Third Notice | | 12/7/2014 | 12/23/2014 | | DONE |
|
|
|
This permit finaled on the web by Jody Wilson
|
Second Notice | | 10/16/2014 | 12/2/2014 | | DONE |
|
|
|
|
First Notice | | 8/23/2014 | 10/6/2014 | | DONE |
|
|
|
mailed 2nd notice 12-2-14 CAN
|
BLD-Final | 8/12/2014 | 8/13/2014 | 8/13/2014 | A | PASS |
Jim Storey
|
|
|
herb Phone #: ###-####
|
Permanent Occupancy | | | 8/13/2014 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 8/11/2014 | 8/12/2014 | 8/12/2014 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Zoning Approval | 8/12/2014 | 8/12/2014 | 8/12/2014 | | PASS |
Josh Wilson
|
|
|
|
BLD-Framing/Rough-in | 4/8/2014 | 4/9/2014 | 4/9/2014 | A | PASS |
Tom Arcoraci
|
|
|
julio Phone #: ###-####
|
FIRE-Final Inspection | 3/24/2014 | 3/24/2014 | 3/24/2014 | P | PART |
Troy Cobbley
|
|
|
Life safety passed for the new Customer Louge Area.
|
FIRE-Final Inspection | 3/20/2014 | 3/24/2014 | 3/24/2014 | A | FAIL |
Troy Cobbley
|
|
|
The power was cut/off and no exit signs/emergency lights were working. Electrician was working on it.
|
BLD-Wall cover | 3/19/2014 | 3/19/2014 | 3/19/2014 | P | PASS |
Tom Arcoraci
|
|
|
phase 2 bath room ok
|
BLD-Final | 3/19/2014 | 3/19/2014 | 3/19/2014 | A | PASS |
Tom Arcoraci
|
|
|
phase 1 customer louge and bath rooms ok for use
|
FIRE-Final Inspection | 7/12/2013 | 7/12/2013 | 7/12/2013 | P | FAIL |
Troy Cobbley
|
|
|
Todays inspection was just for the customer lounge area. To occupy this area the exit discharge light over the west door needs to be repaired. When this is repaired life safety will be passed in this area only.
|
FIRE-Final Inspection | 6/26/2013 | 6/27/2013 | 6/27/2013 | A | FAIL |
Troy Cobbley
|
|
|
JULIO and I actually had a conference and discussed life safety requirements. I noted that only the main exit door is allowed to have keyed hardware where-as many of the interior doors are aluminum store front type with keyed hardware. We also discussed fire extinguisher plancement and the location of the address numbers.
|
BLD-Ceiling Grid Inspection | 5/9/2013 | 5/10/2013 | 5/10/2013 | P | PASS |
Tom Arcoraci
|
|
|
JULIO Phone #: ###-####
|
BLD-Framing/Rough-in | 4/22/2013 | 4/23/2013 | 4/23/2013 | A | PART |
Tom Arcoraci
|
|
|
Julio Phone #: ###-#### service and bathrooms ok
|
CHANGE STATUS TO (ISS) | | | 2/27/2013 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/27/2013 | | DONE |
|
|
|
|
Routing - PLANNING | 2/11/2013 | | 2/26/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 2/26/2013 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 2/26/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 2/26/2013 | | DONE |
Christina Prado
|
|
|
called Clinton to advise permit is ready and gave fees due
|
Plan assigned to (TLW) | 2/7/2013 | | 2/26/2013 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - Addressing | 2/8/2013 | | 2/11/2013 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 2/8/2013 | | 2/11/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 2/11/2013 | | 2/11/2013 | | PASS |
Connie Baumgartner
|
|
|
|
Plan Modification Accepted | | | 2/7/2013 | | |
|
|
|
Plan modification accepted for BLD12-00800 - Enlarged the customer lounge area to incorporate two restrooms, revised sheets A1.0,A1.1,A2.1,A9.1,S3.1,M1.0,M2.0,M3.0,P1.0,P2.0,E0.0,E1.0,E1.1,E1.2 routed to Tim W for review.
|
Issue PAID IN FULL permit | | | 10/9/2012 | | DONE |
Barbara Stitt
|
|
|
|
Extend Review Timeline | | | 9/20/2012 | | DONE |
Christina Prado
|
|
|
|
Expiration Notice | 9/19/2012 | 10/10/2012 | 9/19/2012 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 5/21/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
talk to Clinton - permit ready, fees given, need gc
|
Permit Ready to Issue | | | 5/21/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/18/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 5/18/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 5/18/2012 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/26/2012 | | 5/18/2012 | | PASS |
Tim L. Woodard
|
|
|
Approved with corrections from architect. TLW
|
Plan assigned to (TLW) | | | 5/18/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Plan resubmittals received | | | 5/14/2012 | | DONE |
Christina Prado
|
|
|
Received two sets of plans marked SD1.1, A1.1 & A5.1 as well as one response letter; one letter from Stapley Engineering and one sheet of structural calcs. Plans and documents given to Tim for further review
|
1st review completed | | | 4/26/2012 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLANNING | 4/26/2012 | | 4/26/2012 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLAN CHECK | 4/12/2012 | | 4/26/2012 | | FAIL |
Tim L. Woodard
|
|
|
Refer to plan review report attached to case. TLW
|
Routing - PUBLIC WORKS | 4/11/2012 | | 4/12/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 4/11/2012 | | 4/12/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 4/11/2012 | 4/11/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/11/2012 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 4/11/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/11/2012 | | DONE |
Christina Prado
|
|
|
|
Routing - Addressing | 4/11/2012 | | 4/11/2012 | | PASS |
Terry Records
|
|
|
|