Permanent Occupancy | | | 6/21/2012 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 6/12/2012 | 6/14/2012 | 6/14/2012 | P | PASS |
Jim Sly
|
|
|
nichole after 2 pm if possible Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 6/12/2012 | 6/14/2012 | 6/14/2012 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 4/18/2012 | 4/19/2012 | 4/20/2012 | P | CANC |
Jim Sly
|
|
|
Nicole Phone #: ###-#### Need fire final,
|
FIRE-Final Inspection | 4/18/2012 | 4/19/2012 | 4/19/2012 | A | FAIL |
Troy Cobbley
|
|
|
Repair the exit signs. Provide annual inspection for the fire extinguishers. Remove the thumbturn dead bolt at the main exit (keyed is ok). Remove the thumbturn dead bolts on the other two exit doors.
|
Issue PAID IN FULL permit | | | 4/18/2012 | | DONE |
Tisha Gallop
|
|
|
|
Print Occupancy Form | | | 4/12/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/12/2012 | | |
|
|
|
|
Telephone call | | | 4/12/2012 | | |
|
|
|
4-12-12 called Wade permit ready for pick up ///dld
|
Plan assigned to (TLW) | 4/6/2012 | | 4/11/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 4/6/2012 | | 4/11/2012 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 4/11/2012 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/11/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 4/11/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 4/11/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | 4/6/2012 | 4/6/2012 | | DONE |
Christina Prado
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/6/2012 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/6/2012 | | DONE |
Christina Prado
|
|
|
|
First Notice | | 7/1/2012 | | | |
|
|
|
|