Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD12-00580
StatusFinaled
Name TEXAS ALLIANCE GROUP INC
Site Address 4111 W OVERLAND RD
Project NameAUTOZONE
Customer Number 
ePlanReviewYes
Description
(AUTOZONE)(ADDITION) To demolish and remove an existing metal building and construct a 6,950 sq. ft., two story, auto parts warehouse addition at the rear of an existing auto parts store. The addition will be constructed of concrete masonry block exterior walls and steel roof trusses. This permit also includes related site improvements. The new addition and existing building will be fully fire sprinkled. The proposed second level has not been reviewed and is not considered a part of this permit. A separate permit will be required to finish the second level of this addition. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 1/29/20131/24/2013 DONE
Second Notice 1/13/20131/24/2013 DONE
First Notice 12/10/20121/3/2013 DONE
Permanent Occupancy  11/30/2012 DONE
DetailsTisha Gallop
FIRE-Final Inspection11/29/201211/29/201211/29/2012PPASS
DetailsForrest France
Fire life safety inspection passed, one exit sign repaired while on site.
BLD-Final11/29/201211/29/201211/29/2012PPASS
DetailsTom Arcoraci
Mike Phone #: ###-####
BLD-Conference11/7/201211/8/201211/8/2012APASS
DetailsTom Arcoraci
Mike Phone #: ###-####
Zoning Approval11/5/201211/5/201211/5/2012 DONE
DetailsAndrea Tuning
BLD-Conference10/30/201210/30/201210/30/2012PCANC
DetailsTom Arcoraci
PubWorks Occupancy Approval10/22/201210/22/201210/22/2012 DONE
DetailsTiffany Lowery
BLD-Energy code compliance10/2/201210/2/201210/2/2012PPASS
DetailsTom Arcoraci
mike Phone #: ###-####
BLD-Conference9/26/20129/26/20129/26/2012PPASS
DetailsTom Arcoraci
ok to insulate walls
BLD-Concrete8/30/20128/30/20128/30/2012PPASS
DetailsTom Arcoraci
mike Phone #: ###-####
BLD-Foundation8/23/20128/24/20128/24/2012APASS
DetailsTom Arcoraci
Grout/ Masonry-Mike Alred Phone #: ###-####
BLD-Footing8/17/20128/20/20128/20/2012APASS
DetailsTom Arcoraci
Mike - noon is possible Phone #: ###-#### mti on site
Issue PAID IN FULL permit  8/6/2012 DONE
DetailsChristina Prado
Print Occupancy Form  8/6/2012 DONE
DetailsChristina Prado
PLANS/APPL TAKEN TO FRONT DESK  8/1/2012 DONE
DetailsJohn Menard
Plan Reviewer's activity  8/1/2012 PASS
DetailsJohn Menard
Reviewed and approved structural revisions. JCM
Permit Ready to Issue  8/1/2012 DONE
DetailsChristina Prado
Plan assigned to (JCM)4/16/2012 8/1/2012 PASS
DetailsJohn Menard
Routing - PLANNING Land Div7/31/2012 7/31/2012 PASS
DetailsDave Abo
Routing - PLANNING Land Div6/1/2012 6/26/2012 FAIL
DetailsTodd Tucker
Routing Off Site - STRUCTURAL6/1/2012 6/8/2012 FAIL
DetailsJohn Menard
Routing - FIRE6/1/2012 6/5/2012 PASS
DetailsTim Frost
Routing - PLAN CHECK6/1/2012 6/1/2012 PASS
DetailsJohn Menard
1st review completed  5/14/2012 DONE
DetailsJohn Menard
Routing - PLAN CHECK4/16/2012 5/14/2012 FAIL
DetailsJohn Menard
Plan resubmittals requested  5/14/2012 DONE
DetailsJohn Menard
Plan Resubmittals requested through ProjectDox. JCM
Plan Reviewer's activity  4/30/2012 DONE
Emailed review to RP
Routing - FIRE  4/30/2012 FAIL
DetailsScott Arellano
Routing Off Site - STRUCTURAL4/16/2012 4/30/2012 FAIL
DetailsJohn Menard
Routing PW Drainage4/16/2012 4/19/2012 PASS
DetailsBrian Murphy
Routing - Erosion and Sediment4/16/2012 4/19/2012 PASS
DetailsClint A Smith
ESC12-00249 plan approved with conditions attached to the permit.
Route to Impact Fee Review4/16/20124/19/20124/17/2012 PASS
DetailsCindy M. Gould
Routing - PLUMBING4/16/2012 4/17/2012 PASS
DetailsBill VanDegrift
roof drainage only
Routing PW Street Lights4/16/2012 4/17/2012 PASS
DetailsMike D Hedge
Routing PW Sewer Rating4/16/2012 4/17/2012 PASS
DetailsConnie Baumgartner
Routing PW Solid Waste4/16/2012 4/17/2012 PASS
DetailsPeter J. McCullough
Routing PW Environmental4/16/2012 4/16/2012 PASS
DetailsWalt Baumgartner
Pending Assignment by JCM4/16/2012 4/16/2012 DONE
DetailsJohn Menard
Routing - PLANNING Land Div4/16/2012 4/16/2012 FAIL
DetailsDave Abo
Routing - PUBLIC WORKS4/16/2012 4/16/2012 PASS
DetailsBeverly Mountain
Routing - Design Review4/16/2012 4/16/2012 PASS
DetailsAndrea Tuning
All parkign stalls adjacent to the building shall be striped to be 20-feet in depth.
Telephone call  4/10/2012 DONE
DetailsRita DeYoung
sent email of plan check fees due
Application received  3/21/2012 DONE
Application submitted via PDS Online on Mar 21 2012 12:26PM