Third Notice | | 6/11/2012 | 7/6/2012 | | DONE |
|
|
|
|
Second Notice | | 5/26/2012 | 6/6/2012 | | DONE |
Christina Prado
|
|
|
mailed 6-7-12
|
First Notice | | 5/14/2012 | 5/16/2012 | | DONE |
|
|
|
|
BLD-Final | 5/3/2012 | 5/4/2012 | 5/4/2012 | A | PASS |
Dave Hannah
|
|
|
Alicia Phone #: ###-#### ok for perm occ
|
FIRE-Final Inspection | 5/3/2012 | 5/3/2012 | 5/4/2012 | P | PASS |
Forrest France
|
|
|
Fire life safety passed pending thumbturn locks at the office and conference room slider doors are removed or replaced with approved style hardware as discussed. To be finished prior to structural final inspection.
|
Permanent Occupancy | | | 5/4/2012 | | DONE |
Christina Prado
|
|
|
|
BLD-Framing/Rough-in | 4/11/2012 | 4/17/2012 | 4/17/2012 | P | PASS |
Dave Hannah
|
|
|
will be open, call if needed//Alicia Ralston Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/27/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (TLW) | 3/19/2012 | | 3/26/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 3/19/2012 | | 3/26/2012 | | PASS |
Tim L. Woodard
|
|
|
Tim Woodard
|
1st review completed | | | 3/26/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/26/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 3/26/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 3/26/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/26/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 3/26/2012 | | DONE |
Tisha Gallop
|
|
|
called Andrew Erstad office and left message for Cheyl that permit is ready, fees and if tenant is owner of condo parcel needs to bring in warranty deed to prove ownership if she wants to be her own GC.
|
Application received | | 3/19/2012 | 3/19/2012 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/19/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/19/2012 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 3/19/2012 | | PASS |
Tim L. Woodard
|
|
|
|