BLD-Final | 5/4/2012 | 5/7/2012 | 5/7/2012 | A | PASS |
Dave Hannah
|
|
|
zack please call before going out Phone #: ###-####
|
DOC - Permit Finaled | 5/7/2012 | 5/7/2012 | 5/7/2012 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Footing | 4/6/2012 | 4/6/2012 | 4/6/2012 | P | PASS |
Tony Young
|
|
|
Column base -- Mike Phone #: ###-####
|
PubWorks Subgrade Approval | 4/6/2012 | 4/6/2012 | 4/6/2012 | | DONE |
Terry Records
|
|
|
Footing subgrade approved by the geotechnical engineer
|
Routing Walk-In (PW Hillside) | 3/9/2012 | 3/9/2012 | 3/9/2012 | A | PASS |
Terry Records
|
|
|
Footing subgrade must be approved by the applicants geotechnical engineer prior to scheduling footing inspection
|
Routing Walk-In (Zoning) | 3/9/2012 | 3/9/2012 | 3/9/2012 | A | PASS |
Joshua Johnson
|
|
|
|
Routing Walk-In (BLD) | 3/9/2012 | 3/9/2012 | 3/9/2012 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 3/9/2012 | 3/9/2012 | 3/9/2012 | | PASS |
Perry Paine
|
|
|
|
1st review completed | | | 3/9/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/9/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/9/2012 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 3/9/2012 | | DONE |
Christina Prado
|
|
|
|
Case Summary (BLD) | | | 3/9/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/9/2012 | | |
|
|
|
|
Application received | | 3/9/2012 | | | |
|
|
|
|