Third Notice | | 11/19/2012 | 11/28/2012 | | DONE |
Christina Prado
|
|
|
completed 11-28-12
|
Print Statement | | | 11/28/2012 | | DONE |
|
|
|
|
Second Notice | | 10/28/2012 | 11/14/2012 | | DONE |
Christina Prado
|
|
|
mailed 11-15
|
First Notice | | 10/13/2012 | 10/18/2012 | | DONE |
|
|
|
faxed
|
Permanent Occupancy | | | 10/3/2012 | | DONE |
Barbara Stitt
|
|
|
Address changed per Arpil Wing to be 3415 N Cole Rd on 10-3-12 issued new Cert of Occupancy//BAS
|
Routing - Addressing | 10/1/2012 | | 10/1/2012 | | PASS |
April Wing
|
|
|
Address was change from 3417 to 3415 N Cole Rd eff 9/24/12
|
First Notice | | 9/1/2012 | 9/19/2012 | | DONE |
|
|
|
|
Permanent Occupancy | | | 8/22/2012 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 8/21/2012 | 8/21/2012 | 8/21/2012 | P | PASS |
Jim Sly
|
|
|
jp Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 8/21/2012 | 8/21/2012 | 8/21/2012 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Final | 8/15/2012 | 8/16/2012 | 8/16/2012 | A | NR |
Jim Sly
|
|
|
JT Phone #: ###-#### Need all finals.
|
FIRE-Final Inspection | 8/15/2012 | 8/16/2012 | 8/16/2012 | A | FAIL |
Troy Cobbley
|
|
|
Mount the fire extinguishers as discussed with current inspection tags, repair the emergency light in the corridor, add emergency lighting at the east end of the tenant space and either install the north exterior exit door with the accompanying exit sign and exit discharge light or get building plan review approval to delete the door.
|
BLD-Other | 7/10/2012 | 7/10/2012 | 7/10/2012 | P | PASS |
Mike Jordan
|
|
|
John - ceiling grid Phone #: ###-####. grid ok for cover.
|
FIRE-Sprinkler Rough-in | 7/10/2012 | 7/10/2012 | 7/10/2012 | A | PASS |
Troy Cobbley
|
|
|
Insulation has been repaired. Sprinkler piping is ok to cover.
|
BLD-Other | 7/3/2012 | 7/5/2012 | 7/5/2012 | P | NR |
Jim Sly
|
|
|
Ceiling grid -- Eric Phone #: ###-####
|
BLD-Other | 6/25/2012 | 6/27/2012 | 6/27/2012 | P | NR |
Mike Jordan
|
|
|
jon Phone #: ###-####
|
BLD-Framing/Rough-in | 6/4/2012 | 6/5/2012 | 6/5/2012 | A | PART |
Jim Sly
|
|
|
Devin Phone #: ###-#### Most of the framing is complete.....and OK. NOTE! Exposed Kraft faced insulation in Ceiling. Remove Kraft facing, Protect by covering with approved scrim facing or install facing toward roof. Contractor notified.
|
Issue PAID IN FULL permit | | | 4/27/2012 | | DONE |
Tisha Gallop
|
|
|
|
Route to Impact Fee Review | 4/23/2012 | 4/26/2012 | 4/25/2012 | | PASS |
Cindy M. Gould
|
|
|
No impact fees
|
OVERRIDE | | | 4/24/2012 | | |
|
|
|
|
Routing - FIRE | 4/23/2012 | 4/23/2012 | 4/24/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Plan assigned to (CJW) | 3/30/2012 | 3/30/2012 | 4/24/2012 | | PASS |
Carl Westfall
|
|
|
HOBBY TOWN (20 days - April 24)
|
1st review completed | | | 4/24/2012 | | PASS |
|
|
|
Attached IFC comments to plans
|
Routing - PLAN CHECK | 4/24/2012 | | 4/24/2012 | | DONE |
Carl Westfall
|
|
|
Prepared drawings to go to the permits desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/24/2012 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/24/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/24/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 4/24/2012 | | DONE |
Tisha Gallop
|
|
|
called John Day and left vm permit is ready, fee and need GC form, RP and ACHD
|
Routing - PLAN CHECK | 4/5/2012 | | 4/23/2012 | | PASS |
Carl Westfall
|
|
|
The IBC plan review was started on April 20 and finished on April 23. The drawings were approved with attached code notes.
|
Routing - Design Review | 4/3/2012 | | 4/5/2012 | | PASS |
Josh Wilson
|
|
|
Josh Wilson - CZC11-00224
|
Routing - PUBLIC WORKS | 4/2/2012 | | 4/3/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 4/3/2012 | | 4/3/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 4/3/2012 | | 4/3/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00280 plan waiver approved with conditions attached to the permit.
|
Routing - Addressing | 3/30/2012 | | 4/2/2012 | | PASS |
Terry Records
|
|
|
Changed address to 3417 N Cole Road so it would fit in the sequence of existing addresses
|
Pending Assignment by JCB | 3/28/2012 | | 3/30/2012 | | DONE |
Jason Blais
|
|
|
|
Application received | | 3/14/2012 | 3/28/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/28/2012 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/28/2012 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 3/28/2012 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Carl Madsen.
|
Intake Approval | | | 3/15/2012 | | FAIL |
|
|
|
|