Print Statement | | | 6/4/2013 | | DONE |
Tisha Gallop
|
|
|
e-mailed to Janis at Schuerman Homes.
|
Third Notice | | 3/30/2013 | 4/24/2013 | | DONE |
|
|
|
mailed with letter
|
Third Follow up | | | 4/24/2013 | | |
|
|
|
|
Third Notice | | 2/3/2013 | 3/25/2013 | | DONE |
|
|
|
mailed
|
Second Notice | | 12/14/2012 | 1/29/2013 | | DONE |
|
|
|
didnt sent, waiting for TI to be done
|
First Notice | 11/14/2012 | 11/14/2012 | 12/4/2012 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 11/14/2012 | 11/14/2012 | 11/14/2012 | P | PASS |
Jim Sly
|
|
|
David Phone #: ###-####
|
DOC - Permit Finaled | 11/14/2012 | 11/14/2012 | 11/14/2012 | P | PASS |
Jim Sly
|
|
|
|
Override - Parcel Holds | 11/14/2012 | 1/1/1900 | 11/14/2012 | | |
|
|
|
Shell only
|
BLD-Final | 9/25/2012 | 9/26/2012 | 9/26/2012 | P | PART |
Jim Sly
|
|
|
dave Phone #: ###-#### OK for Temp Occ C/N Waiting for some fixes for Select connections on rough sawn framing of Ext. patios and entrys. Eng. to provide stamped paperwork and calcs. Can final when framing insp and passed.
|
FIRE-Final Inspection | 9/19/2012 | 9/19/2012 | 9/19/2012 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 9/11/2012 | 9/11/2012 | 9/11/2012 | P | FAIL |
Troy Cobbley
|
|
|
Need the project related fire alarm and fire sprinkler permits addressed. Need the signage on the riser room door and the knox box mounted.
|
Zoning Approval | 8/22/2012 | 8/22/2012 | 8/22/2012 | | PASS |
Josh Wilson
|
|
|
Ok. No occupancy under this permit. JGW 8-22-12
|
BLD-Conference | 8/16/2012 | 8/16/2012 | 8/16/2012 | P | DONE |
Jim Sly
|
|
|
dave Phone #: ###-#### Gave dave a list of required finals for Shell Core permit.
|
FIRE-Final Inspection | 8/16/2012 | 8/17/2012 | 8/16/2012 | A | CANC |
Troy Cobbley
|
|
|
Cancel per conversation with dave. To be rescheduled for next tueday.
|
BLD-Other | 7/27/2012 | 7/27/2012 | 7/27/2012 | P | DONE |
Jim Sly
|
|
|
Correction Notice Posted. Exterior heavy timber construction, not per approved plan. Re-submit revised plan, Engineering calcs etc. for approval. Do not proceed with any work beyond scope of work on cold shell building permit. Do not cover any interior walls prior to obtaining permits for tenant improvements and approvals from structural inspector.
|
BLD-Other | 7/26/2012 | 7/27/2012 | 7/27/2012 | A | CANC |
Jim Sly
|
|
|
Dave Phone #: ###-####
|
BLD-Energy code compliance | 6/4/2012 | 6/4/2012 | 6/4/2012 | P | PART |
Jim Sly
|
|
|
dave Phone #: ###-#### Brewery only.......OK
|
BLD-Framing/Rough-in | 6/1/2012 | 6/1/2012 | 6/4/2012 | P | PASS |
Jim Sly
|
|
|
Dave phone
|
BLD-Framing/Rough-in | 5/31/2012 | 5/31/2012 | 6/1/2012 | P | CANC |
Jim Sly
|
|
|
Dave Phone #: ###-#### Re-sched.....
|
BLD-Framing/Rough-in | 5/29/2012 | 5/29/2012 | 5/29/2012 | P | PART |
Jim Sly
|
|
|
dave Phone #: ###-#### Shear OK South wall only.
|
BLD-Framing/Rough-in | 5/24/2012 | 5/24/2012 | 5/24/2012 | P | PART |
Jim Sly
|
|
|
Shear inspection please--Dave Phone #: ###-#### West wall......OK.
