Print Statement | | | 7/15/2013 | | DONE |
Tisha Gallop
|
|
|
mailed bill to Peter Bui at Palm St. address.
|
Third Follow up | | | 7/12/2013 | | DONE |
Tisha Gallop
|
|
|
Peter called for inspection on bld13-00213 (Murano Beauty Academy) and told him on hold for this final value. I e-mailed final value request to info@muranoacademy.com per his request. --- 7/15/13 received final value from Peter in office
|
Third Notice | | 6/9/2013 | 6/4/2013 | | DONE |
Tisha Gallop
|
|
|
sent with letter to Project address, put parcel tag on Bld13-00166 to hold issueance of permit until this FV received (ok'd per Rita).
|
Third Notice | | 4/29/2013 | 4/24/2013 | | DONE |
|
|
|
mailed to Peter at project address.
|
Third Notice | | 2/26/2013 | 3/26/2013 | | DONE |
|
|
|
Mailed to Peter (tenant) at Palm St. address.
|
Telephone call | | | 2/27/2013 | | DONE |
Tisha Gallop
|
|
|
Brad Mangett from All Phase Custom Remodeling called. He said owner was in charge of project, he just put his RCT# on the project to get it issued and he was done with his portion of the work and off the job before the occupancy stage.
|
Third Notice | | 2/2/2013 | 2/21/2013 | | DONE |
|
|
|
mailed to All Phase Custom Remodeling /// resent to tenant at project address due to phone call conversation on 2/27/13.
|
Second Notice | | 1/13/2013 | 1/28/2013 | | DONE |
Christina Prado
|
|
|
mailed 1/29/13
|
First Notice | | 12/20/2012 | 1/3/2013 | | DONE |
|
|
|
Mailed 1-3-13
|
Permanent Occupancy | | | 12/10/2012 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 12/6/2012 | 12/7/2012 | 12/7/2012 | A | PASS |
Tony Young
|
|
|
after 9:30//Peter Phone #: ###-####
|
FIRE-Final Inspection | 12/6/2012 | 12/6/2012 | 12/6/2012 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 10/5/2012 | 10/8/2012 | 10/8/2012 | A | FAIL |
Troy Cobbley
|
|
|
Remove the thumbturn dead bolt from the main exit (keyed is ok), replace the broken electrical cover at the sign, sprinkler heads are overspaced and need to be modified (this work requires a separate permit), provide access to the fire sprinkler riser room to verify annual inspection, repair exit signs and emergency lighting.
|
FIRE-Final Inspection | 10/4/2012 | 10/5/2012 | 10/5/2012 | P | CANC |
Troy Cobbley
|
|
|
Overbooked. I contacted Peter and we agreed to reschedule for monday morning. I can find no record of a sprinkler permit for the changes that were needed per the previous conference. Peter stated the original contractor was no longer there and he did not know about sprinkler requirements.
|
FIRE-Final Inspection | 8/30/2012 | 8/31/2012 | 8/31/2012 | P | NH |
Forrest France
|
|
|
Peter Phone #: ###-####
|
BLD-Framing/Rough-in | 4/23/2012 | 4/23/2012 | 4/23/2012 | P | PART |
Tony Young
|
|
|
walls ok,,, contractyor said there was plastic under the slab for sill plate
|
BLD-Framing/Rough-in | 4/19/2012 | 4/20/2012 | 4/20/2012 | A | FAIL |
Tony Young
|
|
|
brad Phone #: ###-####,, need trades,, some interior walls ok with out mechanical
|
FIRE-Conference | 4/17/2012 | 4/17/2012 | 4/17/2012 | P | DONE |
Troy Cobbley
|
|
|
I went over life safety requirements with Brad. I noted that several of the sprinkler heads are overspaced. We discussed door hardware issues and fire extinguishers.
|
BLD-Conference | 4/12/2012 | 4/12/2012 | 4/12/2012 | P | FAIL |
Tony Young
|
|
|
STATUS CHECK,, to many possible issues,, requested all trades to meet on site for friday 13th,, under a mis permit
|
Issue PAID IN FULL permit | | | 4/10/2012 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 4/5/2012 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (RDY) | | | 4/5/2012 | | DONE |
Christina Prado
|
|
|
Issued by mistake without having ACHD
|
Routing - MECHANICAL | 3/28/2012 | | 4/3/2012 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 4/3/2012 | | 4/3/2012 | | PASS |
Tim L. Woodard
|
|
|
Approved w/ attached comments. TLW
|
Plan assigned to (TLW) | 3/19/2012 | | 4/3/2012 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 4/3/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/3/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 4/3/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 4/3/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 4/3/2012 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/3/2012 | | DONE |
|
|
|
|
Telephone call | | | 4/3/2012 | | DONE |
Christina Prado
|
|
|
Called and gave Richard fees due and advised GC/RCE is required prior to issuance
|
Permit Ready to Issue | | | 4/3/2012 | | DONE |
Christina Prado
|
|
|
|
Routing - PLUMBING | 3/27/2012 | | 3/28/2012 | | PASS |
Daryl Spivey
|
|
|
1. Need RPBP's installed on water to pedicure stations.
2. Tempered water on hot water to hand sink.
3 Per plans and 2003 UPC.
|
Routing - PLAN CHECK | 3/20/2012 | | 3/27/2012 | | PEND |
Tim L. Woodard
|
|
|
Sent to plumbing for review. Tim Woodard
|
Routing - PUBLIC WORKS | 3/19/2012 | | 3/20/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 3/20/2012 | | 3/20/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 3/19/2012 | 3/19/2012 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/19/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/19/2012 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 3/19/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - Addressing | 3/19/2012 | | 3/19/2012 | | PASS |
Terry Records
|
|
|
|