Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD12-00676
StatusFinaled
Name TRILOGY DEVELOPMENT INC
Site Address 1461 S GOLDKING WAY
Project NameUnion Square Apartments
Customer Number 
ePlanReviewYes
Description
(UNION SQUARE) Community building/pool equipment room building #1. To construct a new 2,477 sq. ft. single story wood frame structure per approved plans. Community Room O.L. 49; Lobby O.L. 29; other 15 O.L. (NOTE: A-5 Occupancy: Pool/Deck Area will use building restrooms - Pool 16 O.L. / Deck 180 O.L). Work includes footing, foundation, framed walls, truss roof & sheathing, interior walls to create office's, community room, lobby room, kitchen area, exercise room, accessible restrooms & drinking fountains, pool equipment room and access to future pool (pool under separate permit), interior & exterior finishes, electrical, mechanical, plumbing and millwork, doors and hardware, all per reviewed plans. drs DRH12-00022 CUP08-ooo45
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/12/20138/2/2013 DONE
First Notice 6/22/20137/2/2013 DONE
DetailsBarbara Stitt
faxed 7-2-13
PubWorks Occupancy Approval6/12/20136/12/20136/12/2013 DONE
DetailsTiffany Lowery
Permanent Occupancy  6/12/2013 DONE
DetailsChristina Prado
Zoning Approval5/24/20135/24/20135/24/2013 PASS
DetailsJosh Wilson
Improvements complete- bond can be released.
Change Expiration Date Only  3/12/2013 DONE
DetailsBarbara Stitt
PubWorks Temp Occupancy Appr3/5/20133/5/20133/5/2013 DONE
DetailsBrian Murphy
Temporary Occupancy3/1/20135/30/20133/1/2013 DONE
DetailsTisha Gallop
BLD-Final2/28/20132/28/20132/28/2013PPASS
DetailsMike Jordan
Michael Phone #: ###-####Ok for temp occ. at this time. Will be ok for perm occ. once zoning signs eprm.
FIRE-Final Inspection2/27/20132/28/20132/28/2013APASS
DetailsTroy Cobbley
life safety passed. Per letter from engineer the duct smoke detector is not required by them. Dead bolt is going to be blanked off.
FIRE-Final Inspection2/27/20132/27/20132/27/2013PFAIL
DetailsTroy Cobbley
Provide verification from the mechanical engineer for the deletion of the duct smoke detector and provide verification from the building plan reviewer for permission to install double keyed lock on the weight room door. If installed an "indicator" and sticker will also be required.
Zoning Approval Temp1/30/20131/30/20131/30/2013 DONE
DetailsSarah Schafer
BLD-Energy code compliance11/9/201211/13/201211/13/2012PPASS
DetailsJim Sly
Kelly phone
OK to cover all but........Mechanical room and restrooms associated with pool area.
BLD-Energy code compliance11/9/201211/9/201211/9/2012PNR
DetailsJim Sly
Phone #: ###-#### >> Inspection requested via web by Kelly Perryman
Had a few corrections to complete before approval.
BLD-Framing/Rough-in11/7/201211/8/201211/8/2012APART
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Kelly Perryman dg3 need lgt2 simpson at bearing point #1/ fire blk ceilling at unusable space/ provide ada backing in restarooms.
BLD-Framing/Rough-in11/6/201211/6/201211/6/2012PNR
DetailsJim Sly
Phone #: ###-#### >> Inspection requested via web by Kelly Perryman
Need all Rough-ins approved.
BLD-Wall Bracing9/18/20129/18/20129/18/2012PPART
DetailsMike Jordan
kelly Phone #: ###-####. Exterior shear nailing and holdowns. Missing HD3B holddown at NW corner, Add additional blocking and nailing at vertical edges on shear panel 5. Correction notice was posted. Also needs to tighten bolts on holddowns.
BLD-Foundation7/12/20127/13/20127/13/2012APASS
DetailsMike Jordan
dane Phone #: ###-####. Perimeter footings ok.
