Permit Information
Permit NumberBLD12-00472
StatusFinaled
Name LITZINGER CONSTRUCTION CO
Site Address 8901 W CANDLESTON LN
Project NameCandleston Four-Plex
Customer Number 
ePlanReviewNo
Description
(Candleston Four-Plex - Lot 4) To construct a new 4,784 sq. ft., two story, four unit, apartment building. Each unit has a separate entry, are two stories, have 718 square feet on the 1st story, and 428 square feet on the 2nd story. Each unit has 2 bedrooms and two full bathrooms. All construction per the approved plans, attached plan review report, and all other reviewing agencies approvals. One hour vertical fire-partitions are required between dwelling units. This building is required to be fire sprinklered. The fire sprinkler system shall be per NFPA 13 as regulated by the fire department. DRH11-00231 & CUP11-00074 Per Planning and Zoning. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 10/22/201211/7/2012 DONE
This permit finaled on the web by Ken Litzinger
FIRE-Final Inspection10/11/201210/12/201210/12/2012APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection10/11/201210/11/201210/12/2012PFAIL
DetailsForrest France
Smoke alarms on the main level outside the bedrooms do not meet spacing criteria per NFPA 72 ch 29. See also project attatched fire code review notes regarding locations required for smoke alarms.
Permanent Occupancy  10/12/2012 DONE
DetailsBarbara Stitt
BLD-Final10/11/201210/11/201210/11/2012PPASS
DetailsTom Arcoraci
inspect late in the afternoon if possible. Please call 1/2 hour before inspection and i will meet you at the job site...Thanks Phone #: ###-#### >> Inspection requested via web by Ken Litzinger
BLD-Wall cover8/13/20128/13/20128/13/2012PPASS
DetailsMike Jordan
Please inspect later in the afternoon if possible Thank you Phone #: ###-#### >> Inspection requested via web by Ken Litzinger
BLD-Energy code compliance7/30/20127/30/20127/30/2012APASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Ken Litzinger
BLD-Energy code compliance7/26/20127/27/20127/27/2012ANR
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Ken Litzinger
BLD-Framing/Rough-in7/24/20127/24/20127/24/2012PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Ken Litzinger
BLD-Framing/Rough-in7/22/20127/23/20127/23/2012PCANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Ken Litzinger Inspection cancelled from web by: Ken Litzinger
BLD-Framing/Rough-in7/20/20127/20/20127/20/2012PPART
DetailsMike Jordan
Please inspect later in the afternoon. call ken at ###-#### 1/2 hour before an I will meet you at the job. Thank you Phone #: ###-#### >> Inspection requested via web by Ken Litzinger. Complete lateral bracing on T5 and T7 mono trusses. Complete all fire caulking as discussed and draft stopping. Mech ri failed. Will need to recall framing inspection prior to insulating.
Plan resubmittals received  7/2/2012 DONE
new acca reports
Routing - MECHANICAL7/2/2012 7/2/2012 PASS
DetailsTroy James
resubmitted new acca report for units A, B, C and D
BLD-Wall Bracing6/29/20126/29/20126/29/2012PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Ken Litzinger. exterior shear nail ok.
BLD-Other6/11/20126/12/20126/12/2012ADONE
DetailsMike Jordan
Have some framing questions regarding the roof framing. Please call. Thanks Phone #: ###-#### >> Inspection requested via web by Ken Litzinger
BLD-Foundation4/25/20124/25/20124/25/2012PPART
DetailsMike Jordan
Later in the afternoon if possible...thanks Phone #: ###-#### >> Inspection requested via web by Ken Litzinger
BLD-Footing4/24/20124/24/20124/24/2012PPART
DetailsMike Jordan
Please inspect late in the afternoon if possible. Thanks....Ken Phone #: ###-#### >> Inspection requested via web by Ken Litzinger. Perimeter footings and interior footings. Work in progress on placing vertical reinforcement.
Issue PAID IN FULL permit  4/20/2012 DONE
DetailsTisha Gallop
Permit Ready to Issue  4/18/2012 DONE
DetailsBarbara Stitt
Telephone call  4/18/2012 DONE
DetailsBarbara Stitt
Called and left message for Ken that permit is ready and fees due on 4-18-12 @ 9:00am//BAS
Routing - PLANNING4/17/2012 4/17/2012 PASS
DetailsSusan Riggs
Routing - PLAN CHECK4/17/2012 4/17/2012 PEND
DetailsSam Zahorka
Pending ESC to pass. routed to Clint Smith.
Routing - Erosion and Sediment4/17/2012 4/17/2012 PASS
DetailsClint A Smith
ESC12-00228 plan approved with conditions attached to the permit.
