First Notice | | 8/9/2012 | 8/24/2012 | | DONE |
|
|
|
faxed
|
Permanent Occupancy | | | 7/30/2012 | | DONE |
|
|
|
|
Permanent Occupancy | | | 7/30/2012 | | DONE |
|
|
|
|
Permanent Occupancy | | | 7/30/2012 | | DONE |
|
|
|
|
Temporary Occupancy | 7/23/2012 | 10/21/2012 | 7/23/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Zoning Approval | 7/18/2012 | 7/18/2012 | 7/18/2012 | | DONE |
Andrea Tuning
|
|
|
|
PubWorks Occupancy Approval | 7/11/2012 | 7/11/2012 | 7/11/2012 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 7/10/2012 | 7/10/2012 | 7/10/2012 | P | PART |
Tony Young
|
|
|
Derek Phone #: ###-####,, ok pending others,, zoning,, and plumbing if required
|
FIRE-Final Inspection | 7/9/2012 | 7/9/2012 | 7/9/2012 | P | PASS |
Forrest France
|
|
|
Items on correction notice verified for completion. Fire life safety finaled.
|
FIRE-Conference | 7/2/2012 | 7/2/2012 | 7/2/2012 | A | DONE |
Forrest France
|
|
|
Regarding existing partial overhead fire sprinkler system.
|
BLD-Final | 6/28/2012 | 6/29/2012 | 7/2/2012 | P | NR |
Jim Storey
|
|
|
Derrick Phone #: ###-####
|
FIRE-Final Inspection | 6/28/2012 | 6/29/2012 | 6/29/2012 | A | FAIL |
Forrest France
|
|
|
Correction items include door hardware, exit signs and EM lights, fire extinguishers to be installed, the existing limited area fire sprinkler system needs inspected or a permit issued to demo if non-required.
|
BLD-Framing/Rough-in | 6/15/2012 | 6/15/2012 | 6/15/2012 | P | PASS |
Jim Storey
|
|
|
call for lock box code//Derrick Phone #: ###-####
|
Issue PAID IN FULL permit | | | 6/13/2012 | | DONE |
|
|
|
|
OVERRIDE | | | 6/12/2012 | | |
|
|
|
|
Routing - PLAN CHECK | 6/1/2012 | | 6/12/2012 | | PASS |
Tim L. Woodard
|
|
|
Approved with redlines. TLW
|
1st review completed | | | 6/12/2012 | | DONE |
Tim L. Woodard
|
|
|
Approved as redlined. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/12/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 6/12/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 6/12/2012 | | DONE |
|
|
|
|
Telephone call | | | 6/12/2012 | | DONE |
|
|
|
spoke with derek - permit ready fees given
|
Permit Ready to Issue | | | 6/12/2012 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 5/25/2012 | | 6/12/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PUBLIC WORKS | 5/30/2012 | | 6/1/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 5/30/2012 | | 6/1/2012 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Rating | 5/29/2012 | | 6/1/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 5/29/2012 | | 5/30/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00521 plan waiver approved with additional conditions attached to the permit.
|
Routing - PLAN CHECK | 5/30/2012 | | 5/30/2012 | | PEND |
Tim L. Woodard
|
|
|
Sent back to PW for grading re-review. TLW
|
Plan resubmittals received | | | 5/30/2012 | | DONE |
|
|
|
Rec'd three copies of drainage report and calcs - taken to Tim W
|
Routing - PUBLIC WORKS | 5/25/2012 | | 5/29/2012 | | FAIL |
Connie Baumgartner
|
|
|
Failed by Public Works, grading and drainage application is required. Contact Brian Murphy at ###-####.
|
Routing PW Sewer Rating | 5/25/2012 | | 5/29/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 3/30/2012 | 5/25/2012 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/25/2012 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/25/2012 | | DONE |
|
|
|
|