Permit Information
Permit NumberBLD12-00551
StatusFinaled
Name J & L DEVELOPMENT LTD CORP
Site Address 4262 N EAGLE RD
Project NameGRACE BIBLE CHURCH
Customer Number 
ePlanReviewNo
Description
(GRACE BIBLE CHURCH) - Addition - To Construct a new 19,600 sq. ft., one story, wood framed church building addition and related site improvements. This church building is being added to an existing 2,350 sq. ft., one story church office building. The new addition and existing building will be fully fire sprinkled. The sprinklers are used for area increase. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 12/7/201412/9/2014 DONE
DetailsChristina Prado
Second Notice 12/11/201412/2/2014 DONE
First Notice 11/30/201412/1/2014 DONE
sent 1st notice in mail 12-2-14 CAN
Telephone call  11/20/2014 DONE
DetailsCandy A. Nichols
called Jesse ###-####-as per Jesse finals were done months ago (no one brought the sign off card in), he would like us to email the C of O to him
Permanent Occupancy  11/20/2014 DONE
DetailsCandy A. Nichols
Telephone call  10/10/2014 DONE
DetailsCandy A. Nichols
called-left message-need to contact us soon about a temp occ that is expired
Change Expiration Date Only  5/14/2014 DONE
DetailsBarbara Stitt
BLD-Final4/16/20144/17/20144/17/2014APASS
DetailsJim Sly
Jesse Phone #: ###-####
OK for Perm Occ.
FIRE-Final Inspection4/16/20144/16/20144/17/2014PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Final4/9/20144/9/20144/9/2014PCANC
DetailsJim Sly
Jesse p[hone ###-####
BLD-Final4/8/20144/8/20144/8/2014PPEND
DetailsJim Sly
Jesse ......WIP.
Temporary Occupancy3/28/20146/26/20143/28/2014 DONE
DetailsBarbara Stitt
Approved temp occupancy extension per Jason Blais-see scanned documents//5-28-14 BAS
Change Expiration Date Only  3/11/2014 DONE
DetailsBarbara Stitt
Case Summary (BLD)  1/27/2014 DONE
BLD-Ceiling Grid Inspection1/24/20141/24/20141/24/2014PPASS
DetailsJim Sly
Jesse Phone #: ###-####
Temporary Occupancy12/31/20133/31/201412/31/2013 DONE
DetailsBarbara Stitt
Temporary occupancy extended per Jaosn Blais-See scanned documents///12-31-13
BLD-Framing/Rough-in12/12/201312/12/201312/12/2013PPASS
DetailsJim Sly
JESSE Phone #: ###-####
Talked to Jesse .....Make sure Troy has looked at sprinklers.
BLD-Conference11/4/201311/5/201311/5/2013PDONE
DetailsJim Sly
Starting to finish classrooms
BLD-Final11/4/201311/4/201311/4/2013PPEND
DetailsJim Sly
Re-sched..... for Tues PM.
Temporary Occupancy10/3/20131/1/201410/3/2013 DONE
DetailsBarbara Stitt
Temporary Occupancy7/15/201310/13/20137/15/2013 DONE
DetailsBarbara Stitt
Change Expiration Date Only  7/15/2013 DONE
DetailsBarbara Stitt
Zoning Approval6/19/20136/19/20136/19/2013 DONE
DetailsAndrea Tuning
BLD-Final6/13/20136/13/20136/14/2013PPEND
DetailsJim Sly
PubWorks Occupancy Approval5/24/20135/24/20135/24/2013 DONE
DetailsTiffany Lowery
Temporary Occupancy2/14/20135/15/20132/14/2013 DONE
DetailsBarbara Stitt
BLD-Final2/4/20132/5/20132/5/2013PPART
DetailsJim Sly
Hello Jim,

we have everything signed off, can we get a final? Phone #: ###-#### >> Inspection requested via web by Jesse Ferrer
Some un-finished classroom areas to be finished in the near future. Corr. Notice...... Need Fire, Zoning, public Works, and Plumbing to sign off for Perm Occ. They have signed Temp as per now. OK for Temp Occ. from Structural.
Zoning Approval Temp2/4/20132/4/20132/4/2013 DONE
DetailsAndrea Tuning
The applicant has provided a bond for teh landscape improvements and parking lot striping.

