Case Summary (BLD) | | | 1/24/2014 | | DONE |
|
|
|
|
First Notice | | 5/10/2013 | 8/12/2013 | | DONE |
|
|
|
This permit finaled on the web by Mike McHargue
|
Permanent Occupancy | | | 4/30/2013 | | DONE |
Christina Prado
|
|
|
|
Zoning Approval | 4/15/2013 | 4/15/2013 | 4/15/2013 | | PASS |
Josh Wilson
|
|
|
Building 11 is complete.
|
Override - Parcel Holds | | | 4/15/2013 | | |
|
|
|
|
PubWorks Occupancy Approval | 4/10/2013 | 4/10/2013 | 4/10/2013 | | DONE |
Brian Murphy
|
|
|
Per occupancy sign off card
|
Change Expiration Date Only | | | 3/12/2013 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 2/28/2013 | 2/28/2013 | 2/28/2013 | P | PASS |
Mike Jordan
|
|
|
Michael Phone #: ###-####. Will be ok for perm occ. once zoning signs perms.
|
FIRE-Final Inspection | 2/27/2013 | 2/28/2013 | 2/28/2013 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Temporary Occupancy | 2/1/2013 | 5/2/2013 | 2/1/2013 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 1/31/2013 | 1/31/2013 | 1/31/2013 | P | PART |
Mike Jordan
|
|
|
MIKE Phone #: ###-####. OK for eprm occ.
|
Zoning Approval Temp | 1/30/2013 | 1/30/2013 | 1/30/2013 | | DONE |
Sarah Schafer
|
|
|
|
BLD-Final | 1/23/2013 | 1/23/2013 | 1/23/2013 | P | PEND |
Jim Sly
|
|
|
We are requesting a Final Inspection "Consultation" for our first building Phone #: ###-#### >> Inspection requested via web by Kelly Perryman
Explained requirements to obtain Certificate of Occupancy.
|
BLD-Other | 10/25/2012 | 10/25/2012 | 10/25/2012 | P | PASS |
Mike Jordan
|
|
|
base layer, 1hr. corridor lids ok.
|
BLD-Other | 10/24/2012 | 10/24/2012 | 10/24/2012 | P | NR |
Mike Jordan
|
|
|
|
BLD-Other | 10/24/2012 | 10/24/2012 | 10/24/2012 | A | NR |
Mike Jordan
|
|
|
|
BLD-Other | 10/23/2012 | 10/23/2012 | 10/23/2012 | P | PASS |
Mike Jordan
|
|
|
1st. floor party walls and horizontal assemblies ok. Base layer 2nd floor corridor ceiling ok, face layer 1st floor corridor ceiling ok.
|
BLD-Other | 10/22/2012 | 10/23/2012 | 10/23/2012 | A | PART |
Mike Jordan
|
|
|
1st floor party walls and face layers of 5/8 type x rock, corridor base layers of 5/8 type x rock at floor ceiling assemblies.
|
BLD-Other | 10/22/2012 | 10/22/2012 | 10/22/2012 | P | PART |
Mike Jordan
|
|
|
Face layer 5/8 type x rock at horizontal assembly. 1st. floor.
|
BLD-Conference | 10/22/2012 | 10/22/2012 | 10/22/2012 | A | PART |
Mike Jordan
|
|
|
BAse layer for horizontal assembly, 1st. foor.
|
BLD-Other | 10/19/2012 | 10/19/2012 | 10/19/2012 | P | PASS |
Mike Jordan
|
|
|
2nd floor horizontal assemblies and fire partions in dwelling units ok for cover.
|
BLD-Other | 10/19/2012 | 10/19/2012 | 10/19/2012 | A | PART |
Mike Jordan
|
|
|
BAse and face layers for horizontal assembly, 2nd. floor.
|
BLD-Other | 10/18/2012 | 10/18/2012 | 10/19/2012 | P | PART |
Mike Jordan
|
|
|
2nd floor horizontal assembly, base layers.
|
BLD-Other | 10/17/2012 | 10/18/2012 | 10/18/2012 | A | PASS |
Mike Jordan
|
|
|
2nd. floor 1hr. horizontal assembly, base layer of 5/8 type x rock ok.
|
BLD-Conference | 10/17/2012 | 10/17/2012 | 10/17/2012 | P | DONE |
Mike Jordan
|
|
|
Went over horizontal assembly detail with sheet rock foreman.
