Permit Information
Permit NumberBLD12-00574
StatusFinaled
Name EKC INC
Site Address 6752 S BUSINESS WAY
Project NameFedEx Ground
Customer Number 
ePlanReviewNo
Description
FedEx Ground Building Addition (Foundation and Underground Utilities Only) - This permit is issued to pour footings and foundation and install underground utilities for the future construction of a 12,280 sq. ft. FedEx Ground pre-engineered metal storage building addition. Work under this permit shall not proceed beyond the pour of the foundation until final approval of plans and issuance of the full building permit. That permit has not yet been applied for. As owner or designated agent, I acknowledge that I am performing this work at my own risk without assurance that the permit for the entire building structure will be granted, and I agree to make any modifications to the early foundation work performed as may be required to comply with the City Codes and the final approved building plans and conditions. All per engineered plans on file.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval5/9/20135/9/20135/9/2013 DONE
DetailsTiffany Lowery
Third Follow up  3/6/2013 DONE
DetailsTisha Gallop
received 3/19/13
Third Notice 2/3/20132/21/2013 DONE
faxed and mailed to EKC with letter
Third Notice 1/8/20131/29/2013 DONE
faxed to EKC
Third Notice 12/9/20121/3/2013 DONE
faxed to EKC
Second Notice 11/24/201212/4/2012 DONE
First Notice10/19/201210/19/201211/14/2012 DONE
DetailsJim Storey
BLD-Final10/19/201210/19/201210/19/2012PPASS
DetailsJim Storey
l/c
DOC - Permit Finaled10/19/201210/19/201210/19/2012PPASS
DetailsJim Storey
BLD-Concrete8/15/20128/16/20128/16/2012APASS
DetailsJim Storey
Pouring at 10 Rebar - - Joe Phone #: ###-#### east wall and south ft ok
BLD-Footing6/29/20126/29/20126/29/2012PPASS
DetailsJim Storey
JOE Phone #: ###-####
BLD-Foundation6/19/20126/20/20126/20/2012APASS
DetailsJim Storey
JOE Phone #: ###-#### wall ok
BLD-Concrete6/15/20126/18/20126/18/2012PPASS
DetailsJim Storey
Joe Phone #: ###-#### two center footers
BLD-Foundation6/12/20126/13/20126/13/2012APASS
DetailsJim Storey
10:00am pour-Joe Phone #: ###-#### exterior ft// need si contract. si on site.
Issue PAID IN FULL permit  5/15/2012 DONE
DetailsChristina Prado
Plan Reviewer's activity  4/5/2012 PASS
DetailsJohn Menard
Received copy of MTI geotechnical report and approved structural. JCM
PLANS/APPL TAKEN TO FRONT DESK  4/5/2012 DONE
DetailsJohn Menard
Inspection Record Card- Bld  4/5/2012 DONE
Plan resubmittals received  4/5/2012 DONE
DetailsChristina Prado
Received one set of geotech soils report. Given to John Menard for review
Permit Ready to Issue  4/5/2012 DONE
DetailsTisha Gallop
Telephone call  4/5/2012 DONE
DetailsTisha Gallop
called Richard Honsinger and left vm that permit is ready, fees and need RP, RCE/GC form, ACHD.
Routing - PLAN CHECK4/4/2012 4/5/2012 PASS
DetailsJohn Menard
Plan assigned to (JCM)3/22/2012 4/5/2012 PASS
DetailsJohn Menard
Routing - FIRE4/3/20124/3/20124/4/2012 PASS
DetailsScott Arellano
No comments attached to plans. The primary and secondary means of fire department vehicle access shall be maintained as originally approved for this building.
Routing Off Site - STRUCTURAL3/22/2012 4/4/2012 FAIL
DetailsJohn Menard
Plan resubmittals requested  4/4/2012 DONE
DetailsJohn Menard
E-mailed the architect a request for two copies of the MTI geotechnical report. JCM
1st review completed  4/4/2012 PASS
Route to Impact Fee Review4/3/20124/6/20124/3/2012 PASS
DetailsCindy M. Gould
Foundation only impact fees will be applied to building permit for shell.
Routing - PLAN CHECK4/3/2012 4/3/2012 PASS
DetailsJohn Menard
Routing - PLUMBING4/2/2012 4/3/2012 PASS
DetailsDaryl Spivey
Per plans and 2003 UPC.
Routing - PLANNING4/3/2012 4/3/2012 PASS
DetailsAndrea Tuning
This approval is for the foundation of the building only. Once further site improvements come in for a building permit, the applicant will be required to update the landscape plan. ie The site plan has incorporated all of the changes that were required with teh Design Review Approval (DRH12-00049) however the landscape plan does not match the site plan and the conditions of approval.
Routing - Erosion and Sediment3/29/2012 4/2/2012 PASS
DetailsClint A Smith
ESC12-00248 plan approved with additions to the plan map. Conditions attached to the permit.
Additional plans submitted  3/30/2012 DONE
DetailsTisha Gallop
Received three copies of civil drawings that were already approved. Taken directly to Brian Murphy per they were requested by him.
Routing PW Environmental3/28/2012 3/29/2012 PASS
DetailsWalt Baumgartner
Grade &drainage only, reviewed. Facility scheduled for Pretreatment inspection.
Routing - PUBLIC WORKS3/22/2012 3/29/2012 PASS
DetailsConnie Baumgartner
Routing PW Drainage3/23/2012 3/28/2012 PASS
DetailsBrian Murphy
Routing PW Solid Waste3/23/2012 3/23/2012 PASS
DetailsPeter J. McCullough
Routing PW Sewer Rating3/23/2012 3/23/2012 PASS
DetailsConnie Baumgartner
Telephone call  3/22/2012 DONE
DetailsChristina Prado
Called Action Couriers for pick up
Pending Assignment by JCM3/21/2012 3/22/2012 DONE
DetailsJohn Menard
Routing - Addressing3/22/2012 3/22/2012 PASS
DetailsTerry Records
Routing - PLANNING Land Div3/21/2012 3/22/2012 PASS
DetailsTodd Tucker
Application received 3/21/20123/21/2012 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  3/21/2012 DONE
DetailsChristina Prado
Intake Approval  3/21/2012 PASS
DetailsCarl D Madsen
Override - Parcel Holds  3/21/2012  
Recd Pcfee & Taken To Pln CK  3/21/2012 DONE
DetailsChristina Prado