Permit Information
Permit NumberBLD12-00811
StatusFinaled
Name WEBSTER CONSTRUCTION
Site Address 64 N COLE RD
Project NameIdaho Aquarium
Customer Number 
ePlanReviewNo
Description
(IDAHO PUBLIC AQUARIUM - TENANT COMPLETION) The fire sprinkler system is used for building area increase and for fire area. To complete areas with in an existing 9,264 square foot tenant space that is being used as a public aquarium. The first permit for the Idaho Public Aquarium was BLD11-01835. The use of this tenant space is for exhibit tours. A total of about 4,481 square feet of floor area is available for this use. The occupant load of this floor area is 252. The B Occupant load is 2 and the S-1 Occupant load is 4. Work includes site built aquariums, interior nonbearing walls, and finishes. In addition, a new exterior exit door in a concrete tilt-up panel, a new exterior landing at the door, and a new wood ramp will be constructed. A new steel header and steel jambs with Titen anchors and welding will be provided at the new exterior doorway. A 1,161 square foot area intended for a future deep aquarium is not approved for occupancy and is required to be barricaded to discourage occupancy. Site built aquariums are required to comply with the Structural Engineer’s design. Structural calculations were provided for aquariums having a water depth of 36 inches and for aquariums having a water depth of 60 inches. The analysis includes the design of the structural support for glass observation panels in the aquarium walls. Glass observation panels are required to be designed to resist the water pressure in accordance with nationally recognized standards. A copy of the structural design for the glass is required to be provided to the Structural Inspector. Aquarium walls will be constructed of solid grouted masonry with #4 rebar 8 inches on center each way. Vertical rebar will be anchored at least 4 inches into the existing concrete floor with epoxy. Joints and slab cracks running parallel to the aquarium walls are not allowed be located closer than 24 inches or 28 inches to the aquarium walls, depending on the depth of the water. Special inspection is required for epoxy anchors, Titen anchors, welding, and masonry. Precautions shall be taken to prevent children from falling into the aquariums. If guards are not provided, sufficient adult supervision is required at all times when children are present. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 2/8/20143/5/2014 DONE
per Rita ok to sign off. Unable to obtain accurate values per not able to contact owner and GC was not involved in alot of this project.
Third Notice 12/29/20132/3/2014 DONE
mailed to Webster Const
Second Notice 11/9/201312/24/2013 DONE
DetailsChristina Prado
mailed 12-26-13
First Notice 10/19/201310/30/2013 DONE
10-30-13-faxed
BLD-Final10/9/201310/9/201310/9/2013APASS
DetailsTom Arcoraci
Per Bob's request please doc final
DOC - Permit Finaled10/9/201310/9/201310/9/2013PPASS
DetailsTom Arcoraci
Permanent Occupancy  10/9/2013 DONE
DetailsBarbara Stitt
BLD-Conference10/2/201310/2/201310/2/2013PPART
DetailsBob Archibald
Walk through with electrical on outstanding issues remaining prior to issuance of a Final inspection/CO. Electrical corrections required and future space identified on plans will have electrical work added to current electrical permit foradjacent tenant expansion.
FIRE-Final Inspection9/26/20139/27/20139/27/2013APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection9/25/20139/25/20139/25/2013PFAIL
DetailsTroy Cobbley
Provide single action hardware on the pump room doors and provide annual inspections for all of the fire extinguishers. Front door meets requirements for locking hardware though panic is shown. The rear combustible ramp is under 4' in width so it meets the non-sprinkler exception. Exit signs and emergency lights functioned correctly.
Case Summary (BLD)  9/25/2013 DONE
BLD-Conference9/23/20139/23/20139/23/2013PPASS
DetailsTom Arcoraci
Print Occupancy Form  8/8/2013 DONE
BLD-Conference8/5/20138/5/20138/5/2013PPART
DetailsTom Arcoraci
meet with bob at site needs to return handrails then ok for final when all others have signed
BLD-Conference6/6/20136/6/20136/7/2013PPASS
DetailsTom Arcoraci
ramp near completion
BLD-Conference6/5/20136/6/20136/6/2013ACANC
DetailsTom Arcoraci
BLD-Conference6/5/20136/5/20136/6/2013PCANC
DetailsTom Arcoraci
Check status of project, no call for inspections.
BLD-Other4/15/20134/15/20134/15/2013PPART
DetailsTom Arcoraci
Verified ADA ramp slope is less then 1:12
BLD-Footing3/25/20133/26/20133/26/2013APASS
DetailsTom Arcoraci
Amanda Phone #: ###-####
(F) Reprint permit  3/25/2013 DONE
DetailsTisha Gallop
Print Occupancy Form  3/25/2013 DONE
DetailsTisha Gallop
Meeting  3/25/2013 DONE
DetailsTisha Gallop
Transfered permit to new GC, Webster Construction.
MISC ACTIONS  3/8/2013 DONE
DetailsChristina Prado
Per attached letter - Todd Campbell contruction will no longer be swerving as General Contractor for this project. The new contractor awarded must pay $46.31 to transfer the BLD over and fill out new GC form as well as $52.50 to transfer the Rp over.
BLD-Conference3/5/20133/5/20133/5/2013APEND
DetailsTom Arcoraci
No work in progress. New contractor "John" is oredering materials and preparing for wall cut of new door opening. Work scheduled to begin ~2 weeks.
BLD-Conference12/14/201212/14/201212/14/2012PPEND
DetailsTom Arcoraci
No work in progress. Requested schedule on work from Chris as work was to be completed prior to this date per letter from Jenifer.