|
BLD-Energy code compliance | 10/17/2012 | 10/17/2012 | 10/17/2012 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Conference | 10/12/2012 | 10/12/2012 | 10/12/2012 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 10/10/2012 | 10/10/2012 | 10/10/2012 | P | PART |
Tom Arcoraci
|
|
|
Need to have Jim come out for a framing re inspection Phone #: ###-#### >> Inspection requested via web by Kelly Perryman
|
BLD-Framing/Rough-in | 10/5/2012 | 10/5/2012 | 10/5/2012 | P | PART |
Tom Arcoraci
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kelly Perryman dicussed fire stopping
|
BLD-Wall Bracing | 8/24/2012 | 8/24/2012 | 8/24/2012 | P | PASS |
Mike Jordan
|
|
|
kelly Phone #: ###-####. Exterior shear wall and all required straps installed. ok to cover.
|
BLD-Conference | 8/20/2012 | 8/20/2012 | 8/20/2012 | P | DONE |
Mike Jordan
|
|
|
Spoke to framing subcontractor abput truss blocking.
|
BLD-Conference | 8/9/2012 | 8/10/2012 | 8/10/2012 | A | DONE |
Mike Jordan
|
|
|
Meeting with subcotractors. Met with subcontractors on site to discuss all rated penetrations and what will be required.
|
BLD-Conference | 7/26/2012 | 7/26/2012 | 7/27/2012 | P | DONE |
Mike Jordan
|
|
|
|
BLD-Conference | 7/24/2012 | 7/24/2012 | 7/24/2012 | A | DONE |
Mike Jordan
|
|
|
Reviewed plans, framing, and firerated construction details with framer and general contractor.
|
Permit Ready to Issue | | | 7/18/2012 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 7/18/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (DRS) | 4/13/2012 | 4/13/2012 | 6/28/2012 | | PASS |
Dan Stuart
|
|
|
|
Routing - PLANNING Land Div | 4/13/2012 | | 6/28/2012 | | PASS |
Dave Abo
|
|
|
|
Routing - PUBLIC WORKS | 4/13/2012 | | 6/28/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 4/13/2012 | | 6/28/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00371 appproved with conditions attached to the permit.
|
Routing - PLAN CHECK | 5/24/2012 | | 6/28/2012 | | PASS |
Dan Stuart
|
|
|
Approved with red line notes and all attached plan reviws of all reviewing agencies.
|
Routing Off Site - STRUCTURAL | 5/24/2012 | | 6/28/2012 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2012 | | PASS |
|
|
|
|
Routing - PLANNING | 5/24/2012 | | 6/27/2012 | | PASS |
Susan Riggs
|
|
|
|
Print Occupancy Form | | | 6/27/2012 | | DONE |
|
|
|
|
Routing - MECHANICAL | 5/24/2012 | | 6/1/2012 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 5/24/2012 | | 5/31/2012 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLANNING | 4/13/2012 | | 5/31/2012 | | PASS |
Susan Riggs
|
|
|
|
Routing - PLUMBING | 5/30/2012 | | 5/30/2012 | | PASS |
Bill VanDegrift
|
|
|
added sizing note.
|
Plan resubmittals received | | | 5/24/2012 | | DONE |
|
|
|
Resubmittals re-routed for re-review to applicable agencies.
|
Routing - PLAN CHECK | 4/13/2012 | | 5/17/2012 | | FAIL |
Dan Stuart
|
|
|
Resubmittals required. See plan review attached to BLD12-00678, Bldg. #5, applicable to all buildings in this project.
|
Routing Off Site - STRUCTURAL | 4/13/2012 | | 4/30/2012 | | FAIL |
|
|
|
|
Routing - PLUMBING | 4/13/2012 | | 4/19/2012 | | FAIL |
Bill VanDegrift
|
|
|
see bld12-00678 for comments
|
Routing - Design Review | 4/13/2012 | | 4/18/2012 | | FAIL |
Josh Wilson
|
|
|
Design Review and CUP modification required.
|
Telephone call | | | 4/18/2012 | | DONE |
Josh Wilson
|
|
|
Applicant contacted to inform of need for CUP and DR modifications. Submitted site plan does not match approved plans in CUP10-00070 for location and layout of apartment buildings. Design Review modification will be required for minor changes to pool building layout and apartment building elevations.
|
Routing - MECHANICAL | 4/13/2012 | | 4/17/2012 | | FAIL |
Troy James
|
|
|
talked to cathy with ECI about corrections to be made
|
Routing - FIRE | 4/13/2012 | | 4/17/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to permit case.
|
Route to Impact Fee Review | 4/13/2012 | 4/18/2012 | 4/16/2012 | | PASS |
Shauna Surgeon
|
|
|
|
Routing - Addressing | 4/13/2012 | | 4/16/2012 | | PASS |
Terry Records
|
|
|
For Apt #'s See Addressing Documents- Apartment Bldgs should use Apt #'s created by the City to meet Addressing requirements.
|
Intake Approval | | | 4/10/2012 | | PASS |
Dan Stuart
|
|
|
|
Application received | | | 3/29/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 29 2012 1:46PM
|