BLD-Final2/1/20132/1/20132/1/2013PFAIL
DetailsJim Sly
Need Zoning final.
BLD-Final1/31/20132/1/20132/1/2013ACANC
DetailsJim Sly
Hello Jim,

Can you call me when you are on your way? Phone #: ###-#### >> Inspection requested via web by Jesse Ferrer
PubWorks Temp Occupancy Appr2/1/20132/1/20132/1/2013 PASS
DetailsBrian Murphy
temp occ per Bonded for drainage
BLD-Conference1/29/20131/30/20131/31/2013ACANC
DetailsJim Sly
Hello Jim, this is a reminder to discuss Grace Bible with Bob Archibald. Possible walk through. Call me when you would like to do that. ###-####. Need Fire Final.
Thanks. >> Inspection requested via web by Jesse Ferrer
FIRE-Final Inspection1/30/20131/31/20131/31/2013PPART
DetailsTroy Cobbley
A temporary occupancy is being given with Jim sly's and Jason Blais permission until the rest of theconstruction has been completed.. New sprinkler and fire alarm permits will be required.
BLD-Final1/25/20131/28/20131/28/2013ANR
DetailsJim Sly
Hey Jim, can you call me when you are on your way.
Thanks. Jesse Phone #: ###-#### >> Inspection requested via web by Jesse Ferrer
Walked through Bldg with Jesse.....made list of requirements needed to obtain Cert of Occ.
FIRE-Final Inspection1/25/20131/28/20131/28/2013AFAIL
DetailsTroy Cobbley
Todays inspection was for a conference. It needs to be verified through building plan review that it is ok to not finish part of the building but still have people exiting through these areas, several emergency lights did not function, fire alarm and fire sprinkler permits need addressed.
Print Occupancy Form  1/28/2013 DONE
DetailsChristina Prado
BLD-Ceiling Grid Inspection12/14/201212/17/201212/17/2012APASS
DetailsJim Sly
Hey Jim,
Can you give me a call before you head out?
Thanks Phone #: ###-#### >> Inspection requested via web by Jesse Ferrer
FIRE-Conference12/12/201212/12/201212/12/2012PDONE
DetailsTroy Cobbley
I posted a stop work order on the front of the building due to hardlids continuing to be installed prior to a sprinkler rough-in inspection. I had a previous conversation with contractor about this. Stop work order states "Stop all sheet rock that is covering sprinkler piping. Cover inspection is required".
FIRE-Conference11/7/201211/7/201211/7/2012PDONE
DetailsTroy Cobbley
The sprinkler piping in the main lobby area has been covered by sheet rock without approval. I spoke to the job site superintendant about a possible stop work order if covering pipe prior to an inspection continued. He agreed that it would not happen again. Access needs to be provided for the following inspection.
BLD-Wall cover10/30/201210/31/201210/31/2012APASS
DetailsJim Sly
Wall covering.

Thanks Phone #: ###-#### >> Inspection requested via web by Jesse Ferrer
BLD-Energy code compliance10/30/201210/31/201210/31/2012APASS
DetailsJim Sly
Hello Jim,

This is for insulation walls and wall covering. Can you give me a call when you are on your way?

Thanks Phone #: ###-#### >> Inspection requested via web by Jesse Ferrer
BLD-Framing/Rough-in10/25/201210/26/201210/26/2012APART
DetailsJim Sly
Hello Jim,

Can we get an am on this and can you call me so I can meet you ot there?

