Permit Information
Permit NumberBLD12-00534
StatusFinaled
Name K2 CONSTRUCTION
Site Address 2495 S ORCHARD ST
Project NameDennis Dillon Fiat
Customer Number 
ePlanReviewYes
Description
(DENNIS DILLON FIAT) Exterior renovation; addition of 383 sq. ft. office, 110 sq. ft. mechanical room and approximately 486 sq. ft. of canopy onto existing overhang for a total 544 sq. ft. covered service drive a total added area of 1,047 sq. ft. to existing 8,826 sq. ft. building, a new total of 9,873 sq. ft. Constructing new canopy at northeast end of building for vehicle service drop off. New concrete pad for service drive at east end of building. Project is B/S-1mixed occupancies. Work includes select demolition per plans; construction of foundations and walls to created enclosed office; new interior walls to create new parts & service area from part of existing shop; install footings, columns and roof for new canopy and new walls with shed roof for new mechanical room; construct new accessible ramp, landings, hand/guard rails; new stair W/ hand/guard rails; access / egress doors and hardware; upgrade existing restrooms for accessibility compliance, interior room layout and finishes; new luminaries & controls in remodel / addition area; electrical, mechanical & plumbing work and indicated site work. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  11/29/2012 DONE
Second Notice 9/30/201210/15/2012 DONE
First Notice 9/14/20129/20/2012 DONE
Permanent Occupancy  9/4/2012 DONE
DetailsBarbara Stitt
FIRE-Final Inspection8/30/20128/30/20128/31/2012PPASS
DetailsForrest France
Fire life safety passed.
BLD-Final8/30/20128/31/20128/31/2012APASS
DetailsTom Arcoraci
Herb Phone #: ###-####
Temporary Occupancy8/31/201211/29/20128/31/2012 DONE
DetailsBarbara Stitt
BLD-Other8/14/20128/15/20128/15/2012APASS
DetailsTom Arcoraci
herb - ceiling Phone #: ###-####
FIRE-Conference8/6/20128/7/20128/7/2012ADONE
DetailsTroy Cobbley
Herb and I discussed life safety issues. They included removing the two exit signs in the existing exit corridor that directed people to the service shop, placement of fire extinguishers, fire dept access signs at the property entrance and providing verification of hvac shutdown for the 4,000cfm roof top unit.
BLD-Wall cover7/30/20127/30/20127/30/2012PPASS
DetailsTom Arcoraci
BLD-Framing/Rough-in6/5/20126/6/20126/6/2012APASS
DetailsTom Arcoraci
Herb Phone #: ###-####
OVERRIDE  5/29/2012  
Plan assigned to (DRS)5/25/20125/25/20125/29/2012 PASS
DetailsDan Stuart
CHANGE STATUS TO (ISS)  5/29/2012 DONE
DetailsTisha Gallop
paid for approved plan mod
PLANS/APPL TAKEN TO FRONT DESK  5/29/2012 PASS
DetailsDan Stuart
Print Occupancy Form  5/29/2012 DONE
DetailsChristina Prado
Permit Ready to Issue  5/29/2012 DONE
DetailsChristina Prado
Routing - PLAN CHECK5/24/2012 5/24/2012 PASS
DetailsDan Stuart
Resubmittals for plan mode approved. To permit desk to issue.
BLD-Wall cover5/18/20125/18/20125/18/2012PPASS
DetailsTom Arcoraci
BLD-Foundation5/17/20125/17/20125/17/2012PPASS
DetailsTom Arcoraci
Hurb Phone #: ###-####
BLD-Footing5/11/20125/14/20125/14/2012APASS
DetailsTom Arcoraci
Hurb Phone #: ###-####
BLD-Conference5/8/20125/9/20125/9/2012APASS
DetailsTom Arcoraci
herb Phone #: ###-####
Telephone call  5/1/2012 DONE
DetailsTisha Gallop
spoke to Stacy Irish and told her permit fees, we still need cov from Gc, GC form and ACHD.
Permit Ready to Issue  5/1/2012 DONE
DetailsBarbara Stitt
Issue PAID IN FULL permit  5/1/2012 DONE
DetailsBarbara Stitt
Print Occupancy Form  5/1/2012 DONE
DetailsBarbara Stitt
Plan assigned to (DRS)3/28/20123/28/20124/30/2012 PASS
DetailsDan Stuart
Routing Off Site - STRUCTURAL4/24/2012 4/30/2012 PASS
Details
Resubmittals provided in response to last strucutral plan review are approved. drs
PLANS/APPL TAKEN TO FRONT DESK  4/30/2012 PASS
DetailsDan Stuart
Routing - FIRE4/24/2012 4/27/2012 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - PLAN CHECK4/24/2012 4/25/2012 PASS
DetailsDan Stuart
Routing PW Drainage4/24/2012 4/25/2012 PASS
DetailsBrian Murphy
Plan resubmittals received  4/24/2012 DONE
1st review completed  4/13/2012 FAIL
Failed PW, Fire, Building Plan Review and Outside Structural Plan Review
Plan resubmittals requested  4/13/2012 DONE
Plans and coments of e-plan review sent back to architect to resubmit.
Routing PW Drainage3/27/2012 4/12/2012 FAIL
DetailsBrian Murphy
STILL NEED PLAN IN DOX STAMPED
Routing - FIRE4/10/2012 4/10/2012 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
Routing - PLANNING3/27/2012 4/10/2012 PASS
DetailsMatthew A Halitsky
Routing Off Site - STRUCTURAL3/27/2012 4/10/2012 FAIL
Details
Routing - PLAN CHECK3/27/2012 4/6/2012 FAIL
DetailsDan Stuart
Resubmittals required. Plans still under review for Structural Engineering, Fire Code plan review and DR.
Route to Impact Fee Review3/27/20123/30/20124/3/2012 PASS
DetailsCindy M. Gould
Routing - PLANNING Land Div3/27/2012 3/28/2012 PASS
DetailsDave Abo
Routing - PUBLIC WORKS3/27/2012 3/28/2012 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment3/27/2012 3/28/2012 PASS
DetailsClint A Smith
Routing PW Sewer Rating3/27/2012 3/28/2012 PASS
DetailsConnie Baumgartner
Routing - Addressing3/28/2012 3/28/2012 PASS
DetailsApril Wing
Routing PW Environmental3/27/2012 3/27/2012 PASS
DetailsWalt Baumgartner
Bench Sewer District. Eplan revew by Terry Alber, PreT/PW
Application received  3/15/2012 DONE
Application submitted via PDS Online on Mar 15 2012 2:29PM