Override - Parcel Holds  12/14/2012  
Override - Parcel Holds  12/14/2012  
OVERRIDE  11/14/2012  
OVERRIDE  11/14/2012  
OVERRIDE  11/14/2012  
OVERRIDE  11/14/2012  
Plan assigned to (CJW)4/24/20124/24/201211/14/2012 PASS
DetailsCarl Westfall
BOISE PUBLIC AQUARIUM - TENANT COMPLETION (20 days - May 18)
PLANS/APPL TAKEN TO FRONT DESK  11/14/2012 DONE
Print Occupancy Form  11/14/2012 DONE
DetailsTisha Gallop
Telephone call  11/14/2012 DONE
DetailsChristina Prado
called Ammon - gave fees due and advised permit is ready to issue pending Rp & GC information
Override - Parcel Holds  11/14/2012  
Override - Parcel Holds  11/14/2012  
Permit Ready to Issue  11/14/2012 DONE
DetailsChristina Prado
Override - Parcel Holds  11/14/2012  
Override - Parcel Holds  11/14/2012  
Issue PAID IN FULL permit  11/14/2012 DONE
DetailsTisha Gallop
Routing - PLAN CHECK11/7/2012 11/13/2012 DONE
DetailsCarl Westfall
Sent back to Plumbing.
Routing - PLUMBING11/13/2012 11/13/2012 PASS
DetailsBill VanDegrift
no plumbing review required for T.I. that isn't food service, medical or hazardous.
Routing - FIRE11/5/2012 11/7/2012 PASS
DetailsScott Arellano
Attached updated plan review comments to plans.
Routing - PLUMBING11/5/2012 11/5/2012 FAIL
DetailsDaryl Spivey
1. Provide an engineered set of plumbing drawing.
2. Resubmit and provide all items requested on previous plumbing plan review dated 4/30/12.
Routing - PUBLIC WORKS11/1/2012 11/5/2012 PASS
DetailsConnie Baumgartner
Routing - Design Review11/5/2012 11/5/2012 PASS
DetailsSarah Schafer
Sarah - new exterior door approved through building permit.
Routing PW Environmental  11/2/2012 PASS
Plan set contains structural details only.
Routing - PLAN CHECK5/22/2012 11/1/2012 PASS
DetailsCarl Westfall
Drawings approved with "red lines".
Plan resubmittals received  10/23/2012 DONE
DetailsChristina Prado
Received three sets of plans marked R1 sheets 1 & 2, three sets of ADA Ramp Designs calcs, and three sets door opening engineering details; Gave to Carl Westfall for further review
Meeting  10/1/2012 DONE
Had a meeting with Ammon Cavino. Jenifer, Scott, Carl W., Rob, Bob, and Jason were in attendance. He was told to get his act together.
Plan resubmittals received  9/14/2012 DONE
rec'd one copy of egress revision sheet - taken to carl w
Plan resubmittals received  7/6/2012 DONE
DetailsTisha Gallop
received two copies of structural calcs; put on Carl Westfall's desk.
Route to Impact Fee Review5/21/20125/24/20125/24/2012 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Routing - FIRE5/21/20125/21/20125/22/2012 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  5/22/2012 FAIL
Failed Public Works, Plumbing, Planning, Plan Check, Fire
Routing - PLAN CHECK5/2/2012 5/21/2012 FAIL
DetailsCarl Westfall
The IBC plan review was started on May 18 and finished on May 21. Revised drawings and additional information required. See the plan review report.
Routing - Design Review4/30/2012 5/2/2012 PASS
DetailsSarah Schafer
Approved.
Routing - PLUMBING4/27/2012 4/30/2012 FAIL
DetailsBill VanDegrift
1. Show all water distribution.
2. Show cross connection control location.
3. Show points of pumps discharge.
4. show all additional plumbing fixtures.
Routing - Erosion and Sediment4/25/2012 4/27/2012 PASS
DetailsClint A Smith
ESC12-00386 plan waiver approved with a site investigation fee included.
Pending Assignment by JCB4/23/2012 4/24/2012 DONE
DetailsJason Blais
Routing PW Environmental4/24/2012 4/24/2012 FAIL
DetailsWalt Baumgartner
West Boise Sewer District jurisdiction. Plans need to show pumps, filter systems that generate wastewater and piping conveying wastewater related to backwash, etc. to points of connection to building sewer line and District sewer collection system. Coordinate w/ City Plumbing supervisor for necessary plan sheet detail.
Routing PW Sewer Rating4/24/2012 4/24/2012 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS  4/24/2012 FAIL
DetailsConnie Baumgartner
Failed by Walt Baumgartner for pretreatment concerns - ###-####
Routing - Addressing4/24/2012 4/24/2012 PASS
DetailsTerry Records
Plans ACCEPTED BY PLAN TECH  4/23/2012 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  4/23/2012 DONE
DetailsTisha Gallop
Intake Approval  4/23/2012 PASS
DetailsJason Blais
Intake approved by Sam Zahorka.
Application received 4/12/20124/12/2012 DONE
DetailsBarbara Stitt
Intake Approval  4/12/2012 FAIL
DetailsSam Zahorka
Refer to the circled items on the checklist attached to this case. SRZ
Telephone call  4/12/2012 DONE
DetailsSam Zahorka
Spoke with Ammon Covino and asked him to call Bill Vandegrift the Plumbing Mechanical Inspector concerning his required plumbing plan submittals for this tenant Improvment. Also asked him to call Walt Baumgartner with the Sewer Enviromental Department. I sent him a ESC Plan Waiver Request template and let him know the ESC department is requiring a ESC permit for identified work going on at the site.