(EINSTEIN OILERY) To construct a new 1,180 sq. ft., wood framed, one story quick lube facility with a 365 sq. ft. office mezzanine and a 1,360 sq. ft. oil storage and lube access basement. This permit also includes related site improvements. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 11/19/201211/21/2012 DONE
Second Notice 10/25/201211/14/2012 DONE
First Notice 9/20/201210/15/2012 DONE
DetailsChristina Prado
mailed 10-15-12
BLD-Final9/7/20129/10/20129/10/2012ACANC
DetailsJim Sly
John Phone #: ###-####
Permanent Occupancy  9/10/2012 DONE
DetailsTisha Gallop
BLD-Final9/7/20129/7/20129/7/2012PPASS
DetailsJim Sly
OK for Perm Occ.
Zoning Approval9/7/20129/7/20129/7/2012 PASS
DetailsJosh Wilson
Building exterior completed
PubWorks Occupancy Approval8/13/20128/13/20128/13/2012 DONE
DetailsTiffany Lowery
BLD-Final8/2/20128/2/20128/3/2012PPART
DetailsJim Sly
john Phone #: ###-####
OK for Temp Occ. OK for perm occ when Plumb and Zoning perms............and metal siding on exterior of building is complete. Need to install address #'s on Baldcypress side of bldg.
Temporary Occupancy8/3/201211/1/20128/3/2012 DONE
DetailsAlexandra L. DeYoung
BLD-Final8/1/20128/2/20128/2/2012ANR
DetailsJim Sly
john Phone #: ###-####
Need Zoning, Plumb, and Mech finals.
FIRE-Final Inspection8/1/20128/2/20128/2/2012APASS
DetailsTroy Cobbley
Life safety passed. Corrections from yesterday have been addressed. A temporary address has been placed. Per Jim Sly he will verify the permanent address is installed when the siding is installed.
Zoning Approval Temp8/2/20128/2/20128/2/2012 PASS
DetailsJosh Wilson
OK 30-day temporary occupancy for completion of building exterior
FIRE-Final Inspection8/1/20128/1/20128/1/2012PFAIL
DetailsTroy Cobbley
There were no approved electronic plans /small documents on site. I noted the building address was missing, fire extinguishers were not hung, one exit sign was missing, one exit sign did not function and a sticker was needed at the keyed main exit.
BLD-Energy code compliance6/27/20126/28/20126/28/2012APASS
DetailsJim Sly
john Phone #: ###-#### if possible first thing please call before going out
BLD-Framing/Rough-in6/25/20126/25/20126/25/2012PPART
DetailsJim Sly
John Phone #: ###-####
Need all trade rough-ins approved....Strap and fireblocking chase. Will check at Energy code insp.
BLD-Wall Bracing6/15/20126/18/20126/18/2012APASS
DetailsJim Sly
John Phone #: ###-####
BLD-Other6/4/20126/5/20126/5/2012APART
DetailsJim Sly
rebar//John Phone #: ###-####
Structural floor OK.....Pending MTI special inspections, tests and approvals.
BLD-Other5/23/20125/24/20125/24/2012APASS
DetailsJim Sly
Rebar -- john Phone #: ###-####
Verified MTI contracted by owner....Special concrete inspector on site ........credentials OK. Foundation wall OK......pending MTI special insp , tests and approvals.


BLD-Concrete5/21/20125/21/20125/21/2012PPART
DetailsJim Sly
Re-bar inspection please-John Hill Phone #: ###-#### Footing and slab....OK Pending special inspections and approval of tests for compressive strength.
Permit Ready to Issue  5/18/2012 DONE
Telephone call  5/18/2012 DONE
emailed jonathan and tony - permit is ready fees due
Print Occupancy Form  5/18/2012 DONE
DetailsTisha Gallop
Issue PAID IN FULL permit  5/18/2012 DONE
DetailsTisha Gallop
Routing - PLAN CHECK5/15/2012 5/17/2012 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  5/17/2012 DONE
Plan assigned to (JCM)4/4/2012 5/17/2012 PASS
DetailsJohn Menard
Routing Off Site - STRUCTURAL5/15/2012 5/16/2012 PASS
DetailsJohn Menard
Routing - PLANNING5/15/2012 5/16/2012 PASS
DetailsDavid Moser
Approved as redlined, interior size of trash enclosure shall be 12 feet deep.
Routing - Design Review5/15/2012 5/16/2012 PASS
DetailsJosh Wilson
Routing - PLAN CHECK4/4/2012 5/10/2012 FAIL
DetailsJohn Menard
1st review completed  5/10/2012 FAIL
DetailsJohn Menard
Received Certificate of Value  4/26/2012 DONE
DetailsTisha Gallop
received revised cert of value to split out demo permit into Bld12-00950.
Routing PW Drainage4/4/2012 4/24/2012 PASS
DetailsBrian Murphy
Routing Off Site - STRUCTURAL4/4/2012 4/19/2012 FAIL
DetailsJohn Menard
Routing - Erosion and Sediment4/4/2012 4/9/2012 PASS
DetailsClint A Smith
ESC12-00281 plan approved with conditions attached to the permit.
Routing - Design Review4/4/2012 4/6/2012 FAIL
DetailsJosh Wilson
Corrections needed Sheet SP1.0 for trash enclosure dimensions
Routing - PLUMBING4/4/2012 4/5/2012 PASS
DetailsDaryl Spivey
Per plans and 2003 UPC.
Route to Impact Fee Review4/4/2012 4/5/2012 PASS
DetailsCindy M. Gould
Routing - FIRE4/4/2012 4/5/2012 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing PW Solid Waste4/4/2012 4/5/2012 PASS
DetailsPeter J. McCullough
Routing PW Environmental4/4/2012 4/5/2012 PASS
DetailsWalt Baumgartner
OK, only one floor sink in mech room of basement area per architect. Lift station in basement. No pretreatment.
Pending Assignment by JCM4/4/2012 4/4/2012 DONE
DetailsJohn Menard
Routing PW Sewer Rating4/4/2012 4/4/2012 PASS
DetailsConnie Baumgartner
Routing PW Street Lights4/4/2012 4/4/2012 PASS
DetailsMike D Hedge
Routing PW Sewer Design4/4/2012 4/4/2012 PASS
DetailsJon R. Gunnerson
Routing - PLANNING4/4/2012 4/4/2012 FAIL
DetailsDavid Moser
resubmittal sheet SP1 required trash enclouse size change; 12 foot interior depth.
Routing - PLANNING Land Div4/4/2012 4/4/2012 PASS
DetailsTodd Tucker
Routing - Addressing4/4/2012 4/4/2012 PASS
DetailsApril Wing
Routing - PUBLIC WORKS4/4/2012 4/4/2012 PASS
DetailsBeverly Mountain
Payment Received  4/2/2012 DONE
Payment received via Govolutions
Application received  3/28/2012 DONE
Application submitted via PDS Online on Mar 28 2012 1:19PM