Thanks Phone #: ###-#### >> Inspection requested via web by Jesse Ferrer
Select truss corrections. OK to insulate walls.
BLD-Wall Bracing10/22/201210/23/201210/23/2012APASS
DetailsJim Sly
Hello Jim,

This inspection is for wall shaething and bracing. We would like to start drying in.
If you could call me when you are on your way that would be great.
Thanks. Phone #: ###-#### >> Inspection requested via web by Jesse Ferrer
All Exterior shear nailing.....OK.
BLD-Wall cover10/4/201210/5/201210/5/2012APART
DetailsJim Sly
Hello Jim,
can we get a final roof sheathing inspection in the morning. The only thing left to inspect on the roof is the portico.
Thanks, Jesse Phone #: ###-#### >> Inspection requested via web by Jesse Ferrer
Portico roof nailing....OK.
BLD-Conference9/6/20129/6/20129/6/2012ADEFR
DetailsJim Sly
Good morning Jim,We wanted to know if you could meet us on site to discuss an issue that came up with our site work. It should only take a few minutes. If you can give me a call when you think you might be available that would be great. If you can''t do it today tomorrow will work too.
Thanks Jim. Phone #: ###-#### >> Inspection requested via web by Jesse Ferrer
Zoning issues ....Deferred.
BLD-Wall Bracing9/4/20129/5/20129/5/2012APART
DetailsJim Sly
Hello Jim, this is for a partial sheet and shear inspection. Can you call me or Mike at Leighton before you swing by so one of us can plan to be there.
Thanks Phone #: ###-#### >>
Inspection requested via web by Jesse Ferrer
Roof nailing OK except approx. 40' wide area at front entry.
BLD-Other7/17/20127/18/20127/18/2012ADONE
DetailsJim Sly
Hello Jim, This is for a CMU lift.
Thanks Phone #: ###-#### >> Inspection requested via web by Jesse Ferrer
1st lift .....OK pending MTI inspections, tests and approvals.
BLD-Concrete7/3/20127/6/20127/6/2012APASS
DetailsJim Sly
Please call Jared Advanced concrete ###-#### so he can meet you on site.
Thanks Jim. Phone #: ###-#### >> Inspection requested via web by Jesse Ferrer
Flatwork....footings.
BLD-Foundation6/11/20126/12/20126/12/2012APASS
DetailsJim Sly
Good morning Jim, can you call before you show up so we can have someone there?
Thanks Phone #: ###-#### >> Inspection requested via web by Jesse Ferrer
Verified MTI contracted by Grace church and special inspectors on site certified in thier discipline.
BLD-Footing6/7/20126/7/20126/7/2012APASS
DetailsJim Sly
I just noticed that I used the grading permit # on previous inspection request. (same inspection) Phone #: ###-#### >> Inspection requested via web by Jesse Ferrer

