(126 Unit Multi-Family Development)(Building 7) To construct a wood frame, three story, 23,364 sq. ft., 24 Unit Multi Family Dwellings (12-2B/2B & 12-2B/1B), per reviewed plans. All units exceed 800 sq. ft., are fully sprinklered W/ alarm. Work includes associated site work, footing & foundation, structural & non-structural framing; electrical, mechanical, plumbing, sprinkler & alarm work; fire-resistive construction between units, at stair enclosures or rated corridor breezeways; accessible Type 'B' units; interior cabinetry, wall, floor and ceiling finishes and fixtures. All per the reviewed plans. drs DRH12-00022 CUP08-00045
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  1/24/2014 DONE
First Notice 6/22/20138/12/2013 DONE
This permit finaled on the web by Mike McHargue
PubWorks Occupancy Approval6/12/20136/12/20136/12/2013 DONE
DetailsTiffany Lowery
Permanent Occupancy  6/12/2013 DONE
DetailsChristina Prado
BLD-Final6/11/20136/11/20136/11/2013PPASS
DetailsMike Jordan
Lets try this again >> Inspection requested via web by Fred Depold. Ok for perm occ.
BLD-Final6/6/20136/7/20136/7/2013PNR
DetailsMike Jordan
This building is ready for final, Monday 7/10 works however if for any reason your schedule lightens up before Monday we are ready and Mikey will earn brownie points with the owners :-) >> Inspection requested via web by Fred Depold. Complete firecaulking on all rated penetrations, provide tempered glazing were required. Need blower door test results posted.
FIRE-Final Inspection6/4/20136/5/20136/5/2013APASS
DetailsTroy Cobbley
Fire Life Safety passed. All smoke alarms tested ok.
BLD-Footing3/11/20133/12/20133/12/2013ACANC
DetailsMike Jordan
mike Phone #: ###-####. Inspection done yesterday in the pm.
BLD-Conference3/11/20133/11/20133/11/2013PPART
DetailsMike Jordan
Footing for stair foundation, east stairs per RFI from engineer.
BLD-Wall cover2/6/20132/7/20132/7/2013APASS
DetailsMike Jordan
This should be the final trip to approve taping in the last units Phone #: ###-#### >> Inspection requested via web by Fred Depold. Remainder of rooms ok to toape.
BLD-Wall cover2/6/20132/6/20132/6/2013ANR
DetailsMike Jordan
BLD-Wall cover2/5/20132/5/20132/5/2013PPASS
DetailsMike Jordan
sheet rock inspection balance of building approve to tape

As late in day as possible say 4 would be great if possible >> Inspection requested via web by Fred Depold. south end and middle units, floors 1-3 ok to tape. North units floor 1 and 3 ok. Still working on 2nd. floor.
BLD-Wall cover2/4/20132/4/20132/4/2013PPASS
DetailsMike Jordan
sheet rock screw off inspection >> Inspection requested via web by Fred Depold
BLD-Wall cover1/31/20132/1/20132/1/2013APART
DetailsMike Jordan
Inspect sheet rock screw application to approve taping in building 7 top floor.

Early morning if possible

Thankyou- Fred Phone #: ###-#### >> Inspection requested via web by Fred Depold. Third floor, center units only ok to tape.
BLD-Energy code compliance1/23/20131/24/20131/24/2013APASS
DetailsJim Sly
Inspect insulation please and approve for wall cover. Phone #: ###-#### >> Inspection requested via web by Kelly Perryman
BLD-Energy code compliance1/16/20131/17/20131/17/2013APASS
DetailsTom Arcoraci
Ready to inspect fire caulking and all penetrations sealed