Routing - PLAN CHECK4/17/2012 4/17/2012 PASS
DetailsSam Zahorka
SAM
PLANS/APPL TAKEN TO FRONT DESK  4/17/2012 DONE
DetailsSam Zahorka
Print Occupancy Form  4/17/2012 DONE
Plan assigned to (SRZ)3/15/2012 4/17/2012 PASS
DetailsSam Zahorka
1st Building plan review completed. awaiting corrections.
Routing - PLANNING4/12/2012 4/13/2012 FAIL
DetailsSusan Riggs
Routed to Susan Riggs for Final Zoning Approval
The plans are fine, I just need a cross access agreement to the parcel to the south. Spoke to Ken Litzinger and he is working on it.
Routing - PLAN CHECK4/10/2012 4/12/2012 PEND
DetailsSam Zahorka
Pending Planning to PASS. Routed to Andrea Tuning
Routing - PLANNING4/12/2012 4/12/2012 PASS
DetailsAndrea Tuning
1st review completed  4/10/2012 FAIL
Failed Public Works, Erosion & Soil Control, Planning
Routing - FIRE4/4/2012 4/10/2012 PASS
DetailsScott Arellano
Attached IFC comments and conditions of approval to plans.
Plan resubmittals received  4/9/2012 DONE
DetailsChristina Prado
Received three sets of plans marked A1, A9, A10 & S1. plans inserted by Litzinger Construction and back to given to Sam for review
Routing - PLAN CHECK  4/4/2012 FAIL
DetailsSam Zahorka
SAM Z.
Routing - MECHANICAL4/3/2012 4/4/2012 PASS
DetailsTroy James
Routing - MECHANICAL3/28/2012 4/3/2012 FAIL
DetailsTroy James
talked to geoff over the phone with corrections
orientation wrong for unit south/west corner and need report for unit south/east.
Plan resubmittals received  3/29/2012  
Received 2 copies of ESC plan and 2 copies of ES1 and taken and added to plans
Routing - PLAN CHECK3/22/2012 3/27/2012 PEND
DetailsSam Zahorka
Routing - Erosion and Sediment3/26/2012 3/27/2012 FAIL
DetailsClint A Smith
Plan waiver failed due to the size and type of project. Contacted the applicant a explained that an ESC plan is required that must be developed by a "Certified Plan Designer".
Routing PW Drainage3/26/2012 3/26/2012 PASS
DetailsBrian Murphy
Plan resubmittals received  3/26/2012  
Received 3 copies of sheet A-2-inserted into plans and returned to Brian Murphys desk
Routing - PUBLIC WORKS3/26/2012 3/26/2012 PASS
DetailsConnie Baumgartner
Routing - PLANNING3/22/2012 3/22/2012 FAIL
DetailsAndrea Tuning
ZTo comply with the DR approval the applicant must maintain a fifteen foot building setback along the rear (south) property line, install two bicycle parking spaces and screen the six at grade air conditioning units, and show the drive asile extending to the south property line.


Andrea T DRH 11-00231

Susan Riggs CUP 11-00014
Routing - PUBLIC WORKS3/19/2012 3/21/2012 FAIL
DetailsConnie Baumgartner
Failed by Brian Murphy ###-####
Routing PW Drainage3/20/2012 3/21/2012 FAIL
DetailsBrian Murphy
Just need drainage letter from architect
Routing - PLUMBING3/21/2012 3/21/2012 PASS
DetailsDaryl Spivey
1. One DCVA backflow on water service per building is required.
2. Per plans and 2003 UPC.
Routing PW Solid Waste3/20/2012 3/20/2012 PASS
DetailsPeter J. McCullough
existing subdivision
Routing PW Sewer Design3/20/2012 3/20/2012 PASS
DetailsJon R. Gunnerson
Connect onto exisiting sanitary sewer service line provided on west boundary.
Routing - Addressing3/19/2012 3/19/2012 PASS
DetailsTerry Records
For addressing see schematic attached to Public Works routing sheet
Routing PW Sewer Rating3/19/2012 3/19/2012 PASS
DetailsConnie Baumgartner
Plan routing begun/NEW & ADDTN  3/15/2012  
Routing - PLANNING Land Div3/15/2012 3/15/2012 PASS
DetailsTodd Tucker
Intake Approval  3/15/2012 PASS
DetailsSam Zahorka
Pending Assignment by JCM3/15/2012 3/15/2012 DONE
DetailsJohn Menard
Intake Approval  3/9/2012 FAIL
DetailsSam Zahorka
Refer to circled items on checklist attached to this case.
Application received 3/9/2012