Case Summary (BLD) | | | 1/24/2014 | | DONE |
|
|
|
|
First Notice | | 7/19/2013 | 8/12/2013 | | DONE |
|
|
|
This permit finaled on the web by Mike McHargue
|
Permanent Occupancy | | | 7/9/2013 | | DONE |
Christina Prado
|
|
|
|
Temporary Occupancy | 6/12/2013 | 9/10/2013 | 6/12/2013 | | DONE |
Christina Prado
|
|
|
|
Zoning Approval | 6/11/2013 | 6/11/2013 | 6/11/2013 | | PASS |
Josh Wilson
|
|
|
|
PubWorks Occupancy Approval | 6/7/2013 | 6/7/2013 | 6/7/2013 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 6/6/2013 | 6/6/2013 | 6/6/2013 | P | PASS |
Mike Jordan
|
|
|
All penetrations have been fire caulked
Please check at you leisure Phone #: ###-#### >> Inspection requested via web by Fred Depold. Ok for temp occ. Will be ok for perm occ once zoning and public works have signed off.
|
BLD-Final | 6/4/2013 | 6/5/2013 | 6/5/2013 | A | FAIL |
Mike Jordan
|
|
|
>> Inspection requested via web by Fred Depold. Complete all fire stopping on membrane penetrations.
|
BLD-Final | 6/4/2013 | 6/5/2013 | 6/4/2013 | A | CANC |
Mike Jordan
|
|
|
bring cerveza on ice please Phone #: ###-#### >> Inspection requested via web by Fred Depold Inspection cancelled from web by: Fred Depold
|
FIRE-Final Inspection | 6/3/2013 | 6/3/2013 | 6/4/2013 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Conference | 4/8/2013 | 4/8/2013 | 4/8/2013 | P | DONE |
Mike Jordan
|
|
|
|
BLD-Wall cover | 1/14/2013 | 1/14/2013 | 1/14/2013 | P | PASS |
Tom Arcoraci
|
|
|
Please look at all sheet rock installed and approve to tape and texture
Thanks- fred Phone #: ###-#### >> Inspection requested via web by Kelly Perryman
|
BLD-Wall cover | 1/9/2013 | 1/10/2013 | 1/10/2013 | A | PASS |
Mike Jordan
|
|
|
Base layer of 5/8 type x rock on 1hr. floor ceiling assemblies ok.
Mike,we have the first layer of rock on the ceiling building 6. Please come by and approve for second layer.
Thanks- Fred
Phone #: ###-#### >> Inspection requested via web by Kelly Perryman
|
BLD-Energy code compliance | 1/7/2013 | 1/7/2013 | 1/7/2013 | P | PASS |
Mike Jordan
|
|
|
Energy Inspection Please Phone #: ###-#### >> Inspection requested via web by Kelly Perryman
|
BLD-Energy code compliance | 12/27/2012 | 12/28/2012 | 12/27/2012 | A | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kelly Perryman Inspection cancelled from web by: Kelly Perryman
|
BLD-Framing/Rough-in | 12/21/2012 | 12/24/2012 | 12/24/2012 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kelly Perryman
|
BLD-Framing/Rough-in | 12/17/2012 | 12/18/2012 | 12/18/2012 | A | PART |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kelly Perryman. COmplete all firestopping and blocking. no cover at this time.
|
BLD-Wall Bracing | 12/11/2012 | 12/11/2012 | 12/11/2012 | P | PASS |
Mike Jordan
|
|
|
Shear Phone #: ###-#### >> Inspection requested via web by Kelly Perryman. Exterior shear and holddowns ok.
|
BLD-Framing/Rough-in | 12/5/2012 | 12/5/2012 | 12/5/2012 | P | FAIL |
Mike Jordan
|
|
|
Shear Phone #: ###-#### >> Inspection requested via web by Kelly Perryman. Renail all missed areas, tighten all holddowns, exterior shear only.
|
BLD-Foundation | 8/13/2012 | 8/14/2012 | 8/14/2012 | A | PASS |
Mike Jordan
|
|
|
late am//Dane Phone #: ###-####
|
BLD-Foundation | 8/10/2012 | 8/10/2012 | 8/10/2012 | P | PASS |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
Print Occupancy Form | | | 8/10/2012 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 8/10/2012 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 8/10/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (DRS) | 4/13/2012 | 4/13/2012 | 6/28/2012 | | PASS |
Dan Stuart
|
|
|
|
Routing - PLANNING Land Div | 4/13/2012 | | 6/28/2012 | | PASS |
Ron Hill
|
|
|
|
Routing - PUBLIC WORKS | 4/13/2012 | | 6/28/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLAN CHECK | 6/28/2012 | | 6/28/2012 | | PASS |
Dan Stuart
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2012 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 5/24/2012 | | 6/27/2012 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 4/13/2012 | | 6/27/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00366 approved with additional conditions attached to the permit.
|
Routing - MECHANICAL | 5/24/2012 | | 6/1/2012 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 5/24/2012 | | 5/31/2012 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLAN CHECK | 5/24/2012 | | 5/31/2012 | | PASS |
Dan Stuart
|
|
|
Approved as red lined and all attached plan reviews of all agencies.
|
Routing - PLANNING | 4/13/2012 | | 5/31/2012 | | PASS |
Susan Riggs
|
|
|
|
Routing - PLUMBING | 5/30/2012 | | 5/30/2012 | | PASS |
Bill VanDegrift
|
|
|
3 toilets max on 3" horizontal waste
|
Plan resubmittals received | | | 5/24/2012 | | DONE |
Dan Stuart
|
|
|
Resubmittals routed back to all agencies requiring re-review.
|
Routing - PLAN CHECK | 4/13/2012 | | 5/24/2012 | | PEND |
Dan Stuart
|
|
|
|
Routing Off Site - STRUCTURAL | 4/13/2012 | | 5/24/2012 | | PASS |
|
|
|
|
Routing - PLUMBING | 4/13/2012 | | 4/19/2012 | | FAIL |
Bill VanDegrift
|
|
|
see bld12-00678 for comments
|
Routing - Design Review | 4/13/2012 | | 4/18/2012 | | FAIL |
Josh Wilson
|
|
|
Design Review and CUP modification required.
|
Routing - MECHANICAL | 4/13/2012 | | 4/17/2012 | | FAIL |
Troy James
|
|
|
talked to cathy with ECI for corrections to be made
|
Routing - FIRE | 4/13/2012 | | 4/17/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to permit case.
|
Route to Impact Fee Review | 4/13/2012 | 4/18/2012 | 4/16/2012 | | PASS |
Shauna Surgeon
|
|
|
|
Routing - Addressing | 4/13/2012 | | 4/16/2012 | | PASS |
Terry Records
|
|
|
For Apt #'s See Addressing Documents- Apartment Bldgs should use Apt #'s created by the City to meet Addressing requirements.
|
Intake Approval | | | 4/10/2012 | | PASS |
|
|
|
|
Application received | | | 3/29/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 29 2012 1:46PM
|