Third Notice | | 6/10/2014 | 6/10/2014 | | DONE |
|
|
|
This permit finaled on the web by Mike McHargue
|
Second Notice | | 5/4/2014 | 6/5/2014 | | DONE |
|
|
|
e-mailed to John Laude and Mike McHargue at Trilogy Dev.
|
First Notice | | 4/12/2014 | 4/24/2014 | | DONE |
|
|
|
mailed
|
Permanent Occupancy | | | 4/2/2014 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 8/13/2013 | 8/13/2013 | 8/13/2013 | P | PASS |
Mike Jordan
|
|
|
Carports Phone #: ###-#### >> Inspection requested via web by Mike McHargue
|
FIRE-Final Inspection | 8/12/2013 | 8/12/2013 | 8/13/2013 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Footing | 4/8/2013 | 4/9/2013 | 4/9/2013 | A | PASS |
Mike Jordan
|
|
|
michael Phone #: ###-####
|
BLD-Footing | 3/14/2013 | 3/15/2013 | 3/15/2013 | A | PASS |
Mike Jordan
|
|
|
Michael Phone #: ###-####
|
BLD-Footing | 3/14/2013 | 3/14/2013 | 3/14/2013 | P | NR |
Mike Jordan
|
|
|
Michael Phone #: ###-####. Needs to provide the approved plans. No concrete at this time.
|
FIRE-Final Inspection | 1/30/2013 | 1/31/2013 | 1/31/2013 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy is being given with scott arellano's permission until the project related fire alarm has been completed with plan modifications. Building inspector to please verifiy breeze way doors close for fire rated assembly. This work was not yet complete.
|
Issue PAID IN FULL permit | | | 12/10/2012 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 12/10/2012 | | DONE |
Barbara Stitt
|
|
|
|
Case Summary (BLD) | | | 12/3/2012 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 10/17/2012 | 10/17/2012 | 11/30/2012 | | PASS |
Dan Stuart
|
|
|
|
Routing - PLAN CHECK | 11/5/2012 | | 11/30/2012 | | PASS |
Dan Stuart
|
|
|
|
Plan resubmittals received | | | 11/29/2012 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 11/5/2012 | | DONE |
Dan Stuart
|
|
|
|
Routing - PLAN CHECK | 10/18/2012 | | 11/5/2012 | | FAIL |
Dan Stuart
|
|
|
Resubmittals required. Report attached to ePlan review, documents and drawings
|
Plan Modification Accepted | | | 10/17/2012 | | DONE |
Tisha Gallop
|
|
|
started plan mod workflow for deferred submittals for engineering of carports.
|
Plan resubmittals received | | | 10/16/2012 | | DONE |
Tisha Gallop
|
|
|
received two paper copies of carport engineering; taken to Dan Stuart.
|
Extend Review Timeline | | | 9/14/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (DRS) | 4/12/2012 | 4/12/2012 | 6/28/2012 | | PASS |
Dan Stuart
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2012 | | PASS |
|
|
|
Deferred submittal
|
Permit Ready to Issue | | | 6/28/2012 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Design Review | 5/24/2012 | | 5/31/2012 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLAN CHECK | 5/24/2012 | | 5/31/2012 | | PASS |
Dan Stuart
|
|
|
Approved as deferred submittal as allowed by code. NO WORK shall be performed for these carports until plans have been submitted and approved by architect, structural engineer and all involved agencies.
|
Plan resubmittals received | | | 5/24/2012 | | DONE |
Dan Stuart
|
|
|
Declared as deferred submittal as allowed by code. NO WORK shall be performed for these carports until plans have been submitted and approved by architect, structural engineer and all involved agencies.
|
Routing - PLAN CHECK | 4/12/2012 | | 5/17/2012 | | FAIL |
Dan Stuart
|
|
|
Resubmittals required. See BLD12-00678 for plan review comments applicable to all buildings for this project.
|
1st review completed | | | 5/17/2012 | | FAIL |
Dan Stuart
|
|
|
|
Routing - Erosion and Sediment | 4/12/2012 | | 4/19/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00293 plan approved with conditions attached to the permit.
|
Routing PW Drainage | 4/12/2012 | | 4/18/2012 | | PASS |
Brian Murphy
|
|
|
|
Routing - Design Review | 4/12/2012 | | 4/18/2012 | | FAIL |
Josh Wilson
|
|
|
Design Review and CUP modification required.
|
Route to Impact Fee Review | 4/12/2012 | 4/17/2012 | 4/17/2012 | | PASS |
Shauna Surgeon
|
|
|
|
Routing - FIRE | 4/12/2012 | | 4/16/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - Addressing | 4/12/2012 | | 4/16/2012 | | PASS |
Terry Records
|
|
|
|
Routing - PLANNING | 4/12/2012 | | 4/13/2012 | | PASS |
Susan Riggs
|
|
|
|
Routing - PLANNING Land Div | 4/12/2012 | | 4/13/2012 | | PASS |
Dave Abo
|
|
|
Lot 7 of Union Square Subdivision No. 2
|
Routing - PUBLIC WORKS | 4/12/2012 | | 4/12/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Intake Approval | | | 4/10/2012 | | PASS |
Dan Stuart
|
|
|
|
Application received | | | 3/29/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 29 2012 1:48PM
|