Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD12-00483
StatusFinaled
Name STEPHEN PANZELLA
Site Address 1249 S VINNELL WAY
Project NameSOCIAL SECURITY ADMINISTRATION
Customer Number 
ePlanReviewNo
Description
(SOCIAL SECURITY ADMINISTRATION – Training Room Remodel - 1ST STORY) This building is fire sprinklered for area increase. To rearrange interior nonbearing walls to create a private training area within the existing SSA area. PLAN MODIFICATION 4-2-12 – Modification submitted to expand the proposed training room into the adjacent hallway creating a 426 square foot training room. **TLW** Work is to include interior nonbearing walls, minor electrical, relocated doors, interior finishes, and alterations to the suspended acoustical ceiling system. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 8/4/20128/2/2012 DONE
Second Notice 7/16/20127/30/2012 DONE
faxed to Stephen Panzella
First Notice5/15/20125/15/20127/6/2012 DONE
DetailsMike Jordan
faxed to Stephen Panzella
BLD-Final5/15/20125/15/20125/15/2012PPASS
DetailsMike Jordan
Steve Phone #: ###-####
DOC - Permit Finaled5/15/20125/15/20125/15/2012PPASS
DetailsMike Jordan
BLD-Final5/14/20125/14/20125/14/2012PNR
DetailsMike Jordan
Steve Phone #: ###-####
FIRE-Final Inspection5/14/20125/14/20125/14/2012PPASS
DetailsTroy Cobbley
life safety passed
BLD-Other4/12/20124/13/20124/13/2012APASS
DetailsMike Jordan
Ceiling -- Steve Phone #: ###-####.
BLD-Other4/4/20124/4/20124/4/2012PFAIL
DetailsMike Jordan
STEVE Phone #: ###-####. Ceiling grid.
Inspection Record Card- Bld  4/3/2012 DONE
Telephone call  4/3/2012 DONE
DetailsChristina Prado
Called Richard and gave fees due
Override - Parcel Holds  4/3/2012  
CHANGE STATUS TO (ISS)  4/3/2012 DONE
DetailsChristina Prado
Plan assigned to (TLW)3/27/2012 4/2/2012 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK3/27/2012 4/2/2012 PASS
DetailsTim L. Woodard
Case Summary (BLD)  4/2/2012 DONE
DetailsTim L. Woodard
Plan Modification Accepted  3/27/2012 DONE
DetailsTisha Gallop
Plan modification accepted for Bld12-00483 (Social Security Admin - trainin room) to remove and existing non-bearing partition to increase space in training room 137; submitted on plan sheets a2.11, a2.31; routed to Tim Woodard.
BLD-Framing/Rough-in3/22/20123/23/20123/23/2012PPASS
DetailsMike Jordan
Steve Phone #: ###-####
Issue PAID IN FULL permit  3/21/2012 DONE
DetailsChristina Prado
Stephen with Rubicon GSA II BLM LLC signed the GC form as parcel owner. We have a different name in the system as well as Assessors office. Stephen will contact Ada Co Land Records to correct issue and get name changed. For now it is ok to issue until name is corrected per Rita
Plan assigned to (TLW)3/9/2012 3/15/2012 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  3/15/2012 DONE
DetailsTim L. Woodard
Case Summary (BLD)  3/15/2012 DONE
DetailsTim L. Woodard
Inspection Record Card- Bld  3/15/2012 DONE
Permit Ready to Issue  3/15/2012 DONE
DetailsTisha Gallop
Telephone call  3/15/2012 DONE
DetailsTisha Gallop
called Stephen and left vm permit is ready, no fees due, and need GC/RCE/form
Routing - PLAN CHECK3/9/2012 3/14/2012 PASS
DetailsTim L. Woodard
Approved with redlines on the plan. TLW
1st review completed  3/14/2012 DONE
DetailsTim L. Woodard
Plans ACCEPTED BY PLAN TECH  3/9/2012  
3-9-12 ok per Tim W to take in as a level 1
Application received 3/9/2012