No Special insp req. on foundations. Verified with Sarah (Eng. of record). MTI will be doing other required inspections per appr plans. Jesse to provide verification that MTI not hired by contr. Need MTI inspectors credentials next insp.
Issue PAID IN FULL permit  6/5/2012 DONE
DetailsTisha Gallop
Route to Impact Fee Review5/30/20126/4/20126/1/2012 PASS
DetailsCindy M. Gould
Plan assigned to (JCM)3/20/20123/20/20126/1/2012 PASS
DetailsJohn Menard
Routing - PLAN CHECK5/31/2012 6/1/2012 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  6/1/2012 DONE
DetailsJohn Menard
Print Occupancy Form  6/1/2012 DONE
Telephone call  6/1/2012 DONE
DetailsTisha Gallop
called Randy and left vm permit is ready, fee, need GC/rce/form and ACHD
Permit Ready to Issue  6/1/2012 DONE
DetailsTisha Gallop
Routing - FIRE5/30/20125/30/20125/31/2012 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  5/31/2012 FAIL
Failed Plan Check
Plan resubmittals received  5/30/2012 DONE
DetailsTisha Gallop
received two copies of response letter, plan sheets A-2.1, A-4.0, A-5.0, A-6.0, A-6.1, A-6.2, A-6.3; inserted by arch. rep and taken back to John Menard.
Routing Off Site - STRUCTURAL5/18/2012 5/30/2012 PASS
DetailsJohn Menard
Received letter from consulting structural engineer approving all required revisions. JCM
Plan resubmittals requested  5/24/2012 DONE
DetailsJohn Menard
E-mailed the architect a copy of a letter requesting additional plan revisions. JCM
Plan resubmittals received  5/18/2012 DONE
received three copies of calculations and plan sheets S1.0, S1.1, S2.0, S3.0, S3.1, S4.0, S5.0, S5.1; inserted by contractor - taken back to John M
Plan resubmittals received  5/15/2012 DONE
DetailsAlexandra L. DeYoung
rec'd response letter and two copies of sheets A-0.1; A-1.1; A-2.0; A-2.1; A-2.2; A-3.0; A-3.1; A-4.0; A-5.0; A-6.0; A-6.1; A-6.2; A-6.3; A-7.0; L1.1; L1.5; E2.0L; H1.0; P1.0; P1.1; P2.1 - inserted by arch and taken back to John M.
Plan resubmittals requested  4/30/2012 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK4/4/2012 4/30/2012 FAIL
DetailsJohn Menard
John Menard
Routing Off Site - STRUCTURAL3/22/2012 4/9/2012 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  4/9/2012 DONE
DetailsJohn Menard
E-mailed the archtect a copy of the structural review requesting revisions. JCM
Routing - FIRE4/3/2012 4/4/2012 CANC
DetailsScott Arellano
Plan set had been routed to Fire in error prior to being reviewed by the Building Official. Sent to IBC plan reviewer for analysis.
Routing - PLANNING4/2/2012 4/3/2012 PASS
DetailsAndrea Tuning
DRH12-00011-Andrea Tuning
Routing - PLANNING4/3/2012 4/3/2012 PASS
DetailsSusan Riggs
CUP11-00099-SUSAN RIGGS
The applicant shall provide 14 bicycle parking spaces per condition #3 of the CUP.
Routing - PLUMBING3/30/2012 4/2/2012 PASS
DetailsDaryl Spivey
1. Provide tempered water to lavatories per 2003 UPC 414.1.
2. Per plans and 2003 UPC.
Routing - Erosion and Sediment3/28/2012 3/30/2012 PASS
DetailsClint A Smith
ESC12-00240 plan approved with conditions attached to the permit.
The fee has changed from $78.75 to $131.25. There is a differance of $52.50 that must be paid for due to area of disturbance was not accurate that was included on the application.
Plan resubmittals received  3/30/2012 DONE
DetailsChristina Prado
Received three sets of plans marked L2.1 & L2.5 as well as two set of Storm Drainage System Operation & Maintenance Requirements. Plans given to John Menard to be added to full set
Routing - PUBLIC WORKS3/21/2012 3/28/2012 PASS
DetailsConnie Baumgartner
Routing PW Drainage3/23/2012 3/27/2012 PASS
DetailsBrian Murphy
Telephone call  3/22/2012 DONE
DetailsChristina Prado
called Action Couriers for pick up
Routing - Addressing3/21/2012 3/21/2012 PASS
DetailsTerry Records
Routing PW Sewer Rating3/21/2012 3/21/2012 PASS
DetailsConnie Baumgartner
Routing PW Sewer Design3/21/2012 3/21/2012 PASS
DetailsJon R. Gunnerson
Connect onto exisiting service line provided. SSL constructed under DRI-1489.
Routing PW Solid Waste3/21/2012 3/21/2012 PASS
Details
Routing PW Environmental3/21/2012 3/21/2012 PASS
DetailsWalt Baumgartner
No grease abatement required for residential type "warming" kitchen.
Pending Assignment by JCM3/19/2012 3/20/2012 DONE
DetailsJohn Menard
Routing - PLANNING Land Div3/20/2012 3/20/2012 PASS
DetailsTodd Tucker
Application received 3/19/20123/19/2012 DONE
DetailsBarbara Stitt
Intake Approval  3/19/2012 PASS
DetailsSam Zahorka
Recd Pcfee & Taken To Pln CK  3/19/2012 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  3/19/2012 DONE
DetailsBarbara Stitt