First Notice | | 1/12/2013 | 1/28/2013 | | DONE |
Christina Prado
|
|
|
mailed 1/29/13
|
Permanent Occupancy | | | 1/2/2013 | | DONE |
Barbara Stitt
|
|
|
|
Zoning Approval | 12/27/2012 | 12/27/2012 | 12/27/2012 | | DONE |
Susan Riggs
|
|
|
|
BLD-Final | 11/7/2012 | 11/8/2012 | 11/8/2012 | A | PART |
Tom Arcoraci
|
|
|
Ryan Phone #: ###-#### needs landscape
|
PubWorks Occupancy Approval | 11/8/2012 | 11/8/2012 | 11/8/2012 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 11/2/2012 | 11/5/2012 | 11/5/2012 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection completed satisfactory.
|
BLD-Other | 10/11/2012 | 10/11/2012 | 10/11/2012 | P | PASS |
Tom Arcoraci
|
|
|
Ceiling grid - Ryan Phone #: ###-####
|
BLD-Framing/Rough-in | 9/17/2012 | 9/18/2012 | 9/18/2012 | A | PASS |
Tom Arcoraci
|
|
|
ryan Phone #: ###-####
|
BLD-Energy code compliance | 8/29/2012 | 8/29/2012 | 8/29/2012 | P | PASS |
Tom Arcoraci
|
|
|
RYAN Phone #: ###-####
|
BLD-Framing/Rough-in | 8/23/2012 | 8/24/2012 | 8/24/2012 | P | PASS |
Tom Arcoraci
|
|
|
Ryan Phone #: ###-####
|
BLD-Framing/Rough-in | 8/20/2012 | 8/20/2012 | 8/20/2012 | P | PASS |
Tom Arcoraci
|
|
|
ryan Phone #: ###-####
|
BLD-Framing/Rough-in | 8/13/2012 | 8/14/2012 | 8/14/2012 | P | PASS |
Tom Arcoraci
|
|
|
Ryan Phone #: ###-#### wip ok
|
BLD-Wall Bracing | 8/6/2012 | 8/6/2012 | 8/6/2012 | P | PASS |
Tom Arcoraci
|
|
|
Shear wall -- Brian Phone #: ###-####
|
BLD-Wall cover | 7/31/2012 | 7/31/2012 | 7/31/2012 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 7/27/2012 | 7/30/2012 | 7/30/2012 | P | PASS |
Tom Arcoraci
|
|
|
Fire Wall- Ryan Phone #: ###-####
|
BLD-Energy code compliance | 7/2/2012 | 7/2/2012 | 7/2/2012 | P | PASS |
Jim Sly
|
|
|
ryan Phone #: ###-#### Foundation insulation OK.
|
BLD-Concrete | 6/27/2012 | 6/28/2012 | 6/28/2012 | A | PASS |
Jim Sly
|
|
|
ryan Phone #: ###-#### Foundation walls OK pending MTI special insp, tests and approvals.......MTI employed by Boise School Dist.
|
BLD-Concrete | 6/21/2012 | 6/22/2012 | 6/21/2012 | A | PART |
Jim Sly
|
|
|
Ryan Phone #: ###-#### No approved plans on site. Contractor to verify that MTI was not hired by Contractor. Need credentials from all special inspectors employed by MTI. Un-approved set of plans calls for special insp...Concrete, reinforcement, epoxy. Cannot find design strength of concrete. Unable to contact Engineer of record to verify this. MTI to be on site for inspections. Plans were examined electronically. Architect to provide. I observed 2-#5s in footing Horiz. and 2-#4's Vert at 18"oc. Can pour only if approved plans on site and MTI approval. Advised Ryan.
|
Print Occupancy Form | | | 6/5/2012 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 6/5/2012 | | DONE |
Christina Prado
|
|
|
|
Received Certificate of Value | | | 5/31/2012 | | DONE |
Tisha Gallop
|
|
|
received revised cert of value from GC, Beniton Construction.
|
Permit Ready to Issue | | | 5/30/2012 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 5/23/2012 | | DONE |
Rita DeYoung
|
|
|
emailed Amber see Project Dox
|
Plan assigned to (JCM) | 3/23/2012 | 3/23/2012 | 5/21/2012 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/21/2012 | | DONE |
John Menard
|
|
|
|
Routing Off Site - STRUCTURAL | 5/17/2012 | | 5/18/2012 | | PASS |
John Menard
|
|
|
|
Routing - FIRE | 5/1/2012 | | 5/9/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - PLAN CHECK | 5/1/2012 | | 5/9/2012 | | PASS |
John Menard
|
|
|
|
Plan resubmittals requested | | | 5/9/2012 | | DONE |
John Menard
|
|
|
Plan resubmittals for structural requested through ProjectDox. JCM
|
Routing Off Site - STRUCTURAL | 5/1/2012 | | 5/4/2012 | | FAIL |
John Menard
|
|
|
|
Routing - ELECTRICAL | 3/23/2012 | | 4/24/2012 | | PASS |
John Menard
|
|
|
|
1st review completed | | | 4/24/2012 | | DONE |
John Menard
|
|
|
|
Routing - FIRE | 4/20/2012 | 4/20/2012 | 4/23/2012 | | FAIL |
Scott Arellano
|
|
|
Emailed resubmittal items to architect.
|
Routing - PLAN CHECK | 3/23/2012 | | 4/20/2012 | | PASS |
John Menard
|
|
|
|
Routing Off Site - STRUCTURAL | 3/23/2012 | | 3/30/2012 | | FAIL |
John Menard
|
|
|
|
Routing PW Drainage | 3/26/2012 | | 3/29/2012 | | PASS |
Brian Murphy
|
|
|
|
Route to Impact Fee Review | 3/23/2012 | | 3/27/2012 | | PASS |
Cindy M. Gould
|
|
|
|
Routing PW Sewer Rating | 3/26/2012 | | 3/26/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 3/23/2012 | | 3/26/2012 | | PASS |
April Wing
|
|
|
|
Routing - PUBLIC WORKS | 3/23/2012 | | 3/26/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 3/23/2012 | | 3/26/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00224 plan approved with conditions attached to the permit.
|
Routing - PLUMBING | 3/23/2012 | | 3/26/2012 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing - PLANNING | 3/23/2012 | | 3/23/2012 | | PASS |
Sue Cummings
|
|
|
|
Routing - PLANNING Land Div | 3/23/2012 | | 3/23/2012 | | PASS |
Dave Abo
|
|
|
Parcel over 5 acres (9+) in size.
|
Intake Approval | | | 3/23/2012 | | PASS |
John Menard
|
|
|
|
Intake Approval | | | 3/21/2012 | | FAIL |
John Menard
|
|
|
Need ESC Appliction and United Water Letter
|
Intake Approval | | | 3/19/2012 | | FAIL |
John Menard
|
|
|
I was not able to do a prescreen for this project because a plan intake check list was not included.
Please submit a completed plan intake checklist along with all applicable items required by the check list.
A partial list of items that I noticed were not included:
1. Erosion & Sediment Control Application, Narrative and Plan.
2. Planning Letters.
3. Statement of Special Inspection Form #310 filled out by the project engineer.
4. Soils Report.
|
Application received | | | 3/14/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 14 2012 4:17PM
|