Thanks- Fred Phone #: ###-#### >> Inspection requested via web by Kelly Perryman
BLD-Wall Bracing12/11/201212/11/201212/11/2012PPASS
DetailsMike Jordan
Shear Phone #: ###-#### >> Inspection requested via web by Kelly Perryman. Exterior shear and holdowns ok.
FIRE-Conference12/6/201212/7/201212/7/2012ADONE
DetailsTroy Cobbley
Kelly and I discussed the placement of smoke alarms in the resident rooms.
BLD-Wall Bracing12/5/201212/6/201212/6/2012AFAIL
DetailsMike Jordan
Provide blocking at corridor walls, tighten all holdowns, re-nail all areas that were missed.
BLD-Framing/Rough-in12/5/201212/5/201212/5/2012PNR
DetailsMike Jordan
Need Shear Inspection >> Inspection requested via web by Kelly Perryman
BLD-Foundation8/24/20128/27/20128/27/2012APASS
DetailsMike Jordan
Dane Phone #: ###-####. South half stemwall ok.
BLD-Foundation8/22/20128/23/20128/23/2012APART
DetailsMike Jordan
dane Phone #: ###-####. Stemwalls north half only ok.
BLD-Footing8/17/20128/20/20128/20/2012APASS
DetailsMike Jordan
Dane Phone #: ###-####
Permit Ready to Issue  8/16/2012 DONE
DetailsBarbara Stitt
Issue PAID IN FULL permit  8/16/2012 DONE
DetailsBarbara Stitt
Print Occupancy Form  8/16/2012 DONE
DetailsBarbara Stitt
Plan assigned to (DRS)4/13/20124/13/20126/28/2012 PASS
DetailsDan Stuart
Routing - PLANNING Land Div4/13/2012 6/28/2012 PASS
DetailsDave Abo
Routing - PUBLIC WORKS4/13/2012 6/28/2012 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment4/13/2012 6/28/2012 PASS
DetailsClint A Smith
ESC###-####7 appproved with conditions attached to the permit.
Routing Off Site - STRUCTURAL5/24/2012 6/28/2012 PASS
Details
Routing - PLAN CHECK6/28/2012 6/28/2012 PASS
DetailsDan Stuart
PLANS/APPL TAKEN TO FRONT DESK  6/28/2012 PASS
Routing - MECHANICAL5/24/2012 6/1/2012 PASS
DetailsTroy James
Routing - Design Review5/24/2012 5/31/2012 PASS
DetailsJosh Wilson
Routing - PLAN CHECK5/24/2012 5/31/2012 PASS
DetailsDan Stuart
Approved with red line notes and all attached plan reviews of all agencies.
Routing - PLANNING4/13/2012 5/31/2012 PASS
DetailsSusan Riggs
Routing - PLUMBING5/30/2012 5/30/2012 PASS
DetailsBill VanDegrift
3 TOILETS MAX ON 3" HORIZONTAL WASTE
Plan resubmittals received  5/24/2012 DONE
DetailsDan Stuart
Resubmittals routed back to all agencies requiring re-review.
Routing - PLAN CHECK4/13/2012 5/17/2012 FAIL
DetailsDan Stuart
Resubmittals required. See plan review attached to BLD12-00678, Bldg. #5, applicable to all buildings in this project.
Routing Off Site - STRUCTURAL4/13/2012 4/30/2012 FAIL
Details
Routing - PLUMBING4/13/2012 4/19/2012 FAIL
DetailsBill VanDegrift
see bld12-00678 for comments
Routing - Design Review4/13/2012 4/18/2012 FAIL
DetailsJosh Wilson
Design Review and CUP modification required.
Routing - MECHANICAL4/13/2012 4/17/2012 FAIL
DetailsTroy James
talked to cathy with ECI for corrections to be made
Routing - FIRE4/13/2012 4/17/2012 PASS
DetailsScott Arellano
Attached IFC comments to plans
Route to Impact Fee Review4/13/20124/18/20124/16/2012 PASS
DetailsShauna Surgeon
Routing - Addressing4/13/2012 4/16/2012 PASS
DetailsTerry Records
For Apt #'s See Addressing Documents- Apartment Bldgs should use Apt #'s created by the City to meet Addressing requirements.
Intake Approval  4/10/2012 PASS
DetailsDan Stuart
Application received  3/29/2012 DONE
Application submitted via PDS Online on Mar 29 2012 1:46PM