BLD-Footing7/11/20127/11/20127/11/2012PPART
DetailsMike Jordan
dane Phone #: ###-####. Perimeter footings and column pad footings. Work inprogress on placing vertical steel.
Issue PAID IN FULL permit  7/9/2012 DONE
DetailsChristina Prado
Print Occupancy Form  7/9/2012 DONE
DetailsChristina Prado
Plan assigned to (DRS)4/12/20124/12/20126/28/2012 PASS
DetailsDan Stuart
Routing Off Site - STRUCTURAL4/12/2012 6/28/2012 PASS
Details
Routing Off Site - STRUCTURAL6/25/2012 6/28/2012 PASS
Details
Routing - PLAN CHECK6/28/2012 6/28/2012 PASS
DetailsDan Stuart
PLANS/APPL TAKEN TO FRONT DESK  6/28/2012 PASS
Routing - PLAN CHECK6/25/2012 6/25/2012 PEND
DetailsDan Stuart
Plans routed to outside structural engineering for re-review.
Routing - FIRE5/31/2012 6/1/2012 PASS
DetailsScott Arellano
Updated plan review report has been placed in e-plan review case. Mark up items has been removed. However, e-plan review case has not been re-circulated for sign off within e-plan review.

BLD12-00678 CVR sheet changed and plan sheet for clubhouse indicating occupant loads for each room as being less than 50 with each room having a single exit to serve the less than 50.*DRS*
Routing PW Sewer Design5/24/2012 6/1/2012 PASS
DetailsJon R. Gunnerson
Routing PW Sewer Design4/12/2012 6/1/2012 PASS
DetailsJon R. Gunnerson
Routing - Design Review5/31/2012 5/31/2012 PASS
DetailsJosh Wilson
Ok per DRH12-00111
Plan resubmittals received  5/24/2012 DONE
DetailsDan Stuart
Resubmittals received for routing back to fire code analyst and public works for re-review.
Routing - PLAN CHECK4/12/2012 5/17/2012 FAIL
DetailsDan Stuart
Resubmittals required. See plan review comments attached to BLD12-00678, Bldg #5, applicable to all buildings of this project.
Routing - Erosion and Sediment4/12/2012 4/19/2012 PASS
DetailsClint A Smith
ESC plan approved with conditions attached to the permit.
Routing - PLUMBING4/12/2012 4/18/2012 PASS
DetailsBill VanDegrift
Change 1 1/2" DCVA for pool water to a RPBP and install in pool equipment room.
All other plumbing per plans and 2003 UPC.
Route to Impact Fee Review4/16/20124/19/20124/17/2012 PASS
DetailsShauna Surgeon
Route to Impact Fee Review4/12/20124/17/20124/16/2012 PASS
DetailsShauna Surgeon
Routing - FIRE4/12/20124/16/20124/16/2012 FAIL
DetailsScott Arellano
Faxed, emailed and uploaded resubmittal items to architect.
Routing PW Sewer Rating4/12/2012 4/16/2012 PASS
DetailsConnie Baumgartner
Routing - Addressing4/12/2012 4/16/2012 PASS
DetailsTerry Records
Routing - PLANNING Land Div4/12/2012 4/13/2012 PASS
DetailsDave Abo
Lot 7 of Union Square Subdivision No. 2.
Routing PW Solid Waste4/12/2012 4/13/2012 PASS
DetailsPeter J. McCullough
Routing - PLANNING4/12/2012 4/13/2012 PASS
DetailsSusan Riggs
Routing - PUBLIC WORKS4/12/2012 4/12/2012 PASS
DetailsBeverly Mountain
Routing - Design Review4/12/2012 4/12/2012 FAIL
DetailsJosh Wilson
Design Review and CUP modification required.
Intake Approval  4/10/2012 PASS
DetailsDan Stuart
Application received  3/29/2012 DONE
Application submitted via PDS Online on Mar 29 2012 1:43PM