Third Notice | | 9/24/2012 | 10/4/2012 | | DONE |
Christina Prado
|
|
|
complete 10-4-12
|
Second Notice | | 8/6/2012 | 9/19/2012 | | DONE |
|
|
|
mailed 9-20
|
First Notice | | 7/13/2012 | 7/27/2012 | | DONE |
|
|
|
|
Permanent Occupancy | | | 7/3/2012 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 7/2/2012 | 7/2/2012 | 7/2/2012 | P | PASS |
Jim Sly
|
|
|
RANDY Phone #: ###-#### OK for Perm Occ.
|
BLD-Final | 6/27/2012 | 6/28/2012 | 6/28/2012 | P | NR |
Jim Storey
|
|
|
Randy Phone #: ###-####
|
BLD-Final | 6/26/2012 | 6/27/2012 | 6/27/2012 | P | FAIL |
Jim Storey
|
|
|
Randy Phone #: ###-#### handrail west stair.
|
BLD-Final | 6/21/2012 | 6/25/2012 | 6/25/2012 | P | NR |
Jim Sly
|
|
|
Randy please call before giong out Phone #: ###-####
|
FIRE-Final Inspection | 6/22/2012 | 6/25/2012 | 6/25/2012 | A | PASS |
Forrest France
|
|
|
Previous items verified for completion. Life safety final passed.
|
FIRE-Conference | 5/23/2012 | 5/23/2012 | 5/25/2012 | P | DONE |
Troy Cobbley
|
|
|
The owner and I went over smoke detector placement and door hardware.
|
BLD-Framing/Rough-in | 5/22/2012 | 5/23/2012 | 5/23/2012 | A | PASS |
Tom Arcoraci
|
|
|
RANDY Phone #: ###-####
|
OVERRIDE | | | 5/8/2012 | | |
|
|
|
|
Plan assigned to (DRS) | 3/29/2012 | 3/29/2012 | 5/8/2012 | | PASS |
Dan Stuart
|
|
|
|
Issue PAID IN FULL permit | | | 5/8/2012 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 5/2/2012 | | 5/8/2012 | | PASS |
Dan Stuart
|
|
|
Approved as noted red-lines and attached plan reviews.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/8/2012 | | PASS |
Dan Stuart
|
|
|
|
Print Occupancy Form | | | 5/8/2012 | | DONE |
|
|
|
|
Telephone call | | | 5/8/2012 | | DONE |
Christina Prado
|
|
|
called Randy with River City Real Estate and gave fees due. Also advised GC, Rp & ACHD Letter are required prior to issuance. RP given over phone. Parcel owner will be GC
|
Permit Ready to Issue | | | 5/8/2012 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 5/7/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
rec'd response letter and two copies of sheets A-0.0 & A-2.0 - taken to Dan S
|
Route to Impact Fee Review | 5/1/2012 | 5/4/2012 | 5/3/2012 | | PASS |
Cindy M. Gould
|
|
|
tenant improvement no impact fees
|
Routing - FIRE | 5/1/2012 | 5/1/2012 | 5/2/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 5/2/2012 | | FAIL |
|
|
|
Failed Plan Check
|
Routing - PLAN CHECK | 4/3/2012 | | 5/1/2012 | | FAIL |
Dan Stuart
|
|
|
Copy of plan review e-mailed to architect. Routing plans to fire code analyst.
|
Plan resubmittals requested | | | 5/1/2012 | | DONE |
|
|
|
Plan review comments e-mailed to architect.
|
Telephone call | | | 4/30/2012 | | DONE |
|
|
|
Called Glenn Walker to discuss areas to be used as daycare. Based on labeling of room and area uses, the plan indicates approximately 1230 sq. ft. for daycare which would allow an occupant load for children of 35 instead of the 45 indicated on the application or 58 indicated on cover sheet. Glenn will review and indicate other rooms or areas intended for daycare use. Approximately 1,376 sq. ft. is "B" occupancy use group - 14 O.L. Also ask him to specify if there will be children 2-1/2 years of age or younger and which room(s) they would use. Depending on the room(s) used the occupancy use classification could be an "I-4" occupancy which requires a sprinkler system. If each room(s) to be used for children 2-1/2 yrs of less have door directly to the exterior, then per exception to 308.5.2, the daycare could be clasified as an "E" occupancy. I need a declaration from the daycare operator and owner specifying they will not have children 2-1/2 years or younger or floor plan indicating the specific rooms to be used for those 2-1/2 years or younger to to determine if this will be an "E" or "I-4" occupancy.
|
Routing - Design Review | 4/3/2012 | | 4/3/2012 | | PASS |
Josh Wilson
|
|
|
Josh Wilson - DRH12-00023
|
Routing - Erosion and Sediment | | | 4/3/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00284 plan waiver approved with conditions attached to the permit.
|
Routing - PLANNING | 4/3/2012 | | 4/3/2012 | | PASS |
Sue Cummings
|
|
|
Sue Cummings - CVA12-00004 & CUP12-00004
|
Routing PW Sewer Rating | 4/2/2012 | | 4/2/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 3/30/2012 | | 4/2/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 3/29/2012 | | 3/30/2012 | | PASS |
Terry Records
|
|
|
|
Intake Approval | | | 3/29/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Plan Reviewer's activity | | | 3/29/2012 | | DONE |
Jason Blais
|
|
|
Emailed applicant to have him contact ACHD to evaluate if any impact fees are required. Written verification from ACHD is required to be provided to our Permit Counter prior to the building permit being issued.
|
Pending Assignment by JCB | 3/29/2012 | | 3/29/2012 | | DONE |
Dan Stuart
|
|
|
|
Application received | | 3/28/2012 | 3/28/2012 | | DONE |
Christina Prado
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/28/2012 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/28/2012 | | DONE |
Christina Prado
|
|
|
|