Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD12-00479
StatusFinaled
Name JORDAN WILCOMB CONSTRUCTION
Site Address 960 S BROADWAY AVE Unit: 500
Project NameUniversity Plaza Ste # 500
Customer Number 
ePlanReviewNo
Description
(PETROGLYPH ENERGY - University Plaza - STE#500) Permit is to remodel an existing 10,185 square foot office tenant. This permit is approved contingent upon adhering to the approved plans on file. Work includes: construction of new interior non-bearing walls to create a three private office areas, installation of new glass panels, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  10/18/2012 DONE
DetailsTisha Gallop
e-mailed to Russ Hibbs/Jordan Wilcomb Const. and mailed hard copy to company
Third Follow up  10/16/2012 DONE
DetailsTisha Gallop
on hold- received 10/18/12
Third Notice 8/14/20129/20/2012 DONE
faxed w/letter
Third Notice 7/20/20127/30/2012 DONE
faxed
Third Notice 6/12/20127/6/2012 DONE
faxed
Second Notice 5/26/20126/7/2012 DONE
First Notice4/19/20124/19/20125/16/2012 DONE
DetailsMike Jordan
FIRE-Final Inspection4/18/20124/18/20124/19/2012PPASS
DetailsForrest France
Inspection passed. Fire life safety finaled.
BLD-Final4/18/20124/19/20124/19/2012APASS
DetailsMike Jordan
john Phone #: ###-####
DOC - Permit Finaled4/19/20124/19/20124/19/2012PPASS
DetailsMike Jordan
Certificate of completion issued.
FIRE-Conference3/26/20123/26/20123/30/2012PDONE
DetailsForrest France
Regarding project related FIR permits and life safety items.
BLD-Framing/Rough-in3/22/20123/23/20123/23/2012PPASS
DetailsTom Arcoraci
John Phone #: ###-####
Plan assigned to (TLW)3/12/2012 3/19/2012 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK3/12/2012 3/19/2012 PASS
DetailsTim L. Woodard
Approved with redlines. Tim Woodard
1st review completed  3/19/2012 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  3/19/2012 DONE
DetailsTim L. Woodard
Case Summary (BLD)  3/19/2012 DONE
DetailsTim L. Woodard
Case Summary (BLD)  3/19/2012 DONE
DetailsTim L. Woodard
Inspection Record Card- Bld  3/19/2012 DONE
Permit Ready to Issue  3/19/2012 DONE
DetailsTisha Gallop
Telephone call  3/19/2012 DONE
DetailsTisha Gallop
called Rob Thornton and told him permit is ready, fee and need GC form
Issue PAID IN FULL permit  3/19/2012 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  3/12/2012 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  3/12/2012 DONE
DetailsBarbara Stitt
Intake Approval  3/12/2012 PASS
DetailsDan Stuart
Application received  3/9/2012 DONE
Application submitted via PDS Online on Mar 9 2012 10:49AM