Print Statement | | | 10/15/2012 | | DONE |
|
|
|
|
Second Notice | | 9/29/2012 | 10/12/2012 | | DONE |
Christina Prado
|
|
|
complete 10-12
|
First Notice | | 8/26/2012 | 9/19/2012 | | DONE |
Christina Prado
|
|
|
faxed 9-19
|
FIRE-Final Inspection | 8/15/2012 | 8/16/2012 | 8/16/2012 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Permanent Occupancy | | | 8/16/2012 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 8/15/2012 | 8/15/2012 | 8/15/2012 | P | PASS |
Tom Arcoraci
|
|
|
Steve Phone #: ###-#### ok for perm when others sign perm occ
|
FIRE-Final Inspection | 8/15/2012 | 8/15/2012 | 8/15/2012 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy is given until the two heads are changed to quick responce and the dead bolt hardware is removed as discussed.
|
FIRE-Conference | 8/14/2012 | 8/14/2012 | 8/14/2012 | P | DONE |
Troy Cobbley
|
|
|
I discussed the gazebo with Debbie. If it does not meet NFPA 13 for open grid ceiling it will need sprinkler protection installed beneath it.
|
FIRE-Conference | 7/17/2012 | 7/18/2012 | 7/18/2012 | A | DONE |
Troy Cobbley
|
|
|
Debbie and I went over storage arrangements in the existing portion of the new tenant space.
|
BLD-Framing/Rough-in | 7/9/2012 | 7/10/2012 | 7/10/2012 | A | PASS |
Tom Arcoraci
|
|
|
Debbie Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 6/13/2012 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 6/12/2012 | | |
|
|
|
|
Plan assigned to (DRS) | 5/30/2012 | 5/30/2012 | 6/12/2012 | | PASS |
Dan Stuart
|
|
|
|
Routing - FIRE | 6/11/2012 | | 6/12/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - PLAN CHECK | 6/12/2012 | | 6/12/2012 | | PASS |
Dan Stuart
|
|
|
Plan Mod to permit desk to issue.
|
Print Occupancy Form | | | 6/12/2012 | | DONE |
|
|
|
|
Telephone call | | | 6/12/2012 | | DONE |
Christina Prado
|
|
|
called and gave Larry fees due and advised permit is ready
|
Override - Parcel Holds | | | 6/12/2012 | | |
|
|
|
|
Routing - PLAN CHECK | 5/30/2012 | | 6/11/2012 | | PASS |
Dan Stuart
|
|
|
|
Plan Modification Accepted | | | 5/30/2012 | | DONE |
Tisha Gallop
|
|
|
Plan Modification accepted for Bld12-00618 (Capital City Florist) to add additional space which is to be left in its current condition with no modifications or alterations. The space is adjacent to the rear of his existing space and has its own exterior exit; submitted on plan shee Four; routed to Dan Stuart.
|
Issue PAID IN FULL permit | | | 5/2/2012 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 5/1/2012 | | |
|
|
|
|
Plan assigned to (DRS) | 3/27/2012 | 3/27/2012 | 5/1/2012 | | PASS |
Dan Stuart
|
|
|
|
Routing - PLAN CHECK | 4/26/2012 | | 5/1/2012 | | PASS |
Dan Stuart
|
|
|
Approved with comments attached.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/2012 | | PASS |
|
|
|
Approved with red-line notes and attachments.
|
Print Occupancy Form | | | 5/1/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/1/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 5/1/2012 | | DONE |
Tisha Gallop
|
|
|
called Larry and told him permit is ready and fees, need GC/RCE/form and and RP
|
Plan resubmittals received | | | 4/30/2012 | | DONE |
Christina Prado
|
|
|
Received two sets of plans marked One, Two, Three & M/E-1 as well as one copy of a response letter address to Dan Stuart. Plans and letter given to Dan for review
|
1st review completed | | | 4/26/2012 | | FAIL |
|
|
|
Failed - Plan Check
|
Routing - FIRE | 4/24/2012 | | 4/26/2012 | | PASS |
Scott Arellano
|
|
|
|
Routing - PLAN CHECK | 3/29/2012 | | 4/24/2012 | | FAIL |
Dan Stuart
|
|
|
Resubmittals required. Routing to fire code analyst.
|
Plan resubmittals requested | | | 4/24/2012 | | DONE |
|
|
|
Copy of plan review e-mailed to architect.
|
Plan Reviewer's activity | | | 4/2/2012 | | DONE |
|
|
|
Notified Larry Sundell to contact ACHD to verify any requirements they may have for this new tenant.
|
Routing - Erosion and Sediment | 3/28/2012 | | 3/29/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00261 plan waiver approved with conditions attached to the permit.
|
Routing - PUBLIC WORKS | 3/28/2012 | | 3/28/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 3/28/2012 | | 3/28/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 3/27/2012 | | 3/28/2012 | | PASS |
Terry Records
|
|
|
|
Pending Assignment by JCB | 3/26/2012 | | 3/27/2012 | | DONE |
Jason Blais
|
|
|
|
Application received | | 3/23/2012 | 3/26/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/26/2012 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/26/2012 | | DONE |
Tisha Gallop
|
|
|
|