Case Summary (BLD) | | | 1/24/2014 | | DONE |
|
|
|
|
First Notice | | 6/15/2013 | 8/12/2013 | | DONE |
|
|
|
This permit finaled on the web by Mike McHargue
|
PubWorks Occupancy Approval | 6/6/2013 | 6/6/2013 | 6/6/2013 | | DONE |
Tiffany Lowery
|
|
|
|
Permanent Occupancy | | | 6/5/2013 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Aging Inspection | 5/24/2013 | 5/24/2013 | 5/24/2013 | | PASS |
Mike Jordan
|
|
|
|
Zoning Approval | 5/24/2013 | 5/24/2013 | 5/24/2013 | | PASS |
Josh Wilson
|
|
|
Improvements complete- bond can be released.
|
Change Expiration Date Only | | | 3/12/2013 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 3/5/2013 | 3/5/2013 | 3/5/2013 | P | PASS |
Mike Jordan
|
|
|
will be ok for perm occ. once zoning signs perm.
|
BLD-Final | 3/4/2013 | 3/5/2013 | 3/5/2013 | A | PEND |
Tom Arcoraci
|
|
|
michael Phone #: ###-#### sent to 450 for pm insp
|
Temporary Occupancy | 3/1/2013 | 5/30/2013 | 3/1/2013 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 2/28/2013 | 2/28/2013 | 2/28/2013 | P | PART |
Mike Jordan
|
|
|
Michael Phone #: ###-####. Ok for temp occ. Needs to complete minor firecaulking on plumbing fixtures.
|
FIRE-Final Inspection | 2/27/2013 | 2/28/2013 | 2/28/2013 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Conference | 2/25/2013 | 2/25/2013 | 2/25/2013 | P | DONE |
Mike Jordan
|
|
|
Michael Phone #: ###-####
|
Zoning Approval Temp | 1/30/2013 | 1/30/2013 | 1/30/2013 | | DONE |
Sarah Schafer
|
|
|
|
BLD-Other | 11/2/2012 | 11/5/2012 | 11/5/2012 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 11/2/2012 | 11/2/2012 | 11/2/2012 | P | PASS |
Mike Jordan
|
|
|
Interior shear walls, 1st. flor base layer on horizontal assemblies, face layers at 2nd floor horizontal assemblies.
|
BLD-Energy code compliance | 10/29/2012 | 10/29/2012 | 10/29/2012 | P | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kelly Perryman
|
BLD-Framing/Rough-in | 10/25/2012 | 10/25/2012 | 10/25/2012 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kelly Perryman. ok to insulate.
|
BLD-Framing/Rough-in | 10/23/2012 | 10/23/2012 | 10/23/2012 | P | PART |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kelly Perryman. Complete all firestopping, brovide blocking for interior shear walls. Still needs fire sprinkler and alarm rough in inspections. No cover at this time.
|
BLD-Framing/Rough-in | 10/19/2012 | 10/19/2012 | 10/19/2012 | P | PART |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kelly Perryman. 1st. floor only, no cover at this time. Fire sprinkler rough in inspection failed. Also noted missing fire caulking for low voltage wiring (fire alarm) unprotected penetration through horizontal asssembly. Contractor to provide approverd UL rated assembly for membrane penetration of bulk wiring through 1hr corridor.
|
BLD-Wall Bracing | 10/5/2012 | 10/5/2012 | 10/5/2012 | P | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kelly Perryman
|
Issue PAID IN FULL permit | | | 8/1/2012 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/1/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/18/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (DRS) | 4/13/2012 | 4/13/2012 | 6/28/2012 | | PASS |
Dan Stuart
|
|
|
|
Routing - PLANNING Land Div | 4/13/2012 | | 6/28/2012 | | PASS |
Dave Abo
|
|
|
|
Routing - PUBLIC WORKS | 4/13/2012 | | 6/28/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 4/13/2012 | | 6/28/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00369 appproved with conditions attached to the permit.
|
Routing - PLAN CHECK | 6/28/2012 | | 6/28/2012 | | PASS |
Dan Stuart
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2012 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 5/24/2012 | | 6/28/2012 | | PASS |
|
|
|
|
Print Occupancy Form | | | 6/27/2012 | | DONE |
Tisha Gallop
|
|
|
|
Routing - MECHANICAL | 5/24/2012 | | 6/1/2012 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 5/24/2012 | | 5/31/2012 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLAN CHECK | 5/24/2012 | | 5/31/2012 | | PASS |
Dan Stuart
|
|
|
Approved with red line notes and all attached agency plan reviews.
|
Routing - PLANNING | 4/13/2012 | | 5/31/2012 | | PASS |
Susan Riggs
|
|
|
|
Routing - PLUMBING | 5/30/2012 | | 5/30/2012 | | PASS |
Bill VanDegrift
|
|
|
3 toilets max on 3" horizontal waste
|
Plan resubmittals received | | | 5/24/2012 | | DONE |
Dan Stuart
|
|
|
Resubmittals routed back for re-review to applicable agencies.
|
Routing - PLAN CHECK | 4/13/2012 | | 5/17/2012 | | FAIL |
Dan Stuart
|
|
|
Resubmittals required. See plan review attached to BLD12-00678, Bldg. #5, applicable to all buildings in this project.
|
Routing Off Site - STRUCTURAL | 4/13/2012 | | 4/30/2012 | | FAIL |
|
|
|
|
Routing - PLUMBING | 4/13/2012 | | 4/19/2012 | | FAIL |
Bill VanDegrift
|
|
|
see bld12-00678 for comments
|
Routing - Design Review | 4/13/2012 | | 4/18/2012 | | FAIL |
Josh Wilson
|
|
|
Design Review and CUP modification required.
|
Routing - MECHANICAL | 4/13/2012 | | 4/17/2012 | | FAIL |
Troy James
|
|
|
talked to cathy with ECI for corrections to be made
|
Routing - FIRE | 4/13/2012 | | 4/17/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to Permit Case
|
Route to Impact Fee Review | 4/13/2012 | 4/18/2012 | 4/16/2012 | | PASS |
Shauna Surgeon
|
|
|
|
Routing - Addressing | 4/13/2012 | | 4/16/2012 | | PASS |
Terry Records
|
|
|
For Apt #'s See Addressing Documents- Apartment Bldgs should use Apt #'s created by the City to meet Addressing requirements.
|
Intake Approval | | | 4/10/2012 | | PASS |
|
|
|
|
Application received | | | 3/29/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 29 2012 1:46PM
|