Third Notice | | 6/10/2014 | 6/10/2014 | | DONE |
|
|
|
This permit finaled on the web by Mike McHargue
|
Second Notice | | 5/5/2014 | 6/5/2014 | | DONE |
|
|
|
e-mailed to John Laude and Mike McHargue at Trilogy Dev.
|
First Notice | | 4/12/2014 | 4/25/2014 | | DONE |
|
|
|
mailed
|
Permanent Occupancy | | | 4/2/2014 | | DONE |
|
|
|
|
BLD-Final | 8/13/2013 | 8/13/2013 | 8/13/2013 | P | PASS |
Mike Jordan
|
|
|
Carports Phone #: ###-#### >> Inspection requested via web by Mike McHargue
|
FIRE-Final Inspection | 8/12/2013 | 8/12/2013 | 8/13/2013 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Foundation | 6/20/2013 | 6/21/2013 | 6/21/2013 | A | PASS |
Mike Jordan
|
|
|
Please inspect post footings to approve to pour cement >> Inspection requested via web by Fred Depold
|
BLD-Footing | 3/14/2013 | 3/15/2013 | 3/15/2013 | A | PASS |
Mike Jordan
|
|
|
Michael Phone #: ###-####
|
BLD-Footing | 3/14/2013 | 3/14/2013 | 3/14/2013 | P | NR |
Mike Jordan
|
|
|
Michael Phone #: ###-####. Needs to provide the approved plans. No concrete at this time.
|
BLD-Footing | 12/20/2012 | 12/21/2012 | 12/21/2012 | A | PASS |
Mike Jordan
|
|
|
Please look at footings for car port post
If possible please come as early as possible, they want to pour those in the morning.
Thankyou for your support Phone #: ###-#### >> Inspection requested via web by Kelly Perryman
|
BLD-Footing | 12/13/2012 | 12/14/2012 | 12/14/2012 | A | NR |
Mike Jordan
|
|
|
Inspect the footings on the carport posts in front of building 8.. approx. 10 holes.. Phone #: ###-#### >> Inspection requested via web by Kelly Perryman. No approved plan on site. no inspection done.
|
Issue PAID IN FULL permit | | | 12/10/2012 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 12/10/2012 | | DONE |
Barbara Stitt
|
|
|
|
Case Summary (BLD) | | | 12/3/2012 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 10/17/2012 | 10/17/2012 | 11/30/2012 | | PASS |
Dan Stuart
|
|
|
|
Routing - PLAN CHECK | 11/5/2012 | | 11/30/2012 | | PASS |
Dan Stuart
|
|
|
|
Plan resubmittals received | | | 11/29/2012 | | DONE |
Dan Stuart
|
|
|
|
Routing - PLAN CHECK | 10/18/2012 | | 11/2/2012 | | FAIL |
Dan Stuart
|
|
|
Engineering design data needs to be provided on full size carport plan sheet with updates to site plan and detail 3 & 4/A0.2 of original plans.
|
Plan resubmittals requested | | | 11/2/2012 | | DONE |
|
|
|
Copy of reviewed plans back to architect.
|
Plan Modification Accepted | | | 10/17/2012 | | DONE |
Tisha Gallop
|
|
|
started plan mod workflow for deferred submittals for engineering of carports.
|
Plan resubmittals received | | | 10/16/2012 | | DONE |
Tisha Gallop
|
|
|
received two paper copies of carport engineering; taken to Dan Stuart.
|
Extend Review Timeline | | | 9/14/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (DRS) | 4/12/2012 | 4/12/2012 | 6/28/2012 | | PASS |
Dan Stuart
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2012 | | PASS |
|
|
|
Deferred submittal engineering.
|
Permit Ready to Issue | | | 6/28/2012 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Design Review | 5/24/2012 | | 5/31/2012 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLAN CHECK | 5/24/2012 | | 5/31/2012 | | PASS |
Dan Stuart
|
|
|
Approved as deferred submittal as allowed by code. NO WORK shall be performed for these carports until plans have been submitted and approved by architect, structural engineer and all involved agencies.
|
Routing - PLAN CHECK | 4/12/2012 | | 5/17/2012 | | FAIL |
Dan Stuart
|
|
|
Resubmittals required. See plan review attached to BLD12-00678, Bldg #5 applicable to all buildings in this project.
|
1st review completed | | | 5/17/2012 | | FAIL |
Dan Stuart
|
|
|
|
Routing - Erosion and Sediment | 4/12/2012 | | 4/19/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00291 plan approved with conditions attached to the peermit.
|
Routing - Design Review | 4/12/2012 | | 4/18/2012 | | FAIL |
Josh Wilson
|
|
|
Design Review and CUP modification required.
|
Route to Impact Fee Review | 4/12/2012 | 4/17/2012 | 4/17/2012 | | PASS |
Shauna Surgeon
|
|
|
|
Routing - Addressing | 4/16/2012 | | 4/16/2012 | | PASS |
Terry Records
|
|
|
|
Routing - FIRE | 4/12/2012 | | 4/16/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - PLANNING | 4/12/2012 | | 4/13/2012 | | PASS |
Susan Riggs
|
|
|
|
Routing - PLANNING Land Div | 4/12/2012 | | 4/13/2012 | | PASS |
Dave Abo
|
|
|
Lot 7 of Union Square Subdivision No. 2
|
Routing - PUBLIC WORKS | 4/12/2012 | | 4/13/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Intake Approval | | | 4/10/2012 | | PASS |
Dan Stuart
|
|
|
|
Application received | | | 3/29/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 29 2012 1:47PM
|