must be developed by a "Certified Plan Designer".
|
Routing PW Drainage | 3/26/2012 | | 3/26/2012 | | PASS |
Brian Murphy
|
|
|
|
Plan resubmittals received | | | 3/26/2012 | | |
|
|
|
Received 3 copies of sheet A-2-inserted into plans and returned to Brian Murphys desk
|
Routing - PUBLIC WORKS | 3/26/2012 | | 3/26/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING | 3/22/2012 | | 3/22/2012 | | FAIL |
Andrea Tuning
|
|
|
ZTo comply with the DR approval the applicant must maintain a fifteen foot building setback along the rear (south) property line, install two bicycle parking spaces and screen the six at grade air conditioning units, and show the drive asile extending to the south property line.
Andrea T DRH 11-00231
Susan Riggs CUP 11-00014
|
Routing - PUBLIC WORKS | 3/19/2012 | | 3/21/2012 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Brian Murphy ###-####
|
Routing PW Drainage | 3/20/2012 | | 3/21/2012 | | FAIL |
Brian Murphy
|
|
|
Just need drainage letter from architect
|
Routing - PLUMBING | 3/21/2012 | | 3/21/2012 | | PASS |
Daryl Spivey
|
|
|
1. One DCVA backflow on water service per building is required.
2. Per plans and 2003 UPC.
|
Routing PW Solid Waste | 3/20/2012 | | 3/20/2012 | | PASS |
Peter J. McCullough
|
|
|
existing subdivision
|
Routing PW Sewer Design | 3/20/2012 | | 3/20/2012 | | PASS |
Jon R. Gunnerson
|
|
|
Connect onto exisiting sanitary sewer service line provided on west boundary.
|
Routing - Addressing | 3/19/2012 | | 3/19/2012 | | PASS |
Terry Records
|
|
|
For addressing see schematic attached to Public Works routing sheet
|
Routing PW Sewer Rating | 3/19/2012 | | 3/19/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 3/15/2012 | | |
|
|
|
|
Routing - PLANNING Land Div | 3/15/2012 | | 3/15/2012 | | PASS |
Todd Tucker
|
|
|
|
Intake Approval | | | 3/15/2012 | | PASS |
Sam Zahorka
|
|
|
|
Pending Assignment by JCM | 3/15/2012 | | 3/15/2012 | | DONE |
John Menard
|
|
|
|
Intake Approval | | | 3/9/2012 | | FAIL |
Sam Zahorka
|
|
|
Refer to circled items on checklist attached to this case.
|
Application received | | 3/9/2012 | | | |
|
|
|
|