VOIDED CHANGE STATUS | | | 6/4/2012 | | DONE |
Rita DeYoung
|
|
|
replaced with bld12-001122
|
BLD-Final | 3/28/2012 | 3/28/2012 | 3/28/2012 | P | PASS |
Jim Storey
|
|
|
early as possible in pm//call when on way//Akram Phone #: ###-####
|
FIRE-Final Inspection | 3/27/2012 | 3/28/2012 | 3/28/2012 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Permanent Occupancy | | | 3/28/2012 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 3/20/2012 | 3/21/2012 | 3/21/2012 | A | FAIL |
Troy Cobbley
|
|
|
Provide sticker at the main exit as discussed. Provide lever single action hardware at the rear door and remove the steel bar/bracket barrier that is currently blocking the door.
|
Routing - PUBLIC WORKS | 3/14/2012 | | 3/20/2012 | | PASS |
Connie Baumgartner
|
|
|
Approved on routing sheet. Attached Bench letter. TLW
|
Plan assigned to (TLW) | 3/13/2012 | | 3/20/2012 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/20/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 3/20/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 3/20/2012 | | DONE |
|
|
|
|
Telephone call | | | 3/20/2012 | | DONE |
|
|
|
t/c w akram -permit ready
|
Permit Ready to Issue | | | 3/20/2012 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/20/2012 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 3/14/2012 | | 3/19/2012 | | PASS |
Tim L. Woodard
|
|
|
Approved
|
1st review completed | | | 3/19/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - Addressing | 3/14/2012 | | 3/14/2012 | | PASS |
Terry Records
|
|
|
|
Routing PW Sewer Rating | 3/14/2012 | | 3/14/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 3/13/2012 | 3/13/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/13/2012 | | DONE |
Tisha Gallop
|
|
|
|