|
BLD-Foundation | 5/22/2012 | 5/23/2012 | 5/23/2012 | A | PASS |
Jim Sly
|
|
|
###-#### Dave phone
|
BLD-Footing | 5/22/2012 | 5/22/2012 | 5/22/2012 | P | CANC |
Jim Sly
|
|
|
dave Phone #: ###-#### Re-sched......
|
BLD-Framing/Rough-in | 5/21/2012 | 5/21/2012 | 5/21/2012 | P | CANC |
Jim Sly
|
|
|
Dave Phone #: ###-####
|
BLD-Wall Bracing | 5/21/2012 | 5/21/2012 | 5/21/2012 | P | PART |
Jim Sly
|
|
|
Dave Phone #: ###-#### Nailing of Exterior. North Wall only......OK.
|
Issue PAID IN FULL permit | | | 5/18/2012 | | DONE |
Christina Prado
|
|
|
|
Route to Impact Fee Review | 5/11/2012 | 5/16/2012 | 5/14/2012 | | PASS |
Shauna Surgeon
|
|
|
|
Routing - FIRE | 5/11/2012 | 5/11/2012 | 5/14/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Plan assigned to (JCM) | 4/9/2012 | | 5/14/2012 | | PASS |
John Menard
|
|
|
|
1st review completed | | | 5/14/2012 | | FAIL |
|
|
|
Failed Structural
|
Routing - PLAN CHECK | 5/14/2012 | | 5/14/2012 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/14/2012 | | DONE |
John Menard
|
|
|
|
Inspection Record Card- Bld | | | 5/14/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/14/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 5/14/2012 | | DONE |
Tisha Gallop
|
|
|
called Matter Architects and left vm permit is ready, fees and need ACHD
|
Routing - PLAN CHECK | 5/3/2012 | | 5/11/2012 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 5/3/2012 | | 5/11/2012 | | PASS |
John Menard
|
|
|
|
Routing - Design Review | 5/3/2012 | | 5/3/2012 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 4/16/2012 | | 5/3/2012 | | |
John Menard
|
|
|
|
Plan Reviewer's activity | | | 4/20/2012 | | PASS |
John Menard
|
|
|
Reviewed and approved structural revisions. JCM
|
Plan resubmittals received | | | 4/19/2012 | | DONE |
Christina Prado
|
|
|
Received three sets of plans marked S2.0 and new structural calcs. Also received one sets of letter addressed to John and one copy of letter John sent architect. 2 sets of plans inserted by arch rep. The third given to John for review
|
Plan resubmittals received | | | 4/18/2012 | | DONE |
Tisha Gallop
|
|
|
received response to Andrea Tuning and four copies of plan sheet L1; inserted by permit tech. and taken back to John Menard.
|
Plan resubmittals requested | | | 4/16/2012 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the structural review requesting revisions. JCM
|
Routing - PLANNING | 4/13/2012 | | 4/16/2012 | | FAIL |
Andrea Tuning
|
|
|
The applicant will be required to include a site plan and landscape plan with this building set. This is to ensure that all of the landscaping is insalled with the vanilla shell.
I spoke to the applicant on 4-16-12 and he will be bringing in the landscape plan to include in the building plan set.
|
Routing - Erosion and Sediment | 4/10/2012 | | 4/13/2012 | | PASS |
Clint A Smith
|
|
|
Please Refer to ESC11-00833.
|
Routing - PLUMBING | 4/13/2012 | | 4/13/2012 | | PASS |
Daryl Spivey
|
|
|
Per plans and 2003 UPC.
|
Routing Off Site - STRUCTURAL | 4/9/2012 | | 4/12/2012 | | FAIL |
John Menard
|
|
|
Received comment list from consulting structural engineer requesting revisions. JCM
|
Routing - Addressing | 4/10/2012 | | 4/10/2012 | | PASS |
April Wing
|
|
|
|
Routing PW Sewer Rating | 4/10/2012 | | 4/10/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 4/9/2012 | | 4/10/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING Land Div | 4/9/2012 | | 4/9/2012 | | PASS |
Dave Abo
|
|
|
Parcel "C" of Record of Survey 8894.
|
Pending Assignment by JCM | 4/9/2012 | | 4/9/2012 | | DONE |
John Menard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/9/2012 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/9/2012 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 4/9/2012 | | PASS |
John Menard
|
|
|
|
Application received | | 4/6/2012 | | | |
|
|
|
|