Permit NumberBLD12-00532
StatusFinaled
Name WESTERN IDAHO BUILDERS
Site Address 2405 S VISTA AVE
Project NameJackson Store #123
Customer Number 
ePlanReviewNo
Description
(JACKSONS STORE #123 - REMODEL AND BACKROOM ADDITION) (DRH12-00034) To construct a 311 square foot addition to an existing convenience store. The front canopy will be cut back by about 382 square feet. After the addition, this building will have a total floor are of about 2,874 square feet (308 square feet remaining canopy, 311 square feet addition, and 2,255 square feet existing interior area). Work is to include interior nonbearing walls, new walk-in coolers, a walk-in freezer, a suspended acoustical ceiling, a new roof covering with R-20 minimum continuous insulation, and a new restroom accessible to the disabled. The new restroom replaces an existing non-accessible restroom. Existing high masonry walls that extend above the roof and were formerly used for sign panels will be demolished. Work related to the building addition includes concrete footings, masonry foundations, a concrete slab on grade, masonry walls with a parapet at the property line, wood ledgers, wood roof joists, wood roof deck, and a single ply roof membrane with R-20 minimum continuous insulation. The insulation will be shaped to insure a 2% slope for roof drainage. Special inspection is required for epoxy anchors and masonry. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  10/2/2012 DONE
DetailsTisha Gallop
mailed to Western Idaho Builders
Third Notice 9/30/20129/26/2012 DONE
hold//received 10/1/12
Third Notice 9/7/20129/25/2012 DONE
Third Notice 8/6/20128/27/2012 DONE
faxed and mailed
Second Notice 7/9/20128/1/2012 DONE
DetailsChristina Prado
faxed 8-1-12
First Notice 6/3/20126/29/2012 DONE
DetailsChristina Prado
faxed 6-29-12
Permanent Occupancy  5/24/2012 DONE
DetailsTisha Gallop
BLD-Final5/18/20125/23/20125/23/2012APASS
DetailsTom Arcoraci
kenny Phone #: ###-#### pending zoning sign off ok
Zoning Approval5/23/20125/23/20125/23/2012 DONE
DetailsAndrea Tuning
FIRE-Final Inspection5/18/20125/22/20125/22/2012APASS
DetailsForrest France
Fire life safety approved pending doors and hardware at the back room and restroom are installed prior to structural final as discussed. Remainder of inspection items passed.
FIRE-Final Inspection5/21/20125/21/20125/21/2012ANR
DetailsForrest France
Final scheduled 5/22 AM.
BLD-Framing/Rough-in5/18/20125/18/20125/18/2012PPASS
DetailsTom Arcoraci
BLD-Framing/Rough-in5/17/20125/18/20125/18/2012APASS
DetailsTom Arcoraci
kenny Phone #: ###-####
FIRE-Conference5/7/20125/7/20125/8/2012ADONE
DetailsForrest France
Site work in progress.
BLD-Framing/Rough-in5/2/20125/3/20125/3/2012APART
DetailsTom Arcoraci
Kenny Phone #: ###-#### ok pending appeal
BLD-Framing/Rough-in5/1/20125/1/20125/1/2012PPART
DetailsTom Arcoraci
BLD-Other4/27/20124/30/20124/30/2012APASS
DetailsTom Arcoraci
Chuck pour at 11 Phone #: ###-#### mti spec insp
BLD-Footing4/19/20124/20/20124/20/2012APASS
DetailsTom Arcoraci
request 11am//Chuck Phone #: ###-####
Plan assigned to (CJW)3/19/20123/19/20124/18/2012 PASS
DetailsCarl Westfall
JACKSONS STORE #123 (20 days - April 11)
Routing - PLAN CHECK4/17/2012 4/18/2012 PASS
DetailsCarl Westfall
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  4/18/2012 DONE
Print Occupancy Form  4/18/2012 DONE
Telephone call  4/18/2012 DONE
DetailsChristina Prado
Called Dale and gave fees due
Permit Ready to Issue  4/18/2012 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  4/18/2012 DONE
DetailsBarbara Stitt
Routing - Erosion and Sediment4/17/2012 4/17/2012 PASS
DetailsClint A Smith
ESC12-00223 plan approved with the required modifications added. Conditions shall be attached to the permit.
Routing - PUBLIC WORKS4/10/2012 4/17/2012 PASS
DetailsConnie Baumgartner
Routing PW Drainage4/10/2012 4/16/2012 PASS
DetailsBrian Murphy
Plan resubmittals received  4/12/2012  
Recieved2 copies of Statement of Special Inspections, 2 copies of sheets A-3A, A-4A, A-5A, A-6A, CN-1
Route to Impact Fee Review4/9/20124/12/20124/10/2012 PASS
DetailsCindy M. Gould
Routing - FIRE4/9/20124/9/20124/10/2012 PASS
DetailsScott Arellano
Approved. No comments attached.
1st review completed  4/10/2012 FAIL
Failed Public Works, Erosion & Soil Control, Plan Check
Routing - PLAN CHECK4/10/2012 4/10/2012  
After 1st review, sent back to Storm Water and ESC.
Routing - PLAN CHECK4/2/2012 4/9/2012 FAIL
DetailsCarl Westfall
The IBC plan review was started on April 6 and finished on April 9. Revised drawings were required. See the plan review report.
Plan resubmittals received  4/2/2012 DONE
DetailsChristina Prado
Received two sets of Erosion & Sediment Control for SWPPP as well as a letter addressed to Clint regarding the changes made. Gave to plan review for review
Plan resubmittals received  4/2/2012 DONE
DetailsTisha Gallop
received transmittal, two copies of O & M Manual, five copies of site grading and drainage plan sheets 1 & 2; taken to Carl Westfall.
Routing - Design Review3/30/2012 4/2/2012 PASS
DetailsAndrea Tuning
Andrea Tuning - DRH12-00034
Routing - PLUMBING3/29/2012 3/30/2012 PASS
DetailsBill VanDegrift
Per plans and 2003 UPC.
Routing - Erosion and Sediment3/27/2012 3/29/2012 FAIL
DetailsClint A Smith
ESC12-00233 plan failed due to missing information over BMP details and ect.. Please refer to the ESC plan review checklist. E-mailed the Plan Designer the checklist for the required alterations and additions needed.
Routing PW Drainage3/20/2012 3/27/2012 FAIL
DetailsBrian Murphy
seepage bed needs monitor well and hydrocarbon media
Routing - Addressing3/19/2012 3/19/2012 PASS
DetailsTerry Records
Pending Assignment by JCB3/16/2012 3/19/2012 DONE
DetailsJason Blais
Plan Reviewer's activity  3/19/2012 DONE
DetailsJason Blais
Emailed archtitect to have him contact ACHD for evaluation of any impact fees due and if any inspection is required. Written verification from ACHD will need to be provided to our Permit Counter prior to the building permit being issued.
Application received 3/15/20123/16/2012 DONE
DetailsChristina Prado
Plans ACCEPTED BY PLAN TECH  3/15/2012 DONE
DetailsChristina Prado
Intake Approval  3/15/2012 PASS
DetailsTim L. Woodard
Recd Pcfee & Taken To Pln CK  3/15/2012 DONE
DetailsChristina Prado