Third Notice | | 7/14/2014 | 7/15/2014 | | DONE |
|
|
|
This permit finaled on the web by Jody Wilson
|
Third Notice | | 6/14/2014 | 7/9/2014 | | DONE |
|
|
|
mailed to K2
|
Third Notice | | 5/11/2014 | 6/9/2014 | | DONE |
|
|
|
mailed to K2 Const.
|
Second Notice | | 4/10/2014 | 5/6/2014 | | DONE |
|
|
|
Faxed 5-6-14
|
First Notice | | 3/30/2014 | 3/31/2014 | | DONE |
Christina Prado
|
|
|
mailed 4-1-14
|
Permanent Occupancy | | | 3/20/2014 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 3/17/2014 | 3/19/2014 | 3/19/2014 | A | PASS |
Tom Arcoraci
|
|
|
julio Phone #: ###-#### ok for perm occ
|
Telephone call | | | 3/12/2014 | | DONE |
|
|
|
Spoke with Jody from K-2 and they should be done by expiration date//3-12-14 @ 9:15am
|
Change Expiration Date Only | | | 2/24/2014 | | DONE |
Tisha Gallop
|
|
|
30 day extension for temp occ approved by JCB. New expiration date for temp is 3/21/14, see attached document
|
BLD-Aging Inspection | 1/31/2014 | 1/31/2014 | 1/31/2014 | | PEND |
Tom Arcoraci
|
|
|
|
Plan Reviewer's activity | | | 1/7/2014 | | DONE |
|
|
|
Structural design for the new entry element arch approved, including the footing.
|
Plan resubmittals received | | | 1/3/2014 | | DONE |
Christina Prado
|
|
|
Received two sets of Deferred submitals. Two sets of plans marked A1.0, A2.0, S1 & S2 as well as two sets of structural calcs were submitted;Plans and calcs taken to carl Westfall for review and approval
|
Temporary Occupancy | 11/21/2013 | 2/19/2014 | 11/20/2013 | | DONE |
Barbara Stitt
|
|
|
90 day extension given per Jason Blais-see scanned documents///BAS 11-20-13
|
BLD-Aging Inspection | 11/11/2013 | 11/11/2013 | 11/12/2013 | | PEND |
Tom Arcoraci
|
|
|
temp
|
BLD-Aging Inspection | 9/11/2013 | 9/11/2013 | 9/13/2013 | | PEND |
Tom Arcoraci
|
|
|
|
Temporary Occupancy | 8/22/2013 | 11/20/2013 | 8/22/2013 | | DONE |
Christina Prado
|
|
|
|
Zoning Approval | 8/22/2013 | 8/22/2013 | 8/22/2013 | | PASS |
Josh Wilson
|
|
|
|
BLD-Final | 7/11/2013 | 7/12/2013 | 7/12/2013 | P | PART |
Tom Arcoraci
|
|
|
Julio Phone #: ###-#### Pending ELE sign off
|
FIRE-Final Inspection | 7/11/2013 | 7/12/2013 | 7/12/2013 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Contractor to remove the thumbturn on the main exit prior to the building inspection.
|
Extend Permit 90/180 days | 7/12/2013 | 7/12/2013 | 7/12/2013 | A | PASS |
Tom Arcoraci
|
|
|
Julio Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 7/11/2013 | | DONE |
Tisha Gallop
|
|
|
change status back to ISS per when routed to Plan Review for deferred submittals permit went to REV.
|
Routing - PLAN CHECK | 5/1/2013 | | 5/6/2013 | | FAIL |
Carl Westfall
|
|
|
Defered structural design for the entry "tower" were submitted. They were not stamped by an Idaho licensed engineer and the footing design did not match that approved already.
|
Telephone call | | | 5/6/2013 | | DONE |
|
|
|
Called Clinton Yaka and told him that the deferred review failed. Need a design stamped by an Idaho licensed engineer and need a compatible footing design.
|
Plan resubmittals received | | | 5/1/2013 | | DONE |
Tisha Gallop
|
|
|
received two copies of deferred submittal for tower design calcs; taken to Carl Westfall.
|
BLD-Framing/Rough-in | 3/18/2013 | 3/19/2013 | 3/19/2013 | P | PASS |
Tom Arcoraci
|
|
|
julio Phone #: ###-####
|
BLD-Framing/Rough-in | 3/4/2013 | 3/5/2013 | 3/5/2013 | P | PASS |
Tom Arcoraci
|
|
|
Julio Phone #: ###-####
|
OVERRIDE | | | 5/9/2012 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/9/2012 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 5/9/2012 | | DONE |
|
|
|
|
Telephone call | | | 5/9/2012 | | DONE |
Christina Prado
|
|
|
called and left Clinton message giving fees due and advising GC is required
|
Permit Ready to Issue | | | 5/9/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CJW) | 4/13/2012 | 4/13/2012 | 5/8/2012 | | PASS |
Carl Westfall
|
|
|
DENNIS DILLON SHOWROOM (20 days - May 8)
|
Routing - PLAN CHECK | 5/7/2012 | | 5/8/2012 | | PASS |
Carl Westfall
|
|
|
Drawings approved, with "red lines" after the resubmittal review.
|
Plan resubmittals received | | | 5/8/2012 | | DONE |
Christina Prado
|
|
|
Received two sets of plans marked G1.1, A1.1, A3.1, 4.1 & A9.1 as well as one transmittal sheet. Plans given to Carl Westfall for further review
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/8/2012 | | DONE |
|
|
|
|
Routing - FIRE | 5/3/2012 | 5/3/2012 | 5/7/2012 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 5/7/2012 | | FAIL |
|
|
|
Failed Plan Check
|
Route to Impact Fee Review | 5/3/2012 | 5/8/2012 | 5/3/2012 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 4/17/2012 | | 5/3/2012 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on May 1 and finished on May 2. Revised drawings were required. See the plan review report.
|
Routing - Erosion and Sediment | 4/16/2012 | | 4/17/2012 | | PASS |
Clint A Smith
|
|
|
ESC12-00344 plan waiver approved with additional conditions attached to the permit.
|
Routing - Design Review | 4/17/2012 | | 4/17/2012 | | PASS |
Josh Wilson
|
|
|
Josh Wilson - DRH12-00025
|
Routing - PLANNING | 4/17/2012 | | 4/17/2012 | | |
|
|
|
Josh W.
|
Routing PW Sewer Rating | 4/16/2012 | | 4/16/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 4/13/2012 | | 4/16/2012 | | PASS |
Terry Records
|
|
|
|
Routing - PUBLIC WORKS | 4/16/2012 | | 4/16/2012 | | PASS |
Connie Baumgartner
|
|
|
|
Pending Assignment by JCB | 4/11/2012 | | 4/13/2012 | | DONE |
Jason Blais
|
|
|
|
Application received | | 4/11/2012 | 4/11/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/11/2012 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 4/11/2012 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/11/2012 | | DONE |
Christina Prado
